Application cases · Engine handling

Mobile Clamping and Handling of Single-Cylinder Engines

A mobile-base pneumatic industrial manipulator with custom pneumatic clamping tooling grips single-cylinder air-cooled engines at the cylinder block and assists with lifting, transfer, rotation and placement. One operator guides the engine with a handle, reducing manual carrying.

Equipment arrangement
Mobile-base pneumatic industrial manipulator (50 kg rated load)
Tooling
Custom pneumatic clamping tooling
Mobile pneumatic industrial manipulator holding a single-cylinder engine while the operator guides it by the handleEngine handlingWatch on-site video

On-site video

Factory trial footage · Click to play

Clamping and Transferring Engines

A mobile-base pneumatic industrial manipulator with custom pneumatic clamping tooling grips single-cylinder air-cooled engines at the cylinder block and assists with lifting, transfer, rotation and placement. One operator guides the engine with a handle, reducing manual carrying.

  • Workpiece: single-cylinder air-cooled engines
  • Equipment: mobile-base pneumatic industrial manipulator + custom pneumatic clamping tooling
  • Motions: clamping, lifting, transfer, rotation and placement
Open video separately ↗

Application overview

A single-cylinder engine has an irregular outline: the crankshaft output end, flywheel cover and control parts sit around the block, leaving few places to hold it securely by hand. AUREK pairs a mobile-base pneumatic industrial manipulator with custom pneumatic clamping tooling. A cylinder-driven linkage jaw grips the cylinder block, the manipulator carries the engine's weight, and the operator uses a handle to guide lifting, transfer and rotation. The base has casters and support feet: the unloaded unit is pushed to the work position and used once the support feet are lowered. The video was recorded during a trial run in AUREK's workshop.

System configuration

System configuration
WorkpieceSingle-cylinder air-cooled engines
Equipment arrangementMobile-base pneumatic industrial manipulator, 50 kg rated load
ToolingCustom pneumatic clamping tooling (cylinder-driven linkage jaw)
Main motionsAligning, clamping, lifting, transfer, rotation, placement and release
OperationAfter the base is pushed into position and the support feet are lowered, one operator guides handling with a handle
WorkstationsEngine assembly, inspection and transfer between stations

Configuration features

  • A cylinder-driven linkage jaw grips the cylinder block and keeps clear of the crankshaft output end, flywheel cover and control parts, so the engine stays stable during lifting and rotation.
  • The manipulator carries the engine's weight while the operator guides movement and placement with the handle on the tooling, reducing bending, carrying and manual lifting.
  • The base has casters and support feet. It is pushed to a new position while unloaded and fixed by lowering the support feet, so it can work beside an assembly line or be shared between several workstations.

Operating sequence

  1. Push the unloaded equipment to the work position, lower the support feet and confirm the base is stable. Keep the manipulator's working area clear.
  2. Lower the tooling onto the cylinder block, align it and actuate the pneumatic clamp. Confirm the jaw is fully engaged and the grip is secure, then lift slowly.
  3. Use the handle to transfer and rotate the engine toward the target fixture or placement area, avoiding interference with surrounding equipment.
  4. Align with the placement point and lower slowly. Once the engine is stably supported, open the jaw, withdraw the tooling and return to the pick-up position.

Selection and configuration

  • Jaw contact points and clamping stroke can be designed for the engine model, cylinder block shape and permitted gripping areas; protective pads can be added to protect machined surfaces.
  • Rated load and working radius are selected for the engine weight, pick-and-place heights and station spacing. The unit in this application has a 50 kg rated load.
  • Adjustable jaws or quick-change tooling can be selected when several engine models share a line; the base can be mobile, counterweighted or a fixed column.

Frequently asked questions

Where does the tooling grip an irregularly shaped engine?

The gripping position is chosen from the engine's structure. In this application the tooling grips the cylinder block, avoiding the crankshaft output end, flywheel cover and control parts. For other models, the permitted gripping areas are confirmed from drawings or samples before the jaw shape and stroke are designed.

How is the mobile unit moved to another work position?

After placing the engine and opening the jaw, raise the support feet and push the unloaded equipment to the next work position. Lower the support feet again and confirm the base is stable before picking and handling at that position.

Submit your requirements, get a technical proposal

Share the workpiece name, weight per workpiece, dimensions and pick-and-place motions, and an engineer will recommend a manipulator arrangement, working range and end tooling. Drawings and site photographs can be sent by email or WeChat.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.