Abstract
This study evaluates a column-mounted manipulator with a rated working load of 500 kg at the existing 2.5 m end-joint radius and a hypothetical 3.5 m extension. Drawing geometry for eight M24 L-shaped cast-in anchors is separated from resistance evidence. A complete load path includes the payload, fixture, arm, counterweight and fixed column. Tension-only anchor springs and compression-only contact are solved with exact polygon integration. Unverified masses, centres of gravity and accelerations are explicit research inputs. Under the representative combined case, overturning moments are 25.39 and 34.83 kN m, and peak individual anchor tensions are 9.65 and 14.11 kN. For the suggested 1.5 by 1.5 by 0.8 m footing, peak soil pressures are 113.4 and 214.7 kPa, with contact fractions of 66.2% and 34.0%. The 3.5 m pressure maximum occurs near 24 degrees rather than necessarily along an edge or diagonal. Steel, plate bending, concrete anchorage, footing structure and ground bearing are assessed separately. Thirty-four numerical verification checks support the calculation implementation. The conditional results do not certify the actual equipment, anchorage or foundation, and do not authorize extending the existing machine to 3.5 m.
Keywords: column-mounted manipulator; overturning moment; anchor group; unilateral contact; eccentric footing pressure; parametric study
Key findings
- Representative combined case: overturning moments at R2.5 m and R3.5 m are 25.39 and 34.83 kN·m, respectively, including the payload, fixture, arm, counterweight and horizontal dynamic actions.
- Representative unilateral-contact model: peak individual anchor tensions are 9.65 and 14.11 kN. The 8×M24 drawing alone provides no evidence of anchorage or ground-bearing capacity.
- For the suggested 1.5×1.5×0.8 m footing, peak soil pressures under the combined case are 113.4 and 214.7 kPa. The R3.5 m peak occurs at approximately 24°.
- Thirty-four numerical verification checks were completed. Actual materials, masses, reinforcement, ground conditions and physical testing do not yet constitute equipment capacity certification.
Study limitations
- 500 kg is the rated working load. A full-load payload mass of 500 kg is a research input; fixture mass and equipment selfweight are accounted for separately.
- R2.5 m is the existing radius to the end-joint rotation centre. R3.5 m is only an extension hypothesis; an additional offset defines the actual payload centre-of-gravity radius.
- The main example assumes an equipment mass of 900 kg, specified centres of gravity and equivalent dynamic inputs. These are not actual weighing or test results.
- 8×M24, the 720×720 layout and the 600 mm embedded length are drawing geometry. The suggested footing and C25 note are not capacity verification.
- The model is quasi-static and uses small deformations, a rigid baseplate/footing and no buoyancy. Resistance assessment and physical testing remain incomplete; the results do not authorize construction or equipment release.
Research questions and scope
This study examines a fixed-column manipulator with a rated working load of 500 kg, tracing loads from the payload centre of gravity through the fixture, arm and slewing column to the anchor bolts, concrete footing and supporting ground. The existing project radius R2.5 m and the extension-study radius R3.5 m are modelled separately. The question extends beyond whether one M24 bolt can sustain tension: it concerns the interaction between load definitions, baseplate contact, anchor-group effects and eccentric ground pressure.
The existing project documents define working radius as the maximum horizontal distance from the column rotation centre to the end-joint rotation centre. The payload centre of gravity generally does not coincide with the end-joint centre, so 500×g×R is only one gravity-moment term. The fixture, arm and counterweight each have their own mass and lever arm. The pneumatic balancing cylinder generates internal balancing forces but cannot eliminate the resultant external moment applied by the complete machine to its mounting surface. Footing selfweight is added only when evaluating the footing underside; it is not included in the axial compression at the column baseplate.
The geometric baseline is the V3 approval drawing dated 25 October 2026. It shows a horizontal air-expanding shaft without a turnover mechanism and explicitly specifies 8 sets of M24×700 L-shaped cast-in anchors. The turnover mechanism and expansion anchorage in earlier proposals are excluded from the current configuration. The drawing establishes the indicated layout and dimensions; it does not establish that the equipment has been manufactured, that the concrete has reached its required strength or that a load test has passed. [1]
Study limitations: R3.5 m is an extension-study case, not an allowable radius for the existing equipment. This report provides conditional loads, required resistance and dimensional sensitivities; it does not certify the load-bearing adequacy of the equipment, anchorage or footing. Masses, centres of gravity, materials, accelerations, footing reinforcement and ground parameters are treated as explicitly defined research inputs.
The study uses small-deformation, quasi-static equivalent-inertia analysis. It covers static full load, lifting acceleration, combined slewing/braking and outward manual force, and an example of counterweight-dominated reverse bending. It does not simulate collisions, dropped-load impact, cylinder-failure transients, structural resonance, earthquakes, wind loads, corrosion loss or fatigue life. If such actions become engineering design conditions, they require separate combinations consistent with the load path used here.
