Solutions · Automotive parts

Automotive Parts Handling Solutions

A pneumatic industrial manipulator with dedicated tooling assists with picking, placing, transferring, turning and fixture alignment of automotive seats, sheet-metal parts, battery enclosures and headliners, reducing manual load support and repetitive lifting.

AUREK pneumatic industrial manipulator handling automotive partsAutomotive parts

Solution overview

Automotive handling solutions combine a pneumatic industrial manipulator with workpiece-specific tooling. Contact structures are arranged around the load-bearing areas of seat assemblies, sheet-metal parts, battery enclosures and headliners, connecting racks, processing equipment and assembly fixtures.

The manipulator assists with supporting the workpiece weight while the operator guides lifting, horizontal movement and orientation changes. The tooling is released once the workpiece reaches its target support position, ready for the following welding or assembly process.

Solution configuration

Solution configuration
Typical workpiecesAutomotive seats, sheet-metal parts, battery enclosures, headliners and cover panels
Configuration approachPneumatic industrial manipulator with dedicated tooling; vacuum gripping, turning mechanisms and mounting arrangements selected for the workpiece and workstation
Typical motionsPick-and-place, transfer, fixture alignment, and loading and unloading before and after welding; a turning mechanism enables a 90° orientation change
Design prioritiesLoad-bearing locations, contact-surface protection, orientation control, handling path and clearance around the workstation

Applications

  • Seat assemblies: dedicated tooling engages load-bearing areas to assist with pickup, transfer and alignment at final-assembly workstations.
  • Sheet-metal parts and cover panels: vacuum gripping or custom clamping structures connect rack pickup with fixture loading and unloading.
  • New-energy vehicle battery enclosures: custom tooling assists with transfer before and after welding, placement into fixtures and assembly support.
  • Headliners: large-area vacuum tooling distributes contact loads, with an optional turning mechanism to adjust the assembly orientation.

Tooling and workstation configuration

  • Tooling contact points are arranged around structural load-bearing areas. Protective materials can be selected when appearance-sensitive surfaces require protection.
  • The manipulator's working range and end motions are configured for pick-and-place heights, target orientations and fixture locations, reducing the need to change hand positions during handling.
  • Column or overhead mounting can be selected for fixed workstations. Mobile equipment changes operating positions while unloaded and is operated after the base has been positioned and secured.

Frequently asked questions

Why use custom tooling for automotive parts handling?

Dedicated tooling configures contact and support structures around the workpiece's load-bearing areas, shape and assembly orientation. Profile-matched contact components, protective materials or turning mechanisms can be selected to suit the relevant family of parts.

What matters when handling new-energy vehicle battery enclosures?

The tooling engages the enclosure's load-bearing areas and clears the welding or assembly fixture. Lift the workpiece clear of its original support before aligning it with the target fixture. Release the handling tooling after placement and support of the workpiece.

Can one system serve multiple vehicle models?

Adjustable tooling, quick-change tooling or several dedicated tool sets can be selected for the shapes and load-bearing areas of the chosen models. Use the corresponding tooling configuration during changeover and operate within the equipment's rated capacity and working range.

Submit your requirements, get a technical proposal

Share the workpiece name, weight per workpiece, dimensions and pick-and-place motions, and an engineer will recommend a manipulator arrangement, working range and end tooling. Drawings and site photographs can be sent by email or WeChat.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.