Complete English text is available on this page. The PDF and DOCX downloads are in Chinese and include an English abstract.
Abstract
This study develops a reproducible review workflow for fixture mass, solid interference, nominal contact and motion collision using three-dimensional models. Six candidates were screened, and three were selected: a fixed vacuum frame (A), a cylindrical parallel-gripper solid snapshot (B), and an existing conceptual side-clamping and tilting design (C). The three inputs contain 467 valid solids in total, with versions, hashes, length units, assembly occurrences and transformations retained. Boundary-representation volume integration and Boolean solid intersections identify 154/8/85 positive-volume overlap pairs for A/B/C at a reporting threshold of 0.001 mm³. Fixed mating interfaces, simplified envelopes and numerical thin layers are evaluated separately according to their modeling meaning. In C, a 180 mm opening introduces 12 overlap pairs relative to the 152.4 mm baseline; at 90° tilt, six cross-motion-group overlaps occur, including a 74592 mm³ intersection between the locking envelope and the upper crossbeam. C has four nominal planar contact patches totaling 960 mm². Tangent curved interfaces in A and B demonstrate that zero gap does not imply finite contact area. The estimated mass of C’s fabricated parts is 29.200 kg under the original design density assumptions and does not represent the complete fixture. Representative intersections are checked using analytical expressions and independent triangular-mesh integration; centroid differences at archived motion endpoints are below 10⁻⁸ mm. The method exposes missing assembly semantics and omissions in the scope of checks. It does not establish strength, grip retention or equipment safety.
Keywords: fixture; CAD; mass and centroid; solid interference; nominal contact; motion collision
Key findings
- Two project assembly models and one existing conceptual motion example were selected from six candidates, totaling 467 valid solids. STEP copies were used for all primary analyses.
- A/B/C yielded 154/8/85 positive-volume overlap pairs. These counts include simplified mating representations and internal assembly overlaps and cannot be interpreted directly as numbers of manufacturing defects.
- In C, a clear opening of 180 mm adds 12 overlap pairs relative to the 152.4 mm baseline. At 90° tilt, six cross-motion-group overlaps occur; the largest single intersection is 74592 mm³.
- C has a nominal planar contact area of 960 mm². The tangent curved lips in A and tangent cylinder in B produce no finite area in the rigid-body geometry model. Actual effective contact requires evidence of deformation or measurement.
- C’s fabricated geometry has a conditional mass of 29.200 kg. Missing physical component masses and densities prevent this value from being treated as the complete fixture mass.
Study boundaries
- A and B are existing project assemblies; C is an existing conceptual design used to examine the motion-review method.
- Where complete density data are unavailable, only conditional masses are reported. Envelope geometry is not treated as the actual mass of a complete machine.
- Solid intersections, nominal contact and discretely sampled motion do not establish strength or safety.
- Motion analysis is not applicable to A. B’s full travel is unverified. C covers only the stated actions and samples.
Research questions and scope
The central issue in a CAD review is whether its outputs correspond to the correct assembly boundary, materials, workpiece and motions—not simply whether it can produce a mass value or an image of intersecting parts. Volume describes occupied geometry, while contact describes interface compatibility; neither automatically establishes strength or gripping safety. This study poses four testable questions along that evidence chain: are all solids counted, is density managed independently of volume, are reported overlaps based on actual solid intersections, and do motion and contact analyses have interpretable inputs?