Inputs and research methods
Inputs are classified as project design parameters, drawing geometry, drawing recommendations, research assumptions and calculated outputs. A separate input register retains absolute source paths, page/item references, units and file hashes; the public text retains only anonymized definitions relevant to the calculations. Constructing a full-load example from the 500 kg rating does not provide a measured weighing record of a 500 kg payload.
| Item | Value | What the evidence establishes | Location |
|---|---|---|---|
| Rated working load | 500 kg | Design parameter, not equipment selfweight | Sheet 1, parameter table |
| Existing working radius | 2.5 m | To the end-joint rotation centre | Sheet 1, parameters and working-envelope drawing |
| Extension-study radius | 3.5 m | Research assumption | Commissioned scope of this study |
| Baseplate outline / mounting holes | 800×800 mm / 8×Φ26 | Drawing geometry; thickness not identified | Sheet 1, hole-layout drawing |
| Anchor layout | 720×720 mm; 360 mm spacing to side midpoints | Four corners and four side midpoints: 8 points | Sheets 1 and 2, plan views |
| Cast-in rod / thread / hook | M24×700 / 200 / 100 mm | Drawing annotations for total length, threaded segment and hook | Sheet 2, detail drawing |
| Embedded / exposed length | 600 / 100 mm | Geometric lengths, not certification of effective anchorage depth | Sheet 2, technical requirement 4 |
| Suggested footing dimensions | 1500×1500×≥800 mm | Suggested values; trial calculation uses 0.8 m thickness | Sheet 2, technical requirement 5 |
| Suggested concrete | At least C25 | Drawing recommendation, not measured site strength | Sheet 2, technical requirement 5 |
Drawing source: [1]. Material grades, baseplate thickness, anchorage resistance and ground-bearing capacity are not inferred from the drawing outline.
| Component | Mass (kg) | Horizontal coordinate x (m) | Height z (m) | Input status and scan range |
|---|---|---|---|---|
| Payload | 500 | R+0.35 | 1.8 | Full-load research value; 0–500 kg |
| Fixture and end assembly | 100 | R+0.15 | 1.8 | 50–150 kg; offset 0–0.30 m |
| Arm and moving components | 350 | 0.50R | 2.5 | 200–500 kg; CG ratio 0.35–0.65 |
| Rear counterweight | 150 | −0.60 | 2.5 | 0–300 kg; rearward distance 0.40–0.80 m |
| Fixed column and base | 300 | 0 | 1.2 | 200–500 kg; centred in this example |
Except for the rated working load, the masses and centres of gravity in this table are research assumptions. Representative equipment mass is 900 kg, and total mass including the payload is 1400 kg. The arm is assumed to extend in a collinear configuration, with the counterweight on the opposite side.
A payload offset of 0.35 m is the representative assumption, scanned over 0–0.65 m. The 0.65 m exploration scale is half the 1300 mm core length; core length alone cannot establish that the actual centre of gravity lies within this range. The shaft-flange location, insertion depth and roll eccentricity still require an assembly model or measurement. The R3.5 m example retains the same masses to isolate the effect of radius. A physically extended arm would generally also change selfweight, stiffness and mechanism geometry, so this comparison is not a ready-to-use modification design.
| Case | Vertical factor: payload and fixture / arm / counterweight | ω / α (rad/s; rad/s²) | Horizontal manual force (N) | Physical interpretation |
|---|---|---|---|---|
| S — static | 1.00 / 1.00 / 1.00 | 0 / 0 | 0 | All components stationary |
| L — lifting | 1.25 / 1.10 / 0.90 | 0 / 0 | 0 | Front assembly accelerates upward; counterweight downward |
| C — combined | 1.25 / 1.10 / 0.90 | 0.35 / 0.25 | 200 | Lifting + co-rotation inertia + radial outward force |
| H — higher dynamic scale | 1.50 / 1.20 / 0.80 | 0.50 / 0.50 | 300 | Separate upper sensitivity level, not a measured limit |
g=9.81 m/s²; manual force acts at a height of 1.2 m. The vertical factor is 1+a_z/g and equals 1 for the fixed column. Downward acceleration of the counterweight reduces its favourable gravity moment.
The lifting and co-rotation inertia model is an instantaneous load surrogate: each component is assigned its own vertical acceleration, while horizontal rotation uses the same ω and α. It does not solve the geometric constraints of the lifting linkage, nor is the case presented as an actual motion trajectory. For simultaneous lifting and slewing, mechanism kinematics must also determine the acceleration of each centre of gravity, including radial-motion and Coriolis terms. The results here apply only to the stated acceleration definitions. The main example calculates inertia about the column using point masses. Additional total inertia about the components' own centres of gravity is separately scanned at 0, 150 and 300 kg·m²; 0 is only the point-mass baseline and does not imply zero inertia of the physical components.
The baseplate is treated as a rigid plane, with tension-only anchors and compression-only bedding. Representative anchor properties are an elastic modulus of 200 GPa, an assumed M24 coarse-thread effective area of 353 mm² and an equivalent elongation length of 0.6 m, giving an axial stiffness of 117.67 MN/m per anchor. The bedding stiffness of 3×10¹⁰ N/m³ is a research surrogate, scanned over 1×10¹⁰–1×10¹¹ N/m³. It is not a soil modulus. The ground-contact calculation determines pressure resultants and moments only; it does not predict settlement using an unknown soil modulus.
The footing is studied as an isolated square block without soil cover or buoyancy. Concrete unit weight is 24 kN/m³, giving a selfweight of 43.20 kN for the 1.5×1.5×0.8 m footing. The values 75, 100, 150 and 200 kPa are only ground-pressure comparison levels, not substitutes for the characteristic bearing capacity in a geotechnical investigation report. Continuous support is assumed beneath the baseplate. The 100 mm exposed anchor length shown on the drawing does not imply a 100 mm gap beneath the baseplate.
| Subject | Verified edition | Assessment level |
|---|---|---|
| Engineering structures | GB 55001-2021 [2] | Reliability, actions and combination principles |
| Ground and foundations | GB 55003-2021; GB 50007-2011 [3,8] | Ground bearing, deformation and stability |
| Steel structures / column bases | GB 55006-2021; GB 50017-2017 [4,6] | Steel, connections, column bases and fatigue interfaces |
| Concrete structure | GB 55008-2021; GB/T 50010-2010 (2024 partial revision) [5,7] | Concrete, reinforcement and local load transfer |
| Post-installed anchorage | JGJ 145-2013 [9] | Anchor-group forces, resistance, detailing and construction |
| Anchor-bolt products | GB/T 799-2020; GB/T 3098.1-2010 [10,11] | Dimensions, products and material properties; not proof of footing capacity |
| International method comparison | BS EN 1992-4:2018 [12] | Concrete-anchorage methods and product-assessment interfaces |
Versions were checked as of 2026-10-25 using competent-authority notices or official standards catalogues. Where a general code conflicts with another standard, the applicable requirements of the general code govern.
