FAQ · Manipulator selection
Selection FAQ for Pneumatic Industrial Manipulators
Load selection, mounting arrangements and tooling configuration, and how vacuum gripping, turning and hot-workpiece handling are used. Find a question close to your workpiece and workstation, or submit your application for an engineer to answer.
- Common questions
- 22
- Product selection
- 5 questions
- Custom tooling
- 5 questions
- Mounting arrangements
- 4 questions
- Applications
- 4 questions
- Project enquiries
- 4 questions
Product selection
5 questions
Q01What tasks are pneumatic industrial manipulators suited to?
Pneumatic industrial manipulators assist with supporting workpiece weight while the operator guides the handling path, reducing the burden of repetitive transfer, prolonged manual support and orientation changes. Common uses include machine loading and unloading, assembly alignment, turning and workstation transfer. Dedicated tooling can handle automotive parts, packaged boxes, motor stators and hot castings.
Q02How do pneumatic industrial manipulators differ from conventional lifting equipment?
Conventional lifting equipment mainly transfers, raises and lowers suspended loads. A pneumatic industrial manipulator combines assistance from the main unit with end tooling, allowing the operator to guide movement and alignment. Rotation, turning or braking mechanisms are optional, making it suitable for frequent handling where an operator participates in orientation control.
Q03What parameters are needed to select a pneumatic industrial manipulator?
Selection information includes workpiece weight, dimensions, center of gravity, material and contact areas, along with pick-and-place positions, lifting height, working radius, turning motions and handling frequency. Site photographs or video, installation space and air-supply conditions inform the main structure. For hot-workpiece or vacuum-handling applications, also describe the temperature and surface condition.
Q04What workpiece weight can a pneumatic industrial manipulator handle?
Equipment is selected for the combined workpiece and tooling load. Working radius, lift stroke, center of gravity and turning motions also determine the main structure and drive components. Keep loads and motions within the selected equipment's rated capacity and working range, and use the corresponding tooling and load configuration when changing workpieces.
Q05What motions can a pneumatic industrial manipulator perform?
It assists with lifting, horizontal movement and transfer between workstations. End mechanisms can provide clamping, vacuum gripping, rotation, turning or positioning assistance. Establish the clamp or vacuum grip before lifting and transfer. Release the tooling after the workpiece is placed and supported.
Custom tooling
5 questions
Q06Can the manipulator use custom tooling?
Yes. Custom handling tooling is designed around the workpiece shape, weight, contact areas and pick-and-place motions. Options include vacuum cups, mechanical jaws, hooks, pneumatic expanding shafts, internal-expansion tooling, turning tooling and thermally insulated tooling. Adjustable structures, quick-change contact components or dedicated tooling can be selected for multiple workpiece sizes.
Q07What products are suitable for vacuum handling?
Vacuum handling suits cartons, panels, sheet-metal parts, cover panels and similar workpieces with usable gripping areas where the required gripping force can be established. Cup material, area and the vacuum source are selected for surface flatness, permeability and structural strength. Gripping tests on samples can inform configuration for rough or porous surfaces.
Q08Can manipulator tooling be made for irregular workpieces?
Custom approaches include profile-matched jaws, lifting supports, locating structures and multipoint gripping, establishing contact at areas that can carry the load. The tooling arrangement accounts for the center of gravity and target orientation. Contact materials and the release method can be selected for the workpiece structure.
Q09Can pneumatic industrial manipulators handle hot workpieces?
You can select a hot-workpiece handling system with thermally insulated tooling or heat-resistant contact structures for iron castings, die-cast parts and similar workpieces. Contact materials, insulation and pneumatic-circuit protection are selected for temperature, contact duration and workpiece weight. The operator guides handling using a handle while maintaining operating distance.
Q10Can the tooling provide 90° turning?
A 90° turning mechanism can be configured to change the orientation of panels, headliners, coils, boxes and similar workpieces. The turning tooling is arranged for the center of gravity and gripping areas. Lift the workpiece and move it to a position with sufficient turning space, then maintain the clamp or vacuum grip during the orientation change.
Mounting arrangements
4 questions
Q11What mounting arrangements are available?
Column, mobile-base, overhead, rail and frame mounting are available. Column mounting covers a fixed workstation. Overhead mounting uses an upper load-bearing structure to reduce floor occupancy. Rail and frame arrangements extend the handling range. Mobile equipment changes operating positions while unloaded and operates after the base is positioned.
Q12What applications suit overhead-mounted pneumatic industrial manipulators?
Overhead-mounted pneumatic industrial manipulators suit fixed workstations with suitable overhead load-bearing conditions, limited floor space or dense equipment. They can cover automotive assembly, areas around welding operations, and loading and unloading stations. An overhead rail structure is optional when the working range needs to be extended.
Q13What applications suit mobile-base pneumatic industrial manipulators?