Cases A and B are exports of existing project assemblies. Case C comes from an existing project concept and includes actuator installation envelopes and a workpiece reconstructed from drawings. The existence of a model does not mean that the equipment has been manufactured. The study retains the geometric facts of A/B and uses C’s existing motion parameters to examine the complete motion-review procedure.
| Case | Model identity | Reason for selection | Applicability limits |
|---|---|---|---|
| A | Fixed vacuum frame, 2026-10-14 | Many repeated occurrences, including 30 suction cups and 12 cross-clamp assemblies | Fixed working pose; no physical workpiece or complete density table |
| B | Cylindrical parallel gripper V2 snapshot, 2026-10-04 | 55 source solids plus an 8-solid welded jaw on each side | Current assembly geometry retained; motion mates do not transfer with the snapshot |
| C | Side-clamping and tilting concept V1, 2026-09-18 | Opening, tilt and horizontal-rotation parameters, plus archived endpoints | Actuators are envelopes and the workpiece is reconstructed; not a manufacturing model |
The other three candidates were a simplified glass-handling vacuum frame, a structural-profile load-bearing beam frame, and an existing optimized end-cover fixture model. The first two either duplicate the structural coverage of A or lack a defined gripping-jaw boundary. The third is associated with the original case family and was not prioritized when screening other fixtures for this study. Candidate versions, dimensional units, densities and the availability of motion inputs were recorded individually.
Study boundary: This is a computational study of existing CAD and explicitly parameterized inputs. No weighing, contact-imprint measurement, grip-slip testing, strength testing or on-site motion testing was performed. No equipment-safety or production-release conclusion was signed off.
Inputs and methods
Input identity is established by the SHA-256 hash of the file contents; file timestamps and STEP header timestamps are also retained. These records identify versions and do not establish design validity. Analysis is performed on independent copies without connecting to an active native-CAD session. All models explicitly use millimeters; hashes of the originals, analysis copies and final rereads match. Public figures contain only anonymized CAD shapes, coordinates and research identifiers. [8–10]
| Input | Value or status | Classification | Treatment |
|---|---|---|---|
| A/B/C solid counts | 305 / 71 / 91 | Extracted from models | Calculated per occurrence; C includes 1 workpiece solid |
| Actual density of each part in A/B | Not established | Study limitation | Report volume, volume centroid and uniform-density references |
| Densities of C’s fabricated parts | 2700, 7850 kg/m³ | Original design assumptions | Assigned part by part using the original script; fabricated subset only |
| C workpiece mass input | 20 kg | Design maximum workpiece mass | Kept separate from geometric estimates and measured mass |
| C clear opening / design travel per jaw | 120–180 / 30 mm | Original design parameters | Empty-gripper samples every 5 mm, with an added 152.4 mm baseline |
| C tilt axis / range | Y-directed, through (0,0,100) mm / 0–90° | Original design parameters | Sample every 5°; check all solids across motion groups |
| C horizontal rotation / lift | 0–180° / 270 mm | Original design parameters | Rotation every 15°; table assumed at z=0 |
| B study cylinder | R=113.471265 mm, L=100 mm | Derived parametric geometry | Equidistant from four inward-facing planes; not the actual workpiece |
| Volume reporting threshold | 0.001 mm³ | Numerical setting | Filters only numerical residues; not an allowable interference volume |
Assembly import uses XDE’s definition–occurrence structure, multiplies placement matrices successively through the hierarchy, and counts solids at the leaf nodes. A’s 305 solids are not 305 distinct part types: 48 tie bolts, 48 locking-nut assemblies and 30 sets of suction-cup accessories must be retained as occurrences. B’s reference body is a 55-solid snapshot; one component name must not be equated with one solid. Volumes are summed by part/solid occurrence, without first fusing the complete assembly or deduplicating identical names. [4]
T is a 4×4 homogeneous transformation, with translation components in mm. Each transformation applies only to its corresponding occurrence; already accumulated placements are not applied again.
The workflow proceeds through input-identity verification, occurrence expansion, solid-validity checks, geometric integration, bounding-box candidate screening, Boolean solid intersections, review of contact semantics, and motion scans. BRepCheck_Analyzer checks only topological/geometric shape validity. All 467 solids returned valid in this study. This result does not assess whether the mechanism can be assembled or whether it can carry load. [5]



Mathematical models and derivations
Volume integration is performed independently for each closed solid. In the kernel’s volume-property framework without assigned density, the return value named Mass represents volume, not kg. Material density is assigned from a separate input table; the conversion from mm³ to m³ uses 10⁻⁹. [1]
ρ is in kg/m³, V in mm³, m in kg, and c in mm. With a uniform density across all solids, the center of gravity coincides with the volume centroid; this need not hold for an actual assembly made of multiple materials.