Catalogue verification is not equivalent to a completed clause-by-clause code design. The calculations are derived from mechanical equilibrium, elastic strips and compression contact. Unavailable material design values, characteristic anchorage-product values and partial factors are not invented. A complete limit-state design must distinguish permanent and variable actions, address favourable and unfavourable contributions separately, and apply the relevant resistance and combination rules under the governing engineering codes. Cases S, L, C and H in this report are research action values.
Mechanical model and derivation
The origin is at the centre of the column baseplate, with z vertically upward. The representative extended configuration lies in the x–z plane, with positive x toward the payload. Component j has mass m_j and position r_j=(x_j,0,z_j). For the specified instantaneous direction of rotation, gravity and d'Alembert inertia forces are combined as the equivalent external loads applied by the machine to its support.
F_j is in N; x_j and z_j are in m; ω is in rad/s and α in rad/s². The counterweight has negative x_j, so its horizontal inertia acts in the opposite direction to that of the forward masses.
H=(H,0,0), r_H=(0,0,1.2 m); M is in N·m. N=−F_z, V=√(F_x²+F_y²), overturning moment M_o=√(M_x²+M_y²), and torque T_z=M_z.
This is the main overturning component for the representative collinear configuration. M_x=αΣm_jz_jx_j, and the point-mass expression is M_z=−αΣm_jx_j². If the total inertia J₀ about the components' own centres of gravity is included, an additional −αJ₀ enters the torque. These scalar expansions are used for independent recalculation.
At the isolated baseplate interface, it is not consistent to assume equal tension in all eight bolts, compression over the entire concrete contact area and moment distribution through a single fixed lever arm simultaneously. Upward baseplate displacement is positive and is represented by the plane w(x,y)=w₀+βₓx+βᵧy. Each bolt responds only to positive elongation at its location; the bedding responds only to negative displacement.
w is in m; β is a dimensionless small-rotation approximation; k_b is in N/m, k_c in N/m³, and q_b in Pa. The main model assumes no initial bolt pretension, no clearance-related free travel and no local prying.
The three rows represent vertical force and the two generalized overturning moments. For the azimuth sweep, the last two terms on the right are replaced by (M_o cosθ,M_o sinθ). Here θ denotes the uplift direction, not the direction of the M vector.
The solver partitions the positive and negative contact domains and uses Newton iteration. The rectangular underside is clipped along w=0 to form a convex polygon, then triangulated for exact integration of area and first and second moments. This avoids spurious directional peaks caused by coarse grids in small corner-contact regions. Independent discrete bedding models with 40, 80, 160 and 320 cells per edge provide cross-checks. This is a contact solver for mechanical research, not code-checking software.
This elastic distribution assumes equal shear stiffness, simultaneous shear transfer at all 8 holes, a symmetric layout and shear applied at the anchor-group centre. The shear direction is rotated before adding the torsional contribution; V/8 alone is insufficient.
The nominal diameter difference between a Φ26 hole and an M24 rod is 2 mm. Actual contact, hole-position deviations, pretension and grouting determine which bolts first transfer shear. To illustrate this limitation, translation–torsion stiffness equations are also solved for shear engagement at 8 points, 4 corners and 2 diagonally opposite points, each satisfying force and torque equilibrium. The latter two are research cases of contact participation, not assumptions that the remaining bolts have failed. They do not include baseplate hole-bearing checks. No resistance is credited by default to baseplate friction or an unverified shear key.
λ is a research prying multiplier of 1–1.5; e_s is the unsupported shank shear lever arm of 0–100 mm; d_r is the assumed M24×3 external-thread minor diameter of 20.319 mm. The equivalent stress is a material-yield screening surrogate, not a substitute for thread-notch, fatigue or code-based tension–shear–bending interaction checks.
For the local elastic cantilever strip of the baseplate, a is the lever arm from the bolt to the effective support line, b is the effective width and t is the plate thickness. Units are consistent when N, mm and MPa are used. f_lim is only the selected comparison stress level.
The rigid-baseplate assumption distributes the overall forces; the strip model checks whether local flexibility could invalidate that assumption. If strip stress or deformation is excessive, introducing λ alone cannot establish an adequate design. Anchor forces must be redistributed using a model of the actual stiffeners, welds, washer contact and plate bending. A compression-side strip with overhang a_c permits a similar elastic screening expression, σ=3q_b a_c²/t². Because the actual support lines and stiffener dimensions are unknown, this report does not specify a single final plate thickness.
The first expression gives the required average local load-transfer pressure over the projected hook area. The second gives the required average interface shear stress under a pure-bond load-transfer assumption. These are demand indicators for different mechanisms and must not be added to obtain total cast-in-anchor resistance. Comparing p_hook directly with concrete cube compressive strength also cannot establish a pass.