A mobile-base manipulator suits several workstations sharing the equipment at different times. First place the workpiece down and unload the equipment, then move the base to the next operating position. Operate after positioning and engaging the brake or supports. A manually pushed base or a powered mobile structure can be selected.
Q14What should be considered when installing a pneumatic industrial manipulator?
The installation position must provide suitable load-bearing conditions and space for manipulator motion, operator access and workpiece travel. Column mounting requires a suitable floor foundation; overhead or rail mounting requires an upper load-bearing structure. Route air, power and lines clear of moving components and handling paths.
Applications
4 questions
Q15What manipulator configurations suit automotive parts handling?
Automotive parts handling can use dedicated tooling for each workpiece: seat tooling grips or supports load-bearing areas; headliners can use large-area vacuum tooling and a turning mechanism; sheet-metal parts, battery enclosures and cover panels can use vacuum or custom clamping tooling. The manipulator assists with pick-and-place and fixture alignment before welding or assembly.
Q16What configurations suit motor stator handling?
Motor stator handling can use internal-expansion tooling to engage bore areas that can carry the load, or external clamps or combined tooling. Column or overhead manipulators can serve fixed workstations. A mobile configuration can be shared between several stations at different times, with unloaded repositioning followed by lifting, transfer and placement within the station where the base is positioned.
Q17Can a pneumatic industrial manipulator handle cartons?
Yes. Carton handling can use a vacuum-equipped pneumatic industrial manipulator for repetitive pick-and-place, stacking, destacking and production-line transfer. Cups and the vacuum source are selected for the carton surface, board strength and weight. Lift after a stable vacuum grip is established, and release the vacuum after the carton is placed and supported.
Q18What matters when handling hot iron castings?
Heat-resistant contact components, thermally insulated tooling and pneumatic-circuit protection can be provided. Materials and structures are selected for temperature, contact duration and surface condition. Engage the designated load-bearing areas, guide lifting and transfer using a handle, maintain operating distance from the hot workpiece, and release the tooling after placement.
Project enquiries
4 questions
Q19Can AUREK configure a solution for the site conditions?
Yes. AUREK combines pneumatic industrial manipulators, dedicated tooling and matching mounting structures in its industrial handling systems, with the main arrangement selected for the workpiece load, handling path and workstation layout. Turning, rotation, thermal insulation and changeover mechanisms for multiple sizes can be selected for the production motions.
Q20What information should I prepare before discussing a manipulator solution?
Provide workpiece photographs or drawings, weight, dimensions and permitted contact areas, along with pick-and-place positions, lifting height, turning requirements, handling frequency and photographs of the available space. Air-supply conditions and special environmental requirements inform the equipment and tooling configuration. For hot workpieces, include temperature and contact duration.
Q21Can I enquire with photographs but without detailed parameters?
You can send workpiece photographs, site video and the known weight to discuss equipment arrangements and tooling approaches. Photographs help identify the shape and workstation layout; drawings, weighing records and pick-and-place dimensions inform equipment selection and tooling design. Available information can be provided in stages.
Q22Is a pneumatic industrial manipulator standard equipment or custom-built?
The manipulator is selected for load, working radius and lift stroke, while the tooling, mounting structure and motion mechanisms are matched to the workpiece and workstation. Common manipulator structures can be paired with dedicated tooling. Adjustable or quick-change structures can be selected for multiple sizes, creating an equipment combination suited to the production task.
Selection reference
AUREK combines pneumatic industrial manipulators, dedicated tooling and mounting structures into industrial handling systems for automotive parts, machining, packaging, hot castings, motor stators and other workstations. The manipulator is selected for load capacity, working radius and lift stroke. Tooling matches the workpiece contact areas and pick-and-place orientations, with optional turning, thermal insulation and changeover configurations for multiple sizes.
AApplications
- Heavy-workpiece handling
- Carton vacuum handling
- Automotive seat assembly and transfer
- Automotive headliner turning and assembly
- Motor stator handling
- Thermally insulated transfer of hot iron castings
- Battery enclosure / cover panel handling for welding
- Work roll loading and unloading
BConfiguration options
- Equipment load capacity
- Working radius
- Lift stroke
- Mounting arrangements
- Tooling options
- Handling motions
- Drive type
- Environmental protection options
CCommon tooling types
- Vacuum cup tooling
- Mechanical jaws
- Hook tooling
- Air-expanding shafts
- Internal-expansion tooling
- Turning tooling
- Thermally insulated tooling
- Profile-matched tooling
DInformation for an enquiry
- Workpiece photographs or video
- Workpiece weight
- Workpiece dimensions
- Handling start and end positions
- Lifting height
- Whether turning is required
- Whether the workpiece is hot
- Photographs of the available site space
- Air-supply conditions
- Handling frequency
Get equipment and tooling recommendations
Share the workpiece dimensions, weight, pick-and-place positions and required motions, and an engineer will recommend a matching manipulator and tooling configuration.