Where part solids penetrate one another, this study retains the sum of conditional masses defined for the individual parts and reports penetration separately. Computing mass after fusing all solids would silently subtract overlapping material and conceal assembly or envelope-modeling issues. For the external shape of a hollow actuator, assigning the mass of solid steel is still a physical-modeling error even if the volume calculation is correct.
S denotes a BRep solid. An intersection is listed as a positive-volume overlap only when Vij exceeds the reporting threshold; its centroid and bounding extent are recorded. Contact faces or edges may have zero intersection volume.
Bounding-box intersections only reduce the number of solid pairs requiring intersection operations. Every positive-volume record comes from a Boolean Common operation. Boolean failures are reported separately and are not classified as “no interference.” The sum of pairwise intersection volumes is not the union volume of all overlapping regions and cannot directly correct the total mass. [2]
Γ denotes a nominal coplanar contact patch verified against the workpiece boundary; n denotes orientation. N is the normal force and p is the actual pressure. Geometric area and normals alone cannot determine pressure or normal force.
Actual faces are selected first, with topological orientation taken into account. Workpiece distance, opposing normals and coplanar extent are then checked. A zero minimum distance may indicate only point or line tangency. Simply summing entire pad-face areas or recessed annular suction-cup faces overstates contact. Effective load-bearing area also depends on compliance, roughness, preload, local yielding and seal condition. This study defines only nominal geometric contact area within a rigid-body boundary model. [3,6]
When a plane geometrically cuts into B’s study cylinder by δ, the section satisfies (R−δ)²+(b/2)²=R². With L=100 mm, this expression is a band-width proxy, not a Hertzian contact or rubber-deformation solution.
C’s rotating group undergoes rigid rotation about the specified Y-directed axis; the yoke group does not follow this tilt. A separate translation of (0,0,270) mm is added after rotation for lifting. It must not overwrite the translation component introduced by rotation about the offset axis.
w is the clear opening in mm. Clamping beams, fingers, sliders and racks move in groups defined by the original design. The cylinder-rod envelope length varies with w and is reconstructed from the original source code. h is the minimum clearance above the assumed table.
Jaw opening, tilt and horizontal rotation are scanned separately according to the existing motion definitions; incompatible actions are not arbitrarily combined. C’s opening scan uses an empty gripper. The tilt scan uses the 152.4 mm clamping baseline with the workpiece moving with the gripper. Horizontal rotation is checked after 90° tilt, between the moving group and the upper fixed interface. A has no jaw-opening degree of freedom in its fixed setup, so this item is not applicable. B’s retained fixed snapshot of three components is insufficient to recover the original constraints. Its motion is classified as unverified, and no opening stroke is invented.
Case studies and results
| Case | Geometric volume / mm³ | Mass result / kg | Centroid / mm | Meaning of the result |
|---|---|---|---|---|
| A | 22327994.879 | 60.286 (ρ=2700); 175.275 (ρ=7850) | (0.000, −37.449, 0.095) | Uniform-density references and volume centroid; not a range for actual total mass |
| B | 3286767.426 | 8.874 (ρ=2700); 25.801 (ρ=7850) | (−0.254, −139.429, 0.036) | Uniform-density references; the two jaws alone are estimated at 8.732 kg using 7850 |
| C | Fabricated subset integrated part by part using the original design | 29.200 (fabricated parts only) | (5.950, −26.753, 183.095) | Excludes the workpiece, actuator/guide/bearing envelopes and unmodeled accessories |
The material inputs for A and B are insufficient to determine actual complete-assembly mass and center of gravity, so Table 3 deliberately retains the conditional nature of the results. Changing their uniform density from 2700 to 7850 kg/m³ scales mass proportionally while leaving the volume centroid unchanged. This does not imply that the center of gravity of a multiple-material assembly remains unchanged. B’s two jaws have a solid volume of 1112407.842 mm³, giving 8.732 kg at the steel-like density of 7850 kg/m³. The remaining 2174359.584 mm³ still requires actual component masses to complete the mass assessment.