For post-installed anchors, steel, pull-out, cone-breakout, splitting and shear parameters in the product assessment control different failure modes. [9,13] International methods scale single-anchor cone resistance with √f_ck·h_eff^(3/2); the coefficient depends on anchor type, crack condition and product assessment. f_ck is cylinder strength, so the numerical value of the Chinese C25 designation on the drawing cannot be inserted directly into this expression. [12,14] This study back-calculates only the required combined coefficient. Coefficients for headed or expansion anchors cannot be borrowed to certify an L-shaped hook.
Unit convention: force in N, f_ck in N/mm², h_eff in mm, and projected area in mm². K_eff is an unknown coefficient incorporating other reductions and resistance partial factors. The expression back-calculates a required value; it does not provide available resistance.
A_union is the union of square projections of side 3h for the tensioned anchors, clipped to the 1.5 m footing boundary. This projection illustrates group overlap and edge-distance effects; it is not a complete EN or JGJ cone-breakout check. Actual effective embedment, edge corrections, eccentricity, reinforcement and product applicability still require separate treatment. In particular, the 600 mm embedded length shown on the drawing cannot automatically serve as h_eff in any anchorage model.
The six load components at the baseplate are transferred to the footing underside, with footing selfweight added. B_f and H_f are in m, and γ_c is in N/m³. The resultant overturning moment at the underside is M_f=√(M_x,f²+M_y,f²).
The square-footing contact surrogate assumes a rigid underside, a linear compression reaction and no soil tension. e_x and e_y are the eccentricities of the pressure resultant. Integration is performed over the clipped polygon. The model does not calculate settlement modulus, plastic soil resistance or dynamic impedance.
The left expression is the biaxial kern condition for full contact under a square footing. The right expression gives the square side length required to prevent separation at every slewing azimuth. It is not a ground-bearing acceptance criterion, nor a mandatory requirement for zero separation.
This triangular-pressure solution for partial contact under uniaxial eccentricity provides an independent check. If the resultant falls outside the square support boundary, the no-tension-soil model has no static equilibrium solution. Negative soil pressures must not be reported to conceal overturning.
Examples and calculated results
Using the nominal radii alone, the payload's static gravity moments are 12.263 and 17.168 kN·m at R2.5 m and R3.5 m. Including the representative payload offset, fixture, arm and counterweight increases the complete static moments to 19.988 and 27.591 kN·m. This difference shows that omissions in the load path affect the conclusion before any arithmetic distribution among bolts.
| Case | Axial compression (kN) | Horizontal shear (kN) | Resultant overturning moment (kN·m) | Torque magnitude (kN·m) |
|---|---|---|---|---|
| R2.5 S | 13.734 | 0.000 | 19.988 | 0.000 |
| R2.5 L | 15.402 | 0.000 | 24.650 | 0.000 |
| R2.5 C | 15.402 | 0.679 | 25.388 | 1.341 |
| R2.5 H | 17.069 | 1.301 | 30.712 | 2.682 |
| R3.5 S | 13.734 | 0.000 | 27.591 | 0.000 |
| R3.5 L | 15.402 | 0.000 | 33.896 | 0.000 |
| R3.5 C | 15.402 | 0.889 | 34.827 | 2.467 |
| R3.5 H | 17.069 | 1.727 | 42.006 | 4.935 |
Research action values without code action partial factors; N excludes concrete footing selfweight. C and H are not measured motion records.
The vertical axial force in case C is 15.402 kN at both radii. At R2.5 m, Mx=0.978 and My=25.369 kN·m; at R3.5 m, Mx=1.357 and My=34.801 kN·m. Resultant overturning moments are 25.388 and 34.827 kN·m, an increase of 37.2% with the larger radius. Torque magnitude rises from 1.341 to 2.467 kN·m, an increase of 83.98%, because rotational inertia torque includes mass multiplied by radius squared.
| Case | Peak individual tension (kN) | Total tension (kN) | Required tensile stress (MPa) | Strip threshold thickness (mm), λ=1 | Strip threshold thickness (mm), λ=1.5 |
|---|---|---|---|---|---|
| R2.5 | 9.647 | 28.200 | 27.33 | 16.60 | 20.33 |
| R3.5 | 14.113 | 41.676 | 39.98 | 20.08 | 24.59 |
Strip comparison conditions: a=100 mm, b=150 mm and f_lim=140 MPa. These threshold thicknesses exclude the actual stiffeners, plate yield lines, welds and hole bearing; they are not final plate selections.
| Bolt no. | Coordinates (m) | R2.5 tension (kN) | R3.5 tension (kN) | R3.5 shear at the same azimuth (kN) |
|---|---|---|---|---|
| 1 | (-0.36, -0.36) | 0.000 | 0.000 | 0.896 |
| 2 | (0.00, -0.36) | 0.000 | 0.000 | 0.682 |
| 3 | (0.36, -0.36) | 2.968 | 4.483 | 0.883 |
| 4 | (0.36, 0.00) | 6.308 | 9.298 | 0.572 |
| 5 | (0.36, 0.36) | 9.647 | 14.113 | 0.726 |
| 6 | (0.00, 0.36) | 6.308 | 9.298 | 0.461 |
| 7 | (-0.36, 0.36) | 2.968 | 4.483 | 0.741 |
| 8 | (-0.36, 0.00) | 0.000 | 0.000 | 0.591 |
Shear includes torque and satisfies equilibrium. Zero tension in the table does not imply an inability to transfer shear. Numbering follows Figure 1. Peak tension occurs at corner bolt 5; total tension cannot be distributed by dividing it by 8.
