# AUREK — English AUREK supplies ARK series pneumatic industrial manipulators, custom tooling, vacuum handling equipment and jib cranes, configured around workpiece loads… [简体中文](https://www.aurek.cn/llms.txt) / [English](https://www.aurek.cn/en/llms.txt) / [日本語](https://www.aurek.cn/ja/llms.txt) / [한국어](https://www.aurek.cn/ko/llms.txt) / [Deutsch](https://www.aurek.cn/de/llms.txt) / [Français](https://www.aurek.cn/fr/llms.txt) / [Español](https://www.aurek.cn/es/llms.txt) / [Русский](https://www.aurek.cn/ru/llms.txt) ## Main pages - [Custom pneumatic industrial manipulators](https://www.aurek.cn/en/): AUREK supplies ARK series pneumatic industrial manipulators, custom tooling, vacuum handling equipment and jib cranes, configured around workpiece loads… - [Industrial handling product range](https://www.aurek.cn/en/products.html): Select the equipment, match the tooling, and configure the system around installation conditions and the handling path. - [Industrial handling applications](https://www.aurek.cn/en/cases.html): Explore industrial manipulators in manufacturing, assembly and packaging applications. - [Selection FAQ for Pneumatic Industrial Manipulators](https://www.aurek.cn/en/faq.html): AUREK selection questions and answers cover load capacity, mounting arrangements, custom tooling, vacuum gripping, turning and hot-workpiece handling… - [AUREK ARK Series Pneumatic Industrial Manipulators](https://www.aurek.cn/en/products/assist-arm.html): AUREK ARK series pneumatic industrial manipulators assist operators with pick-and-place, machine loading and unloading, and assembly. - [Custom Handling Tooling and End-Effector Solutions](https://www.aurek.cn/en/products/custom-gripper.html): AUREK designs end tooling around the workpiece shape, load-bearing areas and handling motions. - [Articulating Jib Cranes and Workstation Lifting Solutions](https://www.aurek.cn/en/products/jib-crane.html): AUREK jib cranes support workstation lifting, machine loading and unloading, and short-distance transfer. - [Vacuum Lifters and Vacuum Handling Solutions](https://www.aurek.cn/en/products/vacuum-lifter.html): AUREK vacuum handling equipment picks and places cartons, panels, sheet-metal parts and boxes with suitable gripping surfaces. - [Automotive Headliner Turning and Assembly Application](https://www.aurek.cn/en/cases/auto-headliner-flip-assembly.html): A column-mounted pneumatic industrial manipulator with large-area vacuum tooling supports automotive headliners at multiple suction points for lifting… - [Automotive Cover Panel and Battery Enclosure Welding Handling Application](https://www.aurek.cn/en/cases/battery-tray-welding-handling.html): A column-mounted pneumatic industrial manipulator with custom welding-handling tooling assists with gripping… - [Automotive Seat Assembly and Transfer Application](https://www.aurek.cn/en/cases/car-seat-handling.html): A mobile-base pneumatic industrial manipulator with dedicated seat tooling assists with gripping, lifting… - [Carton Vacuum Handling Application](https://www.aurek.cn/en/cases/carton-vacuum-handling.html): A mobile-base pneumatic industrial manipulator with vacuum tooling picks up, lifts, transfers and places cartons… - [Carton Vacuum Handling and Stacking Application](https://www.aurek.cn/en/cases/carton-vacuum-palletizing.html): A pneumatic industrial manipulator with vacuum tooling picks up, lifts, transfers and stacks packaged cartons. - [Disc and Flange Turning, Loading and Unloading Application](https://www.aurek.cn/en/cases/disc-flange-workpiece-flip-loading.html): A pneumatic industrial manipulator with custom clamping and turning tooling picks disc- and flange-shaped metal workpieces from inside equipment, withdraws… - [Frame Workpiece Loading onto a Mesh-Belt Furnace](https://www.aurek.cn/en/cases/frame-workpiece-furnace-loading.html): A column-mounted pneumatic industrial manipulator (150 kg rated load) with adjustable frame-type pneumatic tooling grips frame workpieces at several points, picks them from stacked pallets and places them on a mesh-belt furnace infeed conveyor. - [Thermally Insulated Transfer of Hot Iron Castings](https://www.aurek.cn/en/cases/hot-casting-transfer.html): An overhead-mounted pneumatic industrial manipulator with custom thermally insulated tooling grips… - [Large Metal Workpiece Handling and Turning Application](https://www.aurek.cn/en/cases/large-metal-workpiece-turning.html): A pneumatic industrial manipulator with custom clamping and turning tooling carries the lifting load of large metal workpieces and turns and positions them… - [Mobile