PDF와 Word 보고서의 본문은 중국어이며 영문 초록이 포함됩니다.
초록
본 연구는 자료로 확인된 설계 조건과 매개변수 해석의 가정을 구분합니다. 계산 결과는 해당 장비의 실물 검증을 대신하지 않습니다. 아래 영문 초록에 결과와 적용 한계를 제시합니다.
A reproducible CAD review workflow is developed for fixture mass, solid interference, nominal contact and sampled motion. Six candidates were screened. The selected inputs are a fixed vacuum frame (A), a cylindrical-gripper assembly snapshot (B), and an existing conceptual side-clamping/tilting design (C), containing 467 valid solids in total. Versioned STEP copies, hashes, units and assembly occurrences are retained. B-representation volume integration and Boolean common operations identify 154, 8 and 85 positive-volume overlap pairs at a reporting threshold of 0.001 mm³. These counts include simplified mating representations and are not defect counts. In C, a 180 mm opening adds 12 overlap pairs relative to the 152.4 mm baseline; at 90° tilt, six cross-motion-group overlaps occur, with a maximum pair volume of 74,592 mm³. Four planar pads give 960 mm² of nominal CAD contact. Tangent curved interfaces in A and B demonstrate that zero gap does not imply finite load-bearing contact area. The 29.200 kg estimate for C covers fabricated geometry only under the original density assumptions. Analytical checks, tetrahedral mesh integration and archived endpoint comparisons support the numerical findings. The results do not establish structural capacity, grip retention or safety certification.
Keywords: fixture; CAD; mass and centroid; solid interference; nominal contact; motion collision
중국어 전문
PDF와 Word 보고서의 본문은 중국어이며 영문 초록이 포함됩니다.