C’s reconstructed workpiece has a volume of 3237841.623 mm³. Assuming homogeneous steel at 7850 kg/m³ gives 25.417 kg, approximately 27.1% above the original 20 kg design input. This difference may arise from reconstructed internal geometry or material assumptions; the smaller value cannot simply be selected as the conclusion. The 20 kg value is a design input, and 25.417 kg is a conditional geometric estimate. Neither is a weighing result, and this study does not use either value to declare load suitability.
| Case | All solid pairs | Bounding-box candidates | Zero-volume candidates | Positive-volume overlaps | Sum of pairwise intersection volumes / mm³ |
|---|---|---|---|---|---|
| A | 46360 | 686 | 532 | 154 | 167310.068 |
| B | 2485 | 109 | 101 | 8 | 4888.833 |
| C | 4095 | 179 | 94 | 85 | 300993.699 |
All candidate Boolean operations succeeded. The reporting threshold is 0.001 mm³; the sum of intersection volumes is not a union volume.
A’s 150 larger overlaps are concentrated within 30 repeated suction-cup accessory sets, with five pairs per set. They must be assessed against the simplified thread/mating representations of rods, nuts and brackets; part names alone do not justify automatic exemptions. The remaining four pairs involve upper pressure plates and end bumper components, with individual volumes of approximately 0.003369 or 0.018000 mm³ and an X-direction penetration thickness of approximately 0.000060 mm. These are sensitive to numerical effects and nominal mating and must be distinguished from model tolerances.
B’s eight overlap pairs include mating regions between cylinder rods and rod-end parts/locknuts on both sides, together with thin-layer regions within four guide assemblies. The welded-jaw solids introduce no additional positive-volume intersections in the current pose. The 717.2 mm³ overlap in a guide assembly is a 65.2×11×1 mm rectangular layer; it must not be misreported as a collision between the two jaws and the workpiece. C’s 85 static pairs include solid envelopes, guide rails and sliders, racks and gears, and fabricated joints. The original design is a conceptual layout, so the count itself is not a number of manufacturing defects.
| Case and objects | Volume / mm³ | Intersection centroid / mm | Engineering interpretation |
|---|---|---|---|
| A: bracket–axial suction-cup accessory | 3619.115 | (1910.000, −35.000, 520.402) | Repeated mating region; actual hole, thread and assembly definitions are needed for assessment |
| B: two solids inside a guide assembly | 717.200 | (87.000, −88.500, 0.000) | Rectangular thin layer within the assembly; analytical cross-check agrees |
| C: 180 mm opening, clevis bridge–side frame | 14094.000 | (−217.500, −231.250, 93.500) | New relative to the clamping baseline; conflict between a moving part and a side frame |
| C: 90° tilt, locking envelope–upper crossbeam | 74592.000 | (0.000, 41.300, 398.209) | Cross-motion-group conflict; revise the concept or substitute actual components, then recheck |
Coordinates use the imported coordinate system of each case. Public figures contain no customer identifiers.