Vacuum Handling of Large Packaging Boxes](https://www.aurek.cn/en/cases/large-package-box-mobile-clamping.html): A mobile-base pneumatic industrial manipulator with custom vacuum tooling using side and top suction cups assists with pickup, lifting… - [Large Panel Vacuum Handling and Turning Application](https://www.aurek.cn/en/cases/large-panel-vacuum-turning.html): A pneumatic industrial manipulator with vacuum turning tooling for panels uses multiple suction points to lift, turn through 90° and transfer large panels. - [Motor Stator Handling and Transfer Between Workstations](https://www.aurek.cn/en/cases/motor-stator-handling.html): An overhead-mounted pneumatic industrial manipulator with internal-expansion tooling picks stators through their bore and assists with lifting… - [Mobile Motor Stator Handling Across Multiple Workstations](https://www.aurek.cn/en/cases/motor-stator-mobile-handling.html): A mobile-base pneumatic industrial manipulator with custom internal-expansion tooling assists with stator gripping… - [Power Supply Packing and Handling Application](https://www.aurek.cn/en/cases/power-supply-packing.html): A mobile-base pneumatic industrial manipulator with custom tooling and a dedicated cart assists with gripping… - [Ring Workpiece Handling and Turning Application](https://www.aurek.cn/en/cases/ring-workpiece-turning.html): A pneumatic industrial manipulator with dedicated ring tooling lifts, transfers and turns ring-shaped workpieces while maintaining the grip. - [Mobile Clamping and Handling of Single-Cylinder Engines](https://www.aurek.cn/en/cases/single-cylinder-engine-mobile-handling.html): A mobile-base pneumatic industrial manipulator (50 kg rated load) with custom pneumatic clamping tooling grips single-cylinder air-cooled engines at the cylinder block for lifting, transfer, rotation and placement. - [Work Roll Handling for Grinder Loading and Unloading](https://www.aurek.cn/en/cases/work-roll-grinding-loading.html): An overhead-mounted pneumatic industrial manipulator with adjustable tooling assists with gripping… - [Automotive Parts Handling Solutions](https://www.aurek.cn/en/solutions/automotive-parts-handling.html): AUREK combines pneumatic industrial manipulators and dedicated tooling to assist with pick-and-place, turning and fixture alignment of automotive seats… - [Handling Solutions for Workpieces of 50 kg, 100 kg and Above](https://www.aurek.cn/en/solutions/heavy-workpiece-handling.html): AUREK provides pneumatic industrial manipulators and dedicated tooling for workpieces of 50 kg, 100 kg and above, assisting with lifting… ## Resource center - [Technical Documentation Center](https://www.aurek.cn/en/resources.html): Find selection guidance, operating instructions, maintenance checklists and engineering studies, with downloadable AUREK documents. - [What Should You Do If Handling Equipment Sinks, Drifts or Binds Abnormally?](https://www.aurek.cn/en/resources/abnormal-sink-drift-jam-troubleshooting/): Review possible causes and inspection sequences for sinking, drift, binding, rebound and vacuum faults. Follow safe unloading, withdrawal from service and tagging requirements, assign maintenance responsibilities, and use the fault table for preliminary diagnosis and records. - [How Do Air-Hose Leaks and Loose Fittings Affect Equipment?](https://www.aurek.cn/en/resources/air-leak-and-loose-fittings-impact/): Effects of leaks and loose fittings on motion, gripping and load balance, with site response and prevention methods organized around safe unloading, pneumatic inspection and retesting. - [What Does Annual Maintenance of a Pneumatic Industrial Manipulator Include?](https://www.aurek.cn/en/resources/annual-maintenance-checklist/): Annual checks cover the load-bearing structure, pneumatic balancing system, tooling and protective devices, with requirements for tightening, lubrication, staged trials and defect correction. Use maintenance records and operating conditions to determine subsequent intervals. - [Quantifying Ergonomic Improvement and Operational Release After Deploying a Pneumatic Industrial Manipulator](https://www.aurek.cn/en/resources/assist-arm-ergonomic-improvement-quantification-release/): Classify handling by actual load support, apply RNLE, three-axis force measurement and RAPP within their respective scopes, and use fixed-input examples to quantify improvement, review data and determine operational release. - [Pneumatic Industrial Manipulator Safety Quick Card](https://www.aurek.cn/en/resources/assist-arm-safety-quick-card/): A printable workstation reference covering