Los informes PDF y Word están en chino e incluyen un resumen en inglés.
Resumen
Este resumen distingue los parámetros documentados del proyecto de las hipótesis paramétricas. Los cálculos no sustituyen la validación de la máquina concreta. El resumen inglés recoge los resultados y sus límites.
A reproducible CAD review workflow is developed for fixture mass, solid interference, nominal contact and sampled motion. Six candidates were screened. The selected inputs are a fixed vacuum frame (A), a cylindrical-gripper assembly snapshot (B), and an existing conceptual side-clamping/tilting design (C), containing 467 valid solids in total. Versioned STEP copies, hashes, units and assembly occurrences are retained. B-representation volume integration and Boolean common operations identify 154, 8 and 85 positive-volume overlap pairs at a reporting threshold of 0.001 mm³. These counts include simplified mating representations and are not defect counts. In C, a 180 mm opening adds 12 overlap pairs relative to the 152.4 mm baseline; at 90° tilt, six cross-motion-group overlaps occur, with a maximum pair volume of 74,592 mm³. Four planar pads give 960 mm² of nominal CAD contact. Tangent curved interfaces in A and B demonstrate that zero gap does not imply finite load-bearing contact area. The 29.200 kg estimate for C covers fabricated geometry only under the original density assumptions. Analytical checks, tetrahedral mesh integration and archived endpoint comparisons support the numerical findings. The results do not establish structural capacity, grip retention or safety certification.
Keywords: fixture; CAD; mass and centroid; solid interference; nominal contact; motion collision
Texto completo en chino
Los informes PDF y Word están en chino e incluyen un resumen en inglés.