Peak baseplate bedding pressures in the R2.5 m and R3.5 m combined cases are 1.135 and 1.585 MPa, respectively. Only 18.0% and 16.9% of the baseplate area carry compression; pressure is zero elsewhere. Total bedding reaction equals axial compression plus the total tension in the tensioned anchors, explaining why anchor tension and local bearing pressure increase together.
| Radius (m) | Engaged points | Engaged bolt numbers | Peak individual shear (kN) |
|---|---|---|---|
| 2.5 | 8 | 1 2 3 4 5 6 7 8 | 0.524 |
| 2.5 | 4 | 1 3 5 7 | 0.828 |
| 2.5 | 2 | 1 5 | 1.657 |
| 3.5 | 8 | 1 2 3 4 5 6 7 8 | 0.919 |
| 3.5 | 4 | 1 3 5 7 | 1.434 |
| 3.5 | 2 | 1 5 | 2.868 |
Shear direction is swept over 0–360°. Each case satisfies shear-force and torque equilibrium. Reducing the number of engaged points only illustrates uncertainty in clearance-dependent load transfer; the actual condition requires a contact and hole-bearing model.
Assuming an M24×3 effective area of 353 mm², the pure tensile-stress demands in case C are 27.33 and 39.98 MPa. Against hypothetical first-yield levels of 235 or 355 MPa, the steel stresses may appear low, but this does not establish anchorage, baseplate or ground safety, nor that the actual rods possess those yield strengths. The drawing specifies only M24, without identifying a property class or material grade. With a 100 mm unsupported shear lever arm, λ=1 and 8-point shear engagement at the same study azimuth, the stress surrogate increases to 73.74 and 128.19 MPa. The 100 mm exposed length on the drawing is not treated as evidence of this unsupported condition.
Back-calculation over a 24×100 mm projected L-hook area gives required average local load-transfer pressures of 4.020 and 5.881 MPa in case C. If the effective hook length is only 50 mm, these demands double to 8.040 and 11.761 MPa. This is only a local load-transfer scale: hook deformation, concrete splitting, side-face blowout, cone breakout and interaction with adjacent anchors must also be addressed. A pressure below the C25 number is not a valid pass criterion.
| Case | Study depth (mm) | Average bond demand (MPa) | Union / sum of isolated projections | Required K_eff |
|---|---|---|---|---|
| R2.5 | 200 | 0.640 | 68.0% | 0.656 |
| R2.5 | 400 | 0.320 | 27.6% | 0.570 |
| R2.5 | 600 | 0.213 | 13.6% | 0.630 |
| R3.5 | 200 | 0.936 | 68.0% | 0.969 |
| R3.5 | 400 | 0.468 | 27.6% | 0.843 |
| R3.5 | 600 | 0.312 | 13.6% | 0.931 |
λ=1. K_eff is back-calculated only from a scaling relation assuming a cylinder strength of 20 MPa; no available product K_eff is supplied. Depths of 200, 400 and 600 mm are not an approved range for any actual post-installed anchor product.
At a 45° uplift direction in case C, 5 anchors are in tension. The minimum edge distance from the footing boundary to an outer anchor centre is 390 mm. With a projection-depth scale of 600 mm, 3h=1800 mm exceeds the footing width, so the tensioned-anchor projections overlap extensively and are clipped by the boundary. Their union is only 13.6% of the sum of the 5 isolated projected areas. This geometry is sufficient to reject deductions such as multiplying single-anchor resistance by 8 while ignoring group and edge effects, but the area ratio alone cannot determine actual L-anchor resistance.
| Case | Resultant underside moment (kN·m) | Eccentricity (m) | Peak pressure (kPa) | Peak azimuth (°) | Contact fraction at that azimuth | Side length for no separation at any azimuth (m) |
|---|---|---|---|---|---|---|
| R2.5 S | 19.988 | 0.351 | 83.0 | 45 | 80.9% | 1.952 |
| R2.5 L | 24.650 | 0.421 | 106.5 | 45 | 69.5% | 2.096 |
| R2.5 C | 25.766 | 0.440 | 113.4 | 45 | 66.2% | 2.131 |
| R2.5 H | 31.420 | 0.521 | 155.4 | 45 | 51.7% | 2.280 |
| R3.5 S | 27.591 | 0.485 | 128.6 | 45 | 58.3% | 2.198 |
| R3.5 L | 33.896 | 0.578 | 190.5 | 30 | 39.7% | 2.357 |
| R3.5 C | 35.289 | 0.602 | 214.7 | 24 | 34.0% | 2.391 |
| R3.5 H | 42.893 | 0.712 | 738.2 | 5 | 8.1% | 2.555 |
Footing: 1.5×1.5×0.8 m; selfweight: 43.20 kN. Pressure directions are from a 1° sweep. The last column addresses only the full-contact geometry condition and is not a recommended construction dimension.
Total compression at the footing underside is 58.602 kN for both radii in case C; the resultant underside moments are 25.766 and 35.289 kN·m. Peak ground pressure is 113.4 kPa with approximately 66.2% contact at R2.5 m, and 214.7 kPa with approximately 34.0% contact at R3.5 m. Increasing the radius raises peak pressure by about 89.3%, substantially more than the increase in overturning moment, because partial contact reduces the compression area. The most adverse R3.5 m pressure direction is approximately 24°; checking only 0° or 45° would miss the higher peak.
Using the same model and full contact at every azimuth as the research objective, case C gives square-footing side-length thresholds of 2.131 and 2.391 m, still at a thickness of 0.8 m. These values satisfy only the eccentricity kern condition; soil strength, settlement, reinforcement and construction details have not been addressed. Conversely, partial separation of the 1.5 m footing does not automatically mean structural failure. Its acceptability depends on verified ground deformation, cyclic actions and structural design requirements.