pre-shift checks, operation, prohibited actions and abnormal-condition response for trained operators and shift handovers. - [Vacuum Handling of Automotive Glass: Cup Layout, Flip Positioning and Vacuum-Loss Protection](https://www.aurek.cn/en/resources/automotive-glass-vacuum-handling/): Select cups and layouts from glass curvature, surface and accessory conditions. Zoned vacuum protection, flip-axis balance, supported release and actual-sample testing address assembly alignment and surface/edge protection. - [Site Conditions to Confirm Before Retrofitting a Pneumatic Industrial Manipulator to an Automotive Production Line](https://www.aurek.cn/en/resources/automotive-line-retrofit-site-checklist/): A site survey checklist covering workpieces, processes, space, structures, utilities and control interfaces for automotive line retrofits, with evidence for dynamic envelopes, interlock states, shutdown planning, equipment selection and installation. - [Gripping Force, Deformation and Surface Protection in Handling Large Automotive Sheet-Metal Parts](https://www.aurek.cn/en/resources/automotive-sheet-metal-grip-deformation-surface-protection/): Methods for suction-point layout, normal load capacity, tangential slip resistance and appearance protection for large automotive sheet-metal parts. Flexible deformation, dynamic trajectories and actual-sample testing establish the release basis for each gripper and process combination. - [Preventing Battery Loads from Dropping After Air or Power Loss](https://www.aurek.cn/en/resources/battery-handling-air-power-loss-protection/): Distinguish supply-air failure, local leakage, power loss and signal faults at battery handling stations. Configure mechanical retention, pressure monitoring, vacuum-decay assessment and release interlocks, with safe-placement and fault-injection acceptance methods. - [Fail-Safe Design and Fault-Injection Validation for Traction Battery Pack Handling Tooling](https://www.aurek.cn/en/resources/battery-pack-fixture-fail-safe-fault-injection/): Develop pneumatic and control diagnostics, fault-injection tests, acceptance records and safe recovery procedures around battery pack load paths, locking and release conditions, with a defined sequence from surrogate loads to actual battery packs. - [Vacuum Gripping Reliability and Dynamic Flipping of Curved Automotive Glass](https://www.aurek.cn/en/resources/curved-automotive-glass-vacuum-dynamic-flip/): Methods for curved-surface contact, suction-cup layout and vacuum zoning, with verification of full-angle flip loads, vacuum hold time, surface protection and fault injection. It defines motion permissions and supported-release conditions for glass handling. - [Safe Handling of EV Battery Modules and Packs: Gripping, Flipping, Positioning and Release Control](https://www.aurek.cn/en/resources/ev-battery-module-pack-safe-handling/): Methods for selecting battery module and pack support points, retaining loads during flipping and positioning for assembly. Model identification, load transfer and abnormal-event response define gripper configuration and loaded verification requirements. - [Retrofitting a Pneumatic Industrial Manipulator to an Existing Production Line: Process and Site Constraints](https://www.aurek.cn/en/resources/existing-line-manipulator-retrofit/): A retrofit process covering site survey, design review, interface prefabrication and loaded commissioning, with checks of foundations, swept space, existing tooling interlocks, shutdown arrangements and complete-cycle acceptance. - [Pneumatic Industrial Manipulator Factory Acceptance Test Record](https://www.aurek.cn/en/resources/factory-acceptance-test-record/): Record equipment, tooling, function, load and packaging checks against project documents, with test evidence, deviations and authorized signatures for factory acceptance and retention by both parties. - [Factory Inspection, Safety Requirements and Standards Applicability for Pneumatic Industrial Manipulators](https://www.aurek.cn/en/resources/factory-inspection-safety-standards/): Organize lifting, pneumatic, mechanical and control inspections by equipment characteristics. Distinguish factory inspection from site acceptance, and define the conditions governing document delivery and certification decisions when preparing a project inspection plan. - [Loss-of-Air Protection, Safe Release and Engineering-Validation Methods for Custom Industrial Handling Tooling](https://www.aurek.cn/en/resources/fixture-air-loss-safe-release/): Organizes tooling design around retention after air loss, state monitoring, release