| Case | Interface definition | Geometric area result | Normals and distribution | Cannot establish |
|---|---|---|---|---|
| A | 30 undeformed curved lips, each against its own reference tangent plane | Finite area is 0; recessed annular area of 20911.226 mm² rejected | Reference working normal (0,−1,0); see Figure 1 for cup distribution | Actual seal area, vacuum retention force or compliant compression |
| B | Four pads against the tangent study cylinder | Rigid-body line-contact area is 0; total available pad-face area is 29238.044 mm² | (±0.939693, ±0.342020,0); contact lines along Z, length 100 mm | Actual workpiece contact bands, pressure or slip resistance |
| C | 4 flat pads against the planes of a 152.4 mm workpiece | 4×30×8=960 mm² | Opposing normals ±Y; X=±52.5 mm, Z=6–14 mm | Actual load-bearing area on rough surfaces or retention force |
Each recessed planar annulus in A has an area of 697.040870 mm², geometrically equal to π(45.625²−43.125²). However, this plane is set back 7.500 mm from the outermost curved lip. The total 20911.226 mm² therefore cannot be used as the working contact area. Intersecting each of the 30 curved lips with its own reference tangent plane produces no finite face region. Model variations of approximately 0.00012 mm occur in the Y positions of these tangent planes, so the result does not establish that all 30 cups simultaneously seat fully on one ideal rigid plane.
The four inward-facing pad planes in B are each 113.471265 mm from the cylinder center at (0,−370,0). For a reference cylinder of that radius and length 100 mm, all four minimum gaps are below 10⁻⁹ mm, the solid-intersection volume is 0, and the common surface area is also 0. This is a geometric counterexample based on tangent line contact. Finite actual contact area must arise from deformation of the pad or workpiece; it cannot be replaced by an assumption that all four pad faces are in full contact.
| Motion | Sampling | Solid-intersection result | Interpretation and limits |
|---|---|---|---|
| A jaw opening | Not applicable | The fixed working setup has no jaw-opening degree of freedom | No stroke was invented |
| B jaw opening | Unverified | The fixed snapshot cannot recover the complete motion constraints | Current-pose results cannot be extrapolated to full travel |
| C empty-gripper opening | 120–180 mm every 5 mm, plus 152.4 mm; 14 states | 4 new pairs at 175 mm; 12 new pairs at 180 mm | New relative to the 152.4 mm baseline; no new pairs at the 170 mm sample |
| C tilt | 0–90° every 5°; 19 states | Cross-group overlaps from the 70° sample; 6 pairs at 90° | Not a continuous solution for the first-contact angle |
| C horizontal rotation | After 90° tilt, 0–180° every 15°; 13 states | No positive-volume intersections detected against the upper fixed interface | Does not remove existing tilt interference; excludes external equipment and hoses |
At a 175 mm opening in C, four clevis bridges develop new overlaps with the side frames. At 180 mm, the overlaps extend to the actuator arms, clevis bridges and pins, totaling 12 pairs. At 90° tilt, both side frames, one rear cap, the cylinder barrel, the front cap and the locking envelope intersect the upper crossbeam. The maximum intersection of 74592 mm³ is not a numerical residue. The original records checked rotating parts only against the yoke uprights and did not cover the upper crossbeam. Expanding the set of solid pairs therefore reveals conflicts; the earlier local “no penetration” conclusion must not be carried forward. [10]
After the original design lift of 270 mm, the minimum table clearance in the tilt samples is approximately 46.933 mm at 80°; it is 52 mm at 90°. Positive table clearance coexists with an internal collision against the upper crossbeam. This shows that the lowest point of the swept geometry and internal solid collisions are separate conditions. Raising the entire fixture does not change relative penetration between its internal components.

Parameter sensitivity and engineering discussion
Scaling all densities together illustrates the linearity of the mass model. Multiplying the densities of C’s fabricated parts by 0.9–1.1 changes their conditional mass from 26.280 to 32.120 kg while leaving the center of gravity of that subset unchanged. This is a methodological perturbation range, not an allowable material-density tolerance. Changing the density of only one component shifts the center of gravity toward that component as its density increases. Actual component masses must therefore be reweighted when they become available; the uniform-density volume centroid cannot simply be retained.