Unidirectional strips are established along the 800 mm baseplate boundary. Integration of the complete pressure field gives upper-bound gross upward-load bending demands in the footing of 3.54 and 6.60 kN·m/m. This indicator does not deduct strip selfweight or include local anchor uplift, splitting restraint or minimum reinforcement. It supplies only a reproducible bending scale for the concrete footing's structural model. Reinforcement cannot be inferred solely from this small moment, and the suggested footing must not be treated as a completed plain-concrete design.
Under the dry, no-buoyancy assumptions of case C, the friction coefficients required against overall sliding at the footing underside, V/W, are only 0.0116 and 0.0152. If 0.3–0.5 is separately adopted as a research friction input, translational sliding is less sensitive than eccentric pressure. This does not cover slip between the baseplate and grout, torsional friction, shear transfer at construction joints or wet conditions. A small V/W at the footing underside does not justify setting anchor shear to zero.
Parameter sensitivity and engineering discussion
One-at-a-time scans hold the remaining representative inputs fixed while varying payload and fixture masses, arm mass/centre of gravity, counterweight, payload offset, lifting factor, angular velocity and angular acceleration. The ranges are selected for exploration; they are neither probability distributions nor manufacturing tolerances. Bar lengths in the figure must not be interpreted as statistical confidence intervals. Additional angular-velocity and angular-acceleration studies must also examine torque: a small change in overturning moment with angular acceleration does not imply low braking demand.
Taking both endpoints for fixture mass, arm mass, counterweight mass, payload offset, arm centre-of-gravity ratio, counterweight lever arm and lifting factor produces 128 parameter corners per radius, or 256 combinations in total. Angular velocity is fixed at 0.5 rad/s, angular acceleration at 0.5 rad/s² and manual force at 300 N. Across the selected rectangular parameter-domain corners, overturning moment ranges from 13.91–40.44 kN·m at R2.5 m and 20.31–54.36 kN·m at R3.5 m. These are results for the specified parameter corners, not certified minimum/maximum loads of the actual machine or probability intervals accounting for all correlated parameters.
Increasing counterweight benefits some full-load configurations but increases axial force, rotational inertia and the risk of reverse overturning when unloaded. A separate folded-configuration example uses an end radius of 0.35 m, payload of 0 kg, fixture of 100 kg, arm of 350 kg and counterweight of 300 kg at a rearward distance of 0.8 m, giving static My=−1.263 kN·m. This example demonstrates only that the moment can reverse. Since actual folded-mechanism geometry has not been modelled, 0.35 m is not presented as a verified reachable radius.
Bedding stiffness and anchor elongation length both affect load sharing. Across 9 combinations of k_c=10¹⁰–10¹¹ N/m³ and L_eff=0.3–0.9 m in case C, peak individual anchor tension is approximately 7.95–13.81 kN at R2.5 m and 11.72–19.63 kN at R3.5 m. The stiffness study uses a 3° azimuth increment; these values are only its discrete sweep envelope. At high bedding stiffness, the peak direction may also move away from 45°. The main-example values of 9.65 and 14.11 kN are therefore not unique answers independent of structural detail.
Adding total centre-of-gravity rotational inertia of 300 kg·m² increases the column-base torque magnitude in case C by 0.075 kN·m at each radius, while N, V and resultant overturning moment remain unchanged. The additional-inertia data and 8-point shear demands are archived separately. The point-mass torque in the main example cannot therefore be treated as an upper envelope for the unknown physical equipment.
Equivalent anchor elongation length determines spring stiffness and is not the effective embedment depth for cone breakout; the two are recorded separately. A 600 mm embedded segment of the cast-in rod does not directly establish 600 mm of uniformly effective bond length. Post-installed anchorage comparisons must remain within the embedment, substrate-thickness and crack conditions specified in the relevant product assessment.
| Type | Primary load-transfer mechanism | Governing parameters and requirements | Engineering applicability |
|---|---|---|---|
| L-shaped cast-in rod | Actual transfer through the concrete surrounding the shank and hook | Verify material, bend radius, effective hook length, reinforcement and embedment; check group effects, splitting and side-face blowout | Suitable for new footings where placement can be controlled; the configuration selected on the drawing still requires structural design |
| Cast-in headed or anchor-plate type | Local transfer through a defined bearing head or anchor plate | Head/plate area, welding/forming, concrete cone breakout and reinforcement load paths | Different transfer mechanism from an L-shaped rod; not interchangeable on diameter alone |
| Mechanical post-installed anchor | Expansion friction or undercut mechanical interlock | Applicable crack condition, edge distance, spacing, slab thickness, drilling, installation torque and product assessment | May suit alterations to existing concrete; ordinary expansion screws are not equivalent to qualified heavy-load structural anchors |
| Bonded post-installed anchor | Adhesive and interface transfer along the embedded segment | Product-approved embedment, hole cleaning, moisture, temperature, curing, sustained load/creep and group effects | Applicable only under the corresponding assessed conditions; average bond demand is not available product resistance |
See [6–12] for the scope of the standards; transfer and failure mechanisms were checked against first-party sources [13,14]. No particular post-installed anchor product is selected or recommended.