permission and maintenance reset. Equivalent-load calculations and engineering records explain how mechanical, pneumatic and control protection work together. - [Coordinated Lightweight Design of Main Load-Bearing Plate Thickness, Stiffeners and Cutouts for Custom Handling Tooling](https://www.aurek.cn/en/resources/fixture-load-plate-lightweight-design/): Compares the mass, stiffness and cyclic retention of load-bearing plates with different thicknesses, stiffeners and cutouts. Explains design comparison, local stress checks and validation required before design finalization. - [Engineering Study on Preventing Unintended Release and Confirming Load Placement in Custom Handling Grippers](https://www.aurek.cn/en/resources/fixture-misrelease-load-placement/): Define release permissives for mechanical, vacuum and electro-permanent magnetic grippers using height, position, contact and load-transfer confirmation, with requirements for state machines, hardware interlocks, pressure-loss response and acceptance testing. - [Tooling Wear Parts: Replacing Suction Cups, Hoses, Fittings and Seals](https://www.aurek.cn/en/resources/fixture-wear-parts-replacement/): Review inspection points for suction cups, foam pads, hoses, fittings, seals and mechanical wear parts. Recognize wear and leakage symptoms, determine replacement needs under different conditions, and organize spare parts for routine maintenance. - [Flexible Multi-Model Production: Handling Different Automotive Parts with One System](https://www.aurek.cn/en/resources/flexible-multi-model-parts-handling/): A guide to part-family grouping, common machine bodies and quick-change modules for multi-model handling, with verification of mechanical and pneumatic/electrical interfaces, model identification, recipe interlocks and changeover time. - [Foundation Requirements for Installing a Pneumatic Industrial Manipulator](https://www.aurek.cn/en/resources/foundation-requirements-for-manipulator-arm/): Foundation loads and site checks for column-mounted pneumatic industrial manipulators, including bearing capacity, concrete, anchoring, embedded foundations and level, with options where the existing foundation is inadequate. - [Coupled Design of End-Tooling Plate Thickness, Clamping Force and Safety Margin](https://www.aurek.cn/en/resources/gripper-coupling-design/): Evaluate plate thickness, clamping force and safety margin in one process. Compare the effects of supply pressure, stiffness, eccentricity and vacuum slip resistance, and define the roles of analytical screening, finite element review and actual-workpiece testing. - [Handling Requirements Collection Form](https://www.aurek.cn/en/resources/handling-requirements-collection-form/): Record workpiece, motion, cycle-time, installation and utility data in consistent fields, with separate entries for multiple applications, to support enquiries and preliminary engineering assessment. - [Study of Thermal Insulation Structures and Pneumatic Circuit Protection for High-Temperature Workpiece Grippers](https://www.aurek.cn/en/resources/high-temperature-fixture-insulation-design/): An introduction to functional zoning, composite insulation paths and pneumatic circuit protection for high-temperature grippers. Calculations and simulations under defined conditions illustrate requirements for load verification, temperature monitoring, pressure-loss control and cyclic testing. - [Thermal Insulation and Protection for High-Temperature Workpiece Handling](https://www.aurek.cn/en/resources/high-temperature-workpiece-handling/): Assess thermal risks and handling configurations through gripper insulation, component protection, installation layout and operating distance. - [Site Conditions to Confirm Before Installing a Pneumatic Industrial Manipulator](https://www.aurek.cn/en/resources/installation-conditions-for-manipulator-arm/): Site preparation organized around workpieces, handling motions, installation space, foundations and utilities, with priorities for measurement, photography and documentation. - [Daily Inspection Checklist for Pneumatic Industrial Manipulators](https://www.aurek.cn/en/resources/maintenance/daily-inspection-checklist.html): Pre-start and periodic inspection items with records of abnormalities, corrective actions and responsible-person signatures. The form can be printed for team checks, shift handover and maintenance filing. - [Common Mechanical Faults and Corrective Actions](https://www.aurek.cn/en/resources/maintenance/mechanical-troubleshooting.html): Match mechanical fault symptoms to checks of the arms, joints, brakes, base