Sensitivity to the density of an individual part. An unknown component farther from the current center of gravity has a greater influence on center-of-gravity error.
In B’s geometric band-width proxy, δ=0.01, 0.1 and 1 mm give total areas for four bands of approximately 1205.142, 3810.239 and 12025.108 mm², respectively. Even with R and L known, small indentation changes can therefore substantially alter contact area. This calculation defines no material constitutive law and does not derive δ from clamping force, so actual contact pressure cannot be obtained from the curve. A physical study of pad contact also requires preload, material, thickness, curvature and boundary constraints.
Increasing the reporting threshold can hide numerical thin layers but cannot resolve large-scale collisions. In A, raising the threshold from 0.001 to 0.01 mm³ reduces the count from 154 to 152 pairs; at 0.1 mm³ it is 150 pairs. B and C remain at eight and 85 pairs, respectively, over 0.001–100 mm³. A 0.000060 mm layer and a dynamic collision of tens of thousands of mm³ clearly require different dispositions. The threshold is not a manufacturing tolerance; permissible mating conditions must be defined by the actual interface.
Motion sampling can detect collisions, but the absence of a detected collision does not establish a collision-free continuous path. An angular step Δθ corresponds to an approximate displacement bound of rΔθ at radius r; narrow obstacles may lie between samples. The present results are sufficient to reject the assumption that C’s existing conceptual layout is collision-free throughout its motion. Discrete sampling does not weaken the positive-volume intersections already found. Demonstrating that a revised path is usable would require adaptive subdivision, conservative distance bounds or a continuous-collision algorithm, including receiving equipment, hoses and actual accessories.
This study calculates neither stress nor safety factors. Even after all overlaps are eliminated, fingers, welds, pins, bolts, bearings, actuators and brakes must be assessed along the actual load path. A nominal area of 960 mm² likewise does not establish frictional retention, compliant-pad bearing capacity or retention following pressure loss. Model geometry supplies inputs to those studies and cannot replace them.
Conclusions and validation methods
- Assembly occurrences, units and densities should be managed separately. The 467 valid solids in this study establish that the geometric inputs can be analyzed; missing actual densities for A/B and simplified envelopes in C still limit conclusions about actual total mass.
- Boolean solid intersections provide the basis for interference records. The 154/8/85 positive-volume pairs in A/B/C must be assessed according to mating semantics. Bounding-box candidate counts must not be treated as collision counts.
- Checks across complete motion groups reveal layout conflicts in C at large openings and near the end of tilt. A 180 mm opening adds 12 pairs, and 90° tilt gives six cross-group pairs. Neither local upright checks nor table clearance covers the upper crossbeam.
- Contact review must first establish the workpiece and the effective interface. A’s recessed annular faces must be excluded; B’s rigid tangent cylinder gives only line contact. C has 960 mm² of nominal planar area, but its actual pressure distribution remains undetermined.
- The findings support model corrections, completion of physical inputs and wider checking coverage. They do not constitute load-capacity approval, safety approval or manufacturing release.
| Object | Independent method | Result | Coverage |
|---|---|---|---|
| A representative intersection | Oriented-tetrahedron integration of 1072 triangles | 3616.309 vs BRep 3619.115 mm³; relative difference 0.07754% | Independent discrete integration, not a second CAD kernel |
| B representative intersection | 65.2×11×1 mm analytical expression and integration of 12 triangles | 717.200 mm³; agreement within floating-point precision | Thin-layer intersection within the assembly |
| C critical intersection at 90° | Hollow-section expression: (110×25−98×19)×84 | 74592 mm³; agrees with the Boolean result | Locking envelope–upper crossbeam |
| C contact faces | 4×30×8 mm analytical expression | 960.000 mm² | Nominal planar contact |
| C archived endpoints | Independent import and comparison of STEP files for 180 mm opening and 90° tilt | Maximum centroid difference <10⁻⁸ mm; maximum volume difference <1.1×10⁻⁷ mm³ | Part-by-part comparison of 90/91 solids |
| B historical source-CAD volume | Sum of 55 source-solid volumes compared with STEP | Relative difference −0.0001466% | Checks the magnitude of snapshot volume-conversion error |
| Representative conditions in A/B/C | Item-by-item visual review of anonymized local views, coordinates and intersections | The study executor reviewed at least 1 condition per case | Does not replace sign-off by an independent engineer |
All 14 numerical cross-checks were within their respective thresholds. Analytical expressions verify B’s thin-layer dimensions and the intersection with C’s hollow crossbeam. Triangular-mesh integration recalculates representative volumes using an independent oriented-tetrahedron formula; A shows an explainable error due to curved-surface discretization. [7] Comparing C’s archived endpoints tests the rotation-axis location and accumulated transformations, rather than merely the self-consistency of a single function.
