Products · Configured for your application

Industrial handling product range

Four product groups—pneumatic industrial manipulators, custom tooling, vacuum lifters and jib cranes—cover pick-and-place, loading and unloading, transfer and assembly assistance. Equipment structure, load configuration and end tooling are customized for the workpiece and workstation.

Product groups
4
Rated load
Customized for the combined workpiece and tooling weight
Working pressure
0.5–0.8 MPa
Operations
Loading / Transfer / Assembly

Four product groups, configured for the workpiece

The manipulator, tooling and pneumatic circuit are designed together. Products can be combined at one workstation, for example a pneumatic industrial manipulator with vacuum tooling, or a jib crane with lifting equipment.

AUREK ARK series column-mounted pneumatic industrial manipulatorPneumatic Industrial Manipulators
Column-mounted / Mobile / Overhead-mounted

ARK Series Pneumatic Industrial Manipulators

A pneumatic industrial manipulator assists with supporting the workpiece weight and works with suitable tooling for pick-and-place, lifting and transfer. Turning mechanisms and several mounting arrangements are available.

View product
AUREK pneumatic industrial manipulator with custom tooling handling an irregular workpieceCustom tooling
Suction cups / Grippers / Clamps / Hooks

Custom Handling Tooling

End tooling is designed around the workpiece shape, load-bearing areas and handling motions. Vacuum gripping, jaws, internal-expansion gripping, external clamping and turning structures are available.

View product
AUREK pneumatic industrial manipulator with vacuum cups handling cartonsVacuum handling
Cartons / Panels / Sheet metal

Vacuum Lifters and Vacuum Handling

Vacuum tooling picks and places cartons, panels and sheet-metal parts with suitable gripping surfaces. It can be paired with a pneumatic industrial manipulator or lifting equipment for transfer.

View product
AUREK articulating jib crane for workstation liftingJib cranes
Column-mounted / Wall-mounted / Articulating

Articulating Jib Cranes and Workstation Lifting

A jib crane works with a hoist or lifting device to raise, lower and transfer workpieces over short distances within a fixed area. Column-mounted, wall-mounted and articulating structures are available.

View product

Every unit is customized for the application

There is no fixed model table. All parameters below are determined by the workpiece weight, shape, pick-and-place positions and available space. Column, mobile, overhead or rail mounting can be selected.

01Load capacityConfigured for the combined workpiece and tooling load, center of gravity and safety factor
02Working rangeConfigured for pick-and-place distance, slewing range and workstation space
03Lift strokeConfigured for the height difference between pick-and-place points, mounting height and motion path
04End toolingVacuum cups, grippers, internal-expansion tooling, clamps, hooks, pneumatic expanding shafts and turning mechanisms

On-site applications

Every unit is customized for the customer's workpiece and workstation. Open a case to see the workpiece, equipment configuration and handling motions.