and tooling connections. Follow the investigation sequence and maintenance items, and identify conditions requiring manufacturer support. - [Common Pneumatic Faults and Corrective Actions](https://www.aurek.cn/en/resources/maintenance/pneumatic-troubleshooting.html): Use the symptom-to-check references for the air supply, piping, valves, cylinders and vacuum system, with pre-maintenance safety requirements and conditions requiring manufacturer support. - [Arrival Acceptance and Unpacking Checks for a Pneumatic Industrial Manipulator](https://www.aurek.cn/en/resources/manipulator-arm-arrival-inspection/): Arrival checks before unpacking, after unpacking and for documents/accessories, with requirements for recording abnormalities, checking configuration and resolving issues before installation. - [What Does Pneumatic Industrial Manipulator Commissioning Include?](https://www.aurek.cn/en/resources/manipulator-arm-commissioning-process/): Preparation and testing sequence for site commissioning, including tooling and vacuum checks, training, handover records and reassessment after changes in operating conditions. - [Planning Manipulator Installation Positions: Key Checks to Avoid Interference](https://www.aurek.cn/en/resources/manipulator-arm-placement-planning/): Installation-layout methods based on pickup and placement points, radius, stroke, rotation, tooling and operator position, with clearance requirements for equipment doors, utilities, access routes and maintenance. - [Why Pneumatic Industrial Manipulator Prices Vary: Key Cost Factors](https://www.aurek.cn/en/resources/manipulator-arm-pricing-factors/): Break down the costs of the manipulator, tooling, mounting structure and controls. Explain how load, radius, stroke and site services affect quotations, and compare prices after aligning configuration and scope. - [Safe Operation of Pneumatic Industrial Manipulators: Prohibited Actions](https://www.aurek.cn/en/resources/manipulator-arm-safe-operation/): Review pre-shift checks, grip confirmation, smooth handling and unloading before shutdown. Define prohibitions on overloading, leaving suspended loads unattended, unauthorized pneumatic changes and operation with faults for operator and handover training. - [Choosing Manipulator Tooling: Side Clamps, Hooks, Vacuum and Internal Expansion Compared](https://www.aurek.cn/en/resources/manipulator-fixture-selection-comparison/): Compare contact, support and orientation characteristics across seven end-tooling types. Organize selection by workpiece, process and site, focusing on vacuum suitability, lifting-point strength, surface protection and turning clearance. - [Pre-installation Site Confirmation Checklist](https://www.aurek.cn/en/resources/manual/installation-checklist.html): Check installation information for the workpiece, motions, foundation, utilities and safety conditions, with supporting site photographs and responsible-person records for design assessment and installation preparation. - [Pneumatic Industrial Manipulator Operating Manual](https://www.aurek.cn/en/resources/manual/operation-manual.html): Operating requirements organized by equipment structure, installation and commissioning, operation, maintenance and troubleshooting, retaining project parameters and safety requirements for training and site reference. - [Engineering Study on Occupational Health Risks and Injury Prevention in Manual Handling of Heavy Loads](https://www.aurek.cn/en/resources/manual-handling-injury-prevention/): A guide to identifying multiple manual handling risk factors, the applicability of the NIOSH equation and site risk ranking. It distinguishes peak loads from cumulative exposure and explains process changes, handling aid selection and reassessment after improvements. - [Modular Quick-Change and Error-Proofing Methods for Multi-Model Handling Grippers](https://www.aurek.cn/en/resources/multi-model-fixture-modular-quick-change-poka-yoke/): Methods for configuring modular grippers around part families, quick-change interface loads, tool identification and changeover interlocks, including first-piece confirmation, abnormal-event recovery and verification of every permitted combination. - [Multi-Variant Battery Pack Production: Gripper Quick Change, Identification and Error-Proofing](https://www.aurek.cn/en/resources/multi-spec-battery-pack-quick-change-poka-yoke/): Product-family grouping, quick-change platforms and module storage for battery packs, with consistency checks across model, gripper, recipe and tooling, plus changeover inspection, first-piece confirmation and version