Cast-in and post-installed anchorage must first be compared under the same N, V, M and torque, then assessed against their respective load-transfer mechanisms and product/detail resistance. A common M24 diameter does not imply equal resistance, and total embedment alone is not a sufficient basis for comparison. Product conformity to GB/T 799 does not establish concrete-footing conformity; the post-installed scope of JGJ 145 does not automatically cover arbitrary custom L-shaped cast-in rods. For rotating machinery, repeated tension/compression, shear reversal, vibration and long-term installation relaxation must also be identified.
| Assessment item | Governing parameters | Representative R2.5 / R3.5 demand | Actual resistance evidence still required |
|---|---|---|---|
| Bolt tension / shear / bending | T_i, V_i, e_s, A_s and material properties | C: tensile-stress demand 27.33/39.98 MPa; stress surrogate at e_s=100 mm: 73.74/128.19 MPa | Actual grade, corrosion and fatigue spectrum unverified |
| Local baseplate bending and prying | a, b, t, stiffeners / washers | a100/b150/f140: t threshold 16.60/20.08 mm; at λ1.5: 20.33/24.59 mm | Actual thickness and support lines must enter the local structural model |
| Local L-anchor pull-out and hook | d, effective hook length and concrete confinement | 100 mm effective length: average pressure demand 4.020/5.881 MPa | Resistance models for local bearing, hook deformation and splitting |
| Anchor group / concrete cone | Total tension, h_eff, edge distance, spacing, cracks and reinforcement | C: anchor-group tensile demand 28.20/41.68 kN (λ=1) | 8×M24 geometry is not resistance; formal design or corresponding assessment is required |
| Concrete shear-edge breakout / pry-out | V_i, torque, front-row edge distance and embedment | Use the tabulated individual shear distribution and check the complete shear-transfer path | Rod shear stress alone is insufficient |
| Ground bearing / separation | Footing selfweight, M_f, soil parameters and azimuth | C: peak pressure 113.4/214.7 kPa; contact 66.2%/34.0% | Bearing capacity, settlement and cyclic tilt require geotechnical data and deformation models |
| Footing structure and interfaces | Reinforcement, cover, local uplift, bending and construction joints | Gross strip moment 3.54/6.60 kN·m/m; see the table for total group uplift | Minimum reinforcement, splitting and anchorage detailing cannot be omitted |
The critical demands in the table are tied to case C and the model assumptions stated in each row. They are not allowable values for direct manufacture or construction. Increasing λ requires consistent updates to both bolt and concrete demands.
The governing failure mode determines the most effective engineering improvement. If local baseplate flexibility governs, shortening the distance from the bolt to the effective support line, arranging stiffeners appropriately and improving continuous support may address the issue more directly than increasing rod strength alone. If eccentric ground pressure governs, the overall support conditions change through a larger footing plan, altered thickness/selfweight or a designed connection to the main structural foundation. Adding bolts alone does not increase ground-bearing area or provide footing reinforcement. Any change in detailing requires a renewed, complete assessment of loads and resistance.
Conclusions and verification methods
- The complete load path is the primary condition governing this study. Under the representative mass and centre-of-gravity assumptions, static overturning moments are 19.99 and 27.59 kN·m at R2.5 m and R3.5 m; the combined-case values are 25.39 and 34.83 kN·m. Nominal working radius cannot replace the payload centre-of-gravity radius.
- The 8×M24 layout establishes geometry only. The rigid-baseplate and unilateral-contact model gives individual anchor tensions of 9.65 and 14.11 kN and total tensile resultants of 28.20 and 41.68 kN in representative case C. Shear also depends on torque and the number of engaged contact points; simply averaging moment or shear cannot establish code compliance.
- Baseplate bending and concrete anchorage require separate assessment. Strip, hook-pressure and interface-transfer indicators are conditional demands. Material grades, reinforcement, cracks and effective embedment remain unverified, so no actual capacity margin or safety factor is reported.
- The suggested 1.5×1.5×0.8 m footing produces peak soil pressures of 113.4 and 214.7 kPa and contact fractions of 66.2% and 34.0% in representative case C. The most adverse R3.5 m pressure direction is approximately 24°. Side-length thresholds of 2.131 and 2.391 m for no separation at any azimuth are geometric results, not completed footing designs.
- The scripts perform load sweeps, contact solutions and independent recalculations over an explicit parameter domain. They can support recalculation once mass, material and geotechnical data are added. They do not authorize extending the existing equipment to R3.5 m or replace engineering review of the actual structure.
| Verification item | Method actually used | Result |
|---|---|---|
| Independent load recalculation | Term-by-term comparison of scalar mass moments and inertia moments with vector cross products at both radii | Passed; absolute error <10⁻⁸ N or N·m |
| Independent anchor solution | At 0°, root-finding with a single neutral-axis equation and a hand-calculation form for triangular compression | Passed; individual-anchor error <10⁻⁶ N |
| Discrete contact cross-check | 40/80/160/320 grids compared with exact polygon integration | Passed; relative peak-tension difference at 320 grid <10⁻⁴ |
| Uniaxial ground-pressure analytical solution | Independent check using the eccentric triangular-pressure formula | Passed; relative difference <10⁻⁷ |
| Biaxial ground-pressure integration | Independent 400×400 pressure-grid integration of reactions and moments | Passed; relative equilibrium discrepancy <5×10⁻⁵ |
| Azimuth-sweep accuracy | Continuous bounded search cross-check of the case C peak from the 1° sweep | Passed; relative peak-pressure difference <0.1% |
| Limits and symmetry | Zero moment, 90° rotation, rejection of an out-of-bound resultant, and shear/torque equilibrium | Passed |
| Physical capacity and engineering checks | Materials, anchorage pull-out, reinforcement, settlement and fatigue | Not performed; no verified conclusion claimed |
The verification record contains 34 numerical checks. A pass here establishes consistency of the corresponding calculation implementation only; it does not establish a physical-equipment pass.