Passing the numerical checks establishes only that the listed checks passed. Work not performed includes full physical weighing and center-of-gravity measurement for A/B, reconstruction of B’s full motion range, measurement of actual effective contact area for all cases, proof of collision freedom along complete continuous paths, strength/safety certification, and sign-off by an independent engineer. A’s motion item is not applicable; this must be distinguished strictly from B’s unverified motion.
Future physical validation could determine the center of gravity through individual-part weighing and multipoint support reactions, confirm contact bands using pressure-sensitive media or quantifiable imprints, and then verify trajectories at low speed with actual accessories assembled. Weighing must account for differences in the included workpiece and suspended accessories. Contact tests should record preload, material, surface and pressure conditions. These are proposed validation routes; this study does not record them as completed tests.
References
- Open CASCADE Technology. BRepGProp Class Reference. OCCT 8.0.1. Official source
- Open CASCADE Technology. BRepAlgoAPI_Common Class Reference. OCCT 8.0.1. Official source
- Open CASCADE Technology. BRepExtrema_DistShapeShape Class Reference. OCCT 8.0.1. Official source
- Open Cascade SAS. Extended Data Exchange (XDE), official project documentation archive. Official source
- Open CASCADE Technology. BRepCheck_Analyzer Class Reference. OCCT 8.0.1. Official source
- Open CASCADE Technology. BRepAdaptor_Surface Class Reference. OCCT 8.0.1. Official source
- Open CASCADE Technology. BRepMesh_IncrementalMesh Class Reference. OCCT 8.0.1. Official source
- Anonymized project archive A. Fixed vacuum frame assembly STEP and structural description, state dated 2026-10-14; evidence snapshot for this study.
- Anonymized project archive B. Cylindrical parallel gripper with welded jaws, V2 assembly STEP and source-solid snapshot records, 2026-10-04; evidence snapshot for this study.
- Anonymized project archive C. Side-clamping and tilting fixture concept layout V1, 2026-09-18; parametric source code, state STEP files and design description.
Appendix A. Reproducible methods and file relationships
Archived input tables and model copies together form the reproduction baseline. Running the calculation entry point produces solid inventories, static intersections, nominal contact, motion states, mass sensitivity, scientific figures and independent cross-check results in sequence. Model coordinates, transformation matrices, each intersection’s volume and location, failures and original hashes are retained in the research data. The public manuscript uses only anonymized identities.
For consistently oriented, closed triangular surfaces, integration uses oriented tetrahedra with the origin as the fourth vertex. Reversed triangles are corrected according to topological orientation. Triangulation of curved surfaces introduces approximation error.
The main dependencies are Python 3.12 and OCP/OCCT 8.0.1; scientific plots use Matplotlib and NumPy. Boolean intersections use the original BRep geometry, not image pixels or bounding-box volumes. Input models are not regenerated. Original project source code is retained only as the basis for motion and density inputs.
Download the report
This webpage provides the complete English text. The downloadable PDF and DOCX retain the original Chinese full text and include an English abstract.