control. - [Why Custom Tooling Is So Important to a Pneumatic Industrial Manipulator](https://www.aurek.cn/en/resources/non-standard-fixture-importance/): Distinguish manipulator motion capability from tooling contact functions. Review gripping, surface protection and operating coordination, compare common tooling applications, and identify checks for instability, damage and release risks. - [Site Acceptance for Pneumatic Industrial Manipulators: What Customers Should Check](https://www.aurek.cn/en/resources/on-site-delivery-acceptance/): Review ten categories of site acceptance checks, covering mounting, air supply, loaded operation, tooling safety and takt-time verification. Record results in the checklist, complete documentation and training, and resolve nonconformities. - [Engineering Study on Factors Affecting Operating Feel and Evaluation Methods for Pneumatic Industrial Manipulators](https://www.aurek.cn/en/resources/operating-feel-evaluation/): Breaks operating feel down into operating force, drift, rebound and response delay, with test conditions, measurement methods and diagnostic procedures. Example data illustrate the effects of tooling, pneumatic circuits and ergonomics. - [First-Use Operator Training Checklist for Pneumatic Industrial Manipulators](https://www.aurek.cn/en/resources/operator-first-use-training-checklist/): Starting with equipment structure, workpiece limits and startup inspection, define first-use training procedures, prohibitions, abnormal-condition response and assessment. A training confirmation checklist supports team training and handover checks. - [Assessing Compressed-Air Energy Use, Leakage and Life-Cycle Cost for Pneumatic Industrial Manipulators](https://www.aurek.cn/en/resources/pneumatic-assist-arm-air-consumption-leakage-lifecycle-cost/): Distinguish production air use, leakage, allocated electricity use and actual savings. Define branch metering, pressure assessment and life-cycle costing, with a fixed-input calculation illustrating the project acceptance process. - [Vacuum Gripping, Leakage Compensation and Subsystem Engineering Release for Cartons and Porous Workpieces](https://www.aurek.cn/en/resources/porous-carton-vacuum-gripping-leakage-safe-release/): Evaluate carton porosity, cup sealing and dynamic load capacity through vacuum-source flow checks, zone monitoring and backup energy, with defined requirements for target-carton tests, fault injection and subsystem engineering release. - [Pneumatic Industrial Manipulator Preventive Maintenance Plan and Record](https://www.aurek.cn/en/resources/preventive-maintenance-plan-record/): Schedule inspections by maintenance interval and record dates, measurements, corrective actions and replacement parts, linking the maintenance plan to work records and the equipment history. - [AUREK Product Overview and Quick Selection Handbook](https://www.aurek.cn/en/resources/product-overview-selection-handbook/): An overview of pneumatic industrial manipulators, custom tooling, vacuum handling and workstation lifting, with selection guidance based on workpiece, motion and installation conditions. - [What Should Be Checked Before Restarting Equipment After a Period of Inactivity?](https://www.aurek.cn/en/resources/recommissioning-after-idle/): Organize recommissioning checks around appearance, structure, air supply, vacuum, tooling and protective functions. Follow the unloaded and low-load trial sequence, adjust inspection priorities to the shutdown duration and provide operator refresher training. - [Pneumatic Industrial Manipulator Selection Guide](https://www.aurek.cn/en/resources/selection/sizing-guide.html): Selection methods for total load, working envelope, lifting stroke, tooling and installation, with application information and design-comparison points organized around representative workpieces. - [Pneumatic Industrial Manipulator Site Acceptance Test Record](https://www.aurek.cn/en/resources/site-acceptance-test-record/): Inspect the actual installation and complete handling sequence against project documents, recording measurements, trials, training and outstanding actions for site acceptance and authorized handover. - [Site Survey and Photography Checklist](https://www.aurek.cn/en/resources/site-survey-photo-checklist/): Collect workpiece, handling-path, foundation, clearance and utility data with supporting photographs and file references, making measurement datums, document references and missing information easy to check. - [Can a Pneumatic Industrial Manipulator Be Installed Where Space Is