To progress from a parametric study to an engineering capacity assessment, first obtain the masses and centres of gravity of the payload, fixture, arm, counterweight and fixed components using the same component boundaries, and measure operating and braking accelerations. Next, establish the baseplate, stiffener, weld, rod-material and anchorage details, using actual concrete strength, reinforcement and site geotechnical data to build resistance and deformation models. Finally, perform instrumented validation under a reviewed loading programme. That programme should include full load at maximum extension, reverse loading in the unloaded configuration, principal slewing azimuths and foreseeable dynamic cases, while monitoring rod strain, baseplate opening, column-top displacement and footing settlement/rotation.
Anchorage-test objectives, loading methods, sampling and criteria should be selected for the specific cast-in or post-installed system, distinguishing field non-destructive testing, system qualification and ultimate destructive testing. Test locations, reinforcement boundaries and loading equipment should avoid altering the actual concrete load path. These tests have not been performed; this report therefore does not claim verified pull-out, load-holding, fatigue or ground-bearing performance.
Reproducibility in public research comes from explicit inputs, equations, data and verification records, not from recasting unknowns as confirmed conclusions. The retained parameter ranges permit further analysis, but the available evidence is insufficient for a final finding of load-bearing adequacy for the actual equipment's anchorage and footing.
References
- Project technical documentation. Approval drawing for a 500 kg air-expanding-shaft pneumatic manipulator, V3, 2026-10-25, sheets 1 and 2; related earlier proposals used to cross-check definitions.
- Ministry of Housing and Urban-Rural Development. GB 55001-2021, General Code for Engineering Structures. Announcement No. 70 of 2021; effective 2022-01-01. Official source
- Ministry of Housing and Urban-Rural Development. GB 55003-2021, General Code for Foundation Engineering of Buildings and Municipal Projects. Announcement No. 62 of 2021; effective 2022-01-01. Official source
- Ministry of Housing and Urban-Rural Development. GB 55006-2021, General Code for Steel Structures. Announcement No. 69 of 2021; effective 2022-01-01. Official source
- Ministry of Housing and Urban-Rural Development. GB 55008-2021, General Code for Concrete Structures. Announcement No. 167 of 2021; effective 2022-04-01. Official source
- Ministry of Housing and Urban-Rural Development. GB 50017-2017, Standard for Design of Steel Structures. Effective 2018-07-01. Official source
- Ministry of Housing and Urban-Rural Development. GB/T 50010-2010, Standard for Design of Concrete Structures (2024 partial revision). Announcement No. 62 of 2024; revision effective 2024-08-01. Official source
- Ministry of Housing and Urban-Rural Development. GB 50007-2011, Code for Design of Building Foundations. Effective 2012-08-01. Official source
- Ministry of Housing and Urban-Rural Development. JGJ 145-2013, Technical Specification for Post-installed Fastenings in Concrete Structures. Effective 2013-12-01. Official source
- State Administration for Market Regulation and Standardization Administration of China. GB/T 799-2020, Foundation Bolts. Effective 2021-06-01. Official source
- General Administration of Quality Supervision, Inspection and Quarantine and Standardization Administration of China. GB/T 3098.1-2010, Mechanical Properties of Fasteners — Bolts, Screws and Studs. Effective 2011-10-01. Official source
- British Standards Institution. BS EN 1992-4:2018, Eurocode 2: Design of concrete structures — Design of fastenings for use in concrete. Published 2018-10-19. Official source
- Das, A. How post-installed anchors work under different loading conditions. Hilti Engineering Centre. Official source
- Narayan, S. Hilti HST4: Performance that matches cast-in headed fasteners. Hilti Engineering Center. Official source
Calculation reproduction and data notes
Calculations use SI units throughout; thread-section and local strip formulae use N–mm–MPa after explicit conversion. Figures read directly from calculated outputs and redraw mathematical models without customer identifiers. Original proposals and drawings are read-only; input hashes and version selections are retained in the research package's evidence records.
- Run make_inputs.py to generate the research input record. If reviewed new inputs are available, retain the previous version before updating them.
- Run analyze.py to recalculate the 8 main cases, azimuth sweeps, one-at-a-time scans, 256 load-parameter corners, baseplate/anchorage/ground sensitivities and shear-engagement cases.
- Run validate.py for independent scalar, neutral-axis, contact-integration and limiting-case checks, and to generate footing-strip demands.
- Run plot_figures.py to generate 8 figures in PNG and SVG formats; run make_report.py to insert numerical results into the full text and web summary.
- Check validation.json and file hashes, then generate Word/PDF files through the unified layout workflow. The research package itself does not contain a signed engineering design review.
| Dataset | Contents and units |
|---|---|
| cases | Main-case N/V in N; M/Mz in N·m; pressure in Pa; thickness in mm |
| load_path | Component masses in kg, centres of gravity in m, three force components in N and three moment components in N·m |
| bolts / shear_engagement | Individual anchor tension/shear in N; shear envelopes for engaged-point groups |
| azimuth / footing | Direction and footing-side-length sweeps; pressure in Pa and dimensionless contact fraction |
| sensitivity / parameter_corners | One-at-a-time and parameter-corner inputs; not probability sampling |
| plate / standoff / stiffness | Local-strip, anchor-shank bending and equivalent-stiffness sensitivities |
| concrete | Required average load-transfer indicators and projected-area union; not L-anchor resistance |
| foundation_face | Gross upward-pressure bending indicators for footing strips and conditional section back-calculations |
See BUILD.md in the research package for detailed filenames, environment dependencies and commands.
Standards-version verification and formula-source verification are recorded separately. Chinese standard identifiers and scope are checked through competent-authority notices or official catalogues. Where a verifiable full text of a resistance provision was unavailable, online paraphrases were not used as official provision coefficients. The cone-breakout scaling relation was checked against first-party manufacturer technical material and used only to back-calculate demand, not to select a product.