Frame workpiece loading onto a mesh-belt furnaceMesh-belt furnace loadingOn-site videoColumn-mounted · Adjustable frame tooling · 150 kg rated loadFrame Workpiece Loading onto a Mesh-Belt FurnaceA column-mounted pneumatic industrial manipulator with adjustable frame-type pneumatic tooling picks stacked frame workpieces one by one from pallets and places them flat on the infeed conveyor of a mesh-belt furnace. One operator guides each part with the handle, reducing manual lifting of large parts.Mobile clamping and handling of a single-cylinder engineEngine handlingOn-site videoMobile-base · Pneumatic clamping · 50 kg rated loadMobile Clamping and Handling of Single-Cylinder EnginesA mobile-base pneumatic industrial manipulator with custom pneumatic clamping tooling grips single-cylinder air-cooled engines at the cylinder block and assists with lifting, transfer, rotation and placement. One operator guides the engine with a handle, reducing manual carrying.On-site large metal workpiece handling and turning applicationMetal workpiece turningOn-site videoMetal workpieces · Clamping and turning · Single-operator guidanceLarge Metal Workpiece Handling and Turning ApplicationA pneumatic industrial manipulator with custom clamping and turning tooling carries the lifting load of large metal workpieces and turns and positions them while maintaining the grip. One operator guides pick-and-place and orientation changes.On-site carton vacuum handling and stacking applicationCarton stackingOn-site videoVacuum gripping · Assisted lifting · Single-operator stackingCarton Vacuum Handling and Stacking ApplicationA pneumatic industrial manipulator with vacuum tooling picks up, lifts, transfers and stacks packaged cartons. One operator guides the carton position using the operating handles, reducing repeated manual carrying and lifting.On-site large panel vacuum handling and turning applicationLarge-panel turningOn-site videoLarge panels · Vacuum gripping · 90° turningLarge Panel Vacuum Handling and Turning ApplicationA pneumatic industrial manipulator with vacuum turning tooling for panels uses multiple suction points to lift, turn through 90° and transfer large panels. One operator guides the change between horizontal and vertical orientations.On-site automotive seat assembly and transfer applicationAutomotive seat handlingMobile-base · Seat tooling · Assembly transferAutomotive Seat Assembly and Transfer ApplicationA mobile-base pneumatic industrial manipulator with dedicated seat tooling assists with gripping, lifting, horizontal transfer and assembly alignment of seat assemblies. It reduces manual carrying and support at seat-assembly and final-assembly transfer stations.On-site motor stator handling and transfer applicationMotor stator handlingOverhead-mounted · Internal-expansion gripping · Assembly loading and unloadingMotor Stator Handling and Transfer Between WorkstationsAn overhead-mounted pneumatic industrial manipulator with internal-expansion tooling picks stators through their bore and assists with lifting, horizontal movement and assembly positioning. It reduces repetitive manual support while leaving floor space available at fixed workstations.On-site thermally insulated transfer of hot iron castingsHot casting handlingApproximately 65 kg · Approximately 250℃ · Insulated transferThermally Insulated Transfer of Hot Iron CastingsAn overhead-mounted pneumatic industrial manipulator with custom thermally insulated tooling grips, lifts and transfers castings weighing approximately 65 kg at approximately 250℃ between workstations, reducing direct manual support of hot workpieces.On-site automotive headliner turning and assembly applicationAutomotive interior handlingColumn-mounted · Multiple suction points · Turning and assemblyAutomotive Headliner Turning and Assembly ApplicationA column-mounted pneumatic industrial manipulator with large-area vacuum tooling supports automotive headliners at multiple suction points for lifting, horizontal movement, turning and assembly alignment, reducing the burden of manually supporting large parts.On-site automotive cover panel and battery enclosure welding handling applicationBattery enclosure handlingColumn-mounted · Custom tooling · Welding loading and unloadingAutomotive Cover Panel and Battery Enclosure Welding Handling ApplicationA column-mounted pneumatic industrial manipulator with custom welding-handling tooling assists with gripping, transferring and positioning automotive cover panels and battery enclosure components, connecting loading and unloading operations around the welding fixture.On-site ring workpiece handling and turning applicationRing turningOn-site videoDedicated ring tooling · Handling and turning · Single-operator guidanceRing Workpiece Handling and Turning ApplicationA pneumatic industrial manipulator with dedicated ring tooling lifts, transfers and turns ring-shaped workpieces while maintaining the grip. One operator guides orientation and position, reducing direct manual support and changes of hand position.On-site work roll handling for grinder loading and unloadingWork roll handlingOverhead-mounted · Adjustable tooling · Grinder loading and unloadingWork Roll Handling for Grinder Loading and UnloadingAn overhead-mounted pneumatic industrial manipulator with adjustable tooling assists with gripping, lifting and loading or unloading work rolls at grinding equipment, reducing floor occupancy. The operator guides the roll toward the fixture and adjusts its placement position.On-site mobile vacuum handling of large packaging boxesLarge-box handlingOn-site videoMobile-base · Vacuum gripping · Large-box transferMobile Vacuum Handling of Large Packaging BoxesA mobile-base pneumatic industrial manipulator with custom vacuum tooling using side and top suction cups assists with pickup, lifting, direction changes and placement of large packaging boxes. The operator guides box transfer, reducing manual carrying and lifting of bulky packages.On-site disc and flange turning, loading and unloading applicationWorkpiece turningOn-site videoDiscs and flanges · Custom clamping · Turning, loading and unloadingDisc and Flange Turning, Loading and Unloading ApplicationA pneumatic industrial manipulator with custom clamping and turning tooling picks disc- and flange-shaped metal workpieces from inside equipment, withdraws, turns and places them, connecting loading and unloading with orientation changes between processes.On-site mobile motor stator handling across multiple workstationsMotor stator handlingMobile-base · Internal-expansion gripping · Shared across workstationsMobile Motor Stator Handling Across Multiple WorkstationsA mobile-base pneumatic industrial manipulator with custom internal-expansion tooling assists with stator gripping, lifting and placement at defined positions. The equipment changes operating locations while unloaded, allowing several assembly stations to share it at different times.On-site carton vacuum handling applicationCarton vacuum handlingMobile-base · Vacuum gripping · Carton transferCarton Vacuum Handling ApplicationA mobile-base pneumatic industrial manipulator with vacuum tooling picks up, lifts, transfers and places cartons, reducing repetitive manual carrying at packaging lines and box-transfer stations. The equipment can be positioned for the operating location.On-site power supply packing and handling applicationPower supply packing and handlingMobile-base · Custom tooling · Packing assistancePower Supply Packing and Handling ApplicationA mobile-base pneumatic industrial manipulator with custom tooling and a dedicated cart assists with gripping, lifting and packaging transfer of power supply products. It reduces repetitive carrying and allows different packaging areas to share the equipment at different times.
View all 17 cases

Submit your requirements, get a technical proposal

Share the workpiece name, weight per workpiece, dimensions and pick-and-place motions, and an engineer will recommend a manipulator arrangement, working range and end tooling. Drawings and site photographs can be sent by email or WeChat.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.