Limited?](https://www.aurek.cn/en/resources/tight-space-installation-options/): Common installation options for restricted workstations, with assessment priorities for working radius, lifting stroke, tooling parking, access routes and overhead load capacity. - [Tire and Wheel Assembly: Reducing Repetitive Supporting and Lifting with a Pneumatic Industrial Manipulator](https://www.aurek.cn/en/resources/tire-wheel-assembly-assist-arm/): Gripper types, center-of-gravity and degrees-of-freedom selection for picking, rotating and aligning tire/wheel assemblies with studs. Workstation layout, variant coverage and abnormal recovery inform cycle-time and ergonomic acceptance. - [Assessing Suitability for Vacuum Handling](https://www.aurek.cn/en/resources/vacuum-handling-suitability/): Evaluate vacuum gripping against the workpiece surface, porosity, weight and stiffness, including cup layout, air-supply matching and auxiliary support. - [Planning Handling-Equipment Clearances Around Welding Guns, Locating Pins and Safety Fences](https://www.aurek.cn/en/resources/welding-station-interference-planning/): Static and dynamic envelope checks for welding stations, including pick-and-place permissions, locating-pin approach, welding-gun accessories and hose/cable protection. It sets out verification of loaded trajectories, incorrect states and abnormal-event recovery. - [Determining the Working Radius of a Pneumatic Industrial Manipulator](https://www.aurek.cn/en/resources/working-radius-selection/): Determine working radius from the mounting center, pick-and-place path and total load. Compare arm length, rotation angle and mounting arrangements, and collect the site data needed for allowances, operator positions and interference checks. ## Technical research 2026-10-25 - [Roll Retention, Cantilever Bending and Load Evolution during a 90-Degree Air-Shaft Flip](https://www.aurek.cn/en/resources/air-shaft-roll-retention-cantilever-flip-load/): This study independently reconciles proposals and countersign drawings for air-shaft manipulators rated at 300 kg and 500 kg. The 300 kg project specifies rolls of 100–180 kg; these are design inputs rather than weighing records. The historical 500 kg proposal specifies a 500 kg roll design condition, whereas the latest available V3 drawing dated 25 October 2026 removes the flip mechanism. Consequently, results above zero degrees for that project are extension cases only. A continuous horizontal-to-downward-vertical model separates axial slip demand, transverse bearing load, root bending, contact reactions and flip actuator demand. Chamber pressure is converted to contact pressure only through explicitly assumed effective actuation area, transmission efficiency and contact area. For a 180 kg roll, a 0.65 m centre-of-mass lever and a vertical load factor of 1.3, the horizontal transverse load is 2.295 kN, root bending is 1.492 kN m and vertical axial demand is 2.295 kN. The 500 kg comparison gives 6.374 kN, 4.143 kN m and 6.374 kN, respectively. A 10,800-point parameter sweep and independent endpoint calculations show why axial friction ratios alone do not establish contact feasibility or structural adequacy. All unmeasured inputs remain explicit assumptions. The work supports model calibration and test planning, not equipment certification. - [Barrel Clamp Force, Frictional Holding and Mechanical Bottom Support](https://www.aurek.cn/en/resources/barrel-clamp-force-friction-mechanical-support/): This study uses a dual-swing-jaw barrel clamp proposal with a rated working load of 310 kg and a stated diameter range of 310–620 mm as a structural reference. It derives the complete load path from cylinder chamber pressures to hinge moment, per-side closing resultant, contact-normal forces and vertical holding capacity. The source drawings establish the topology but do not establish cylinder size, production pivot coordinates, liner properties or allowable barrel-wall pressure. Numerical results therefore belong to an explicitly defined parametric model. For a 160 mm bore, a nominal chamber pressure of 0.625 MPa, cylinder force factor 0.90, linkage efficiency 0.95, workpiece mass 310 kg, upward acceleration 0.25g and friction coefficient 0.40, the flat-contact model produces 6.638–7.597 kN total scalar normal force and friction margins of 0.699–0.800. An ideal self-aligning 90-degree V model produces 9.884–12.463 kN and margins of 1.040–1.312. The 400 and 500 mm cases are research interpolation points between the documented endpoints. Pressure and friction scans reveal coupled slip and wall-pressure limits. Bottom support is evaluated through support reactions, eccentric bending and engagement, rather than a friction safety factor. Its illustrative toe-bending margin is 1.263; complete structural capacity remains unverified. The report supplies reproducible calculations and an original-part verification procedure without claiming equipment certification. - [Heavy-column overturning moments, anchor bolts and foundation bearing](https://www.aurek.cn/en/resources/heavy-column-overturning-anchor-foundation/): This study evaluates a column-mounted manipulator with a rated working load of 500 kg at the existing 2.5 m end-joint radius and a hypothetical 3.5 m extension. Drawing geometry for eight M24 L-shaped cast-in anchors is separated from resistance evidence. A complete load path includes the payload, fixture, arm, counterweight and fixed column. Tension-only anchor springs and compression-only contact are solved with exact polygon integration. Unverified masses, centres of gravity and accelerations are explicit research inputs. Under the representative combined case, overturning moments are 25.39 and 34.83 kN m, and peak individual anchor tensions are 9.65 and 14.11 kN. For the suggested 1.5 by 1.5 by 0.8 m footing, peak soil pressures are 113.4 and 214.7 kPa, with contact fractions of 66.2% and 34.0%. The 3.5 m pressure maximum occurs near 24 degrees rather than necessarily along an edge or diagonal. Steel, plate bending, concrete anchorage, footing structure and ground bearing are assessed separately. Thirty-four numerical verification checks support the calculation implementation. The conditional results do not certify the actual equipment, anchorage or foundation, and do not authorize extending the existing machine to 3.5 m. - [CAD-based Fixture Mass, Interference and Contact Review](https://www.aurek.cn/en/resources/cad-fixture-mass-interference-contact-review/): A reproducible CAD review workflow is developed for fixture mass, solid interference, nominal contact and sampled motion. Six candidates were screened. The selected inputs are a fixed vacuum frame (A), a cylindrical-gripper assembly snapshot (B), and an existing conceptual side-clamping/tilting design (C), containing 467 valid solids in total. Versioned STEP copies, hashes, units and assembly occurrences are retained. B-representation volume integration and Boolean common operations identify 154, 8 and 85 positive-volume overlap pairs at a reporting threshold of 0.001 mm³. These counts include simplified mating representations and are not defect counts. In C, a 180 mm opening adds 12 overlap pairs relative to the 152.4 mm baseline; at 90° tilt, six cross-motion-group overlaps occur, with a maximum pair volume of 74,592 mm³. Four planar pads give 960 mm² of nominal CAD contact. Tangent curved interfaces in A and B demonstrate that zero gap does not imply finite load-bearing contact area. The 29.200 kg estimate for C covers fabricated geometry only under the original density assumptions. Analytical checks, tetrahedral mesh integration and archived endpoint comparisons support the numerical findings. The results do not establish structural capacity, grip retention or safety certification. - [Mobile Manipulator Stability, Levelling and Support Transfer](https://www.aurek.cn/en/resources/mobile-manipulator-stability-support-transfer/): This study examines foot-supported operation, unloaded caster travel and support transfer for an 80 kg rated mobile pneumatic manipulator. The original proposal establishes the arrangement and unloading requirement, but does not quantify chassis geometry, mass properties, caster ratings or jack travel. These quantities are therefore explicit study inputs. A quasistatic external-wrench model combines the convex hull of active contacts, the resultant centre of pressure and edge moments. Arm, slope and horizontal-force directions are searched independently; normal-reaction feasibility is checked separately. In the reference case, the assumed foot span is 1.70 by 1.40 m, unloaded mass is 525 kg, payload is 80 kg, end-centre radius is 2.00 m, payload offset is 0.25 m and horizontal force is 200 N. Minimum margins at research inclinations of 0, 2 and 5 degrees are 131.9, 107.0 and 69.4 mm. The rearward arm position controls because the fixed rear ballast lies on the same side. The corresponding unloaded, stowed four-caster margins are 366.1, 345.4 and 314.2 mm, whereas loss of an adverse corner during transfer yields a negative margin even on level ground. These are conditional computational results, not certified machine capacities, permitted slopes or permission for loaded travel.