Application cases · Large-panel turning

Large Panel Vacuum Handling and Turning Application

A pneumatic industrial manipulator with vacuum turning tooling for panels uses multiple suction points to lift, turn through 90° and transfer large panels. One operator guides the change between horizontal and vertical orientations.

Equipment arrangement
Pneumatic industrial manipulator
Tooling
Vacuum turning tooling for panels
Turning angle
90°
On-site large panel vacuum handling and turning applicationLarge-panel turningWatch on-site video

On-site video

On-site footage · Click to play

Turning Panels Through 90°

A pneumatic industrial manipulator with vacuum turning tooling for panels uses multiple suction points to lift, turn through 90° and transfer large panels. One operator guides the change between horizontal and vertical orientations.

  • Workpiece: large panels
  • Equipment: pneumatic industrial manipulator + vacuum turning tooling for panels
  • Motions: vacuum gripping, lifting, 90° turning, transfer and placement
Open video separately ↗

Application overview

Handling and turning large panels requires both distributed support and orientation control. AUREK pairs a pneumatic industrial manipulator with vacuum turning tooling for panels. Multiple suction points across the panel support the workpiece for assisted lifting and 90° turning. The operator guides the panel using operating handles, changing between horizontal and vertical orientations and transferring it to the target position.

System configuration

System configuration
WorkpieceLarge panels
Equipment arrangementPneumatic industrial manipulator
ToolingVacuum turning tooling for panels
Turning angle90°
Main motionsVacuum gripping, lifting, 90° turning, transfer and placement
OperationOne operator guides panel orientation and position using operating handles
WorkstationsChanging panels between horizontal and vertical orientations and transferring them between workstations

Configuration features

  • Multiple suction points are distributed to suit the panel area. The vacuum tooling supports the panel, reducing direct manual lifting at its edges.
  • The turning mechanism assists with a 90° orientation change, connecting horizontal and vertical pick-and-place for transfer between workstations.
  • The manipulator provides lifting assistance while one operator guides panel movement and placement using the handles, reducing handling motions that require several people.

Operating sequence

  1. Guide the vacuum tooling toward the panel, align it with suitable gripping areas and seat the cups against the surface. Establish the vacuum and check the grip.
  2. Slowly lift the panel clear of the support surface, leaving turning space between the panel, worktop and surrounding equipment.
  3. Maintain the vacuum grip and use the turning mechanism for the 90° orientation change, then guide the manipulator to transfer the panel to its target position.
  4. Align the panel with the receiving position and lower slowly. Release the vacuum after stable support is established, then withdraw the tooling and return to the pickup position.

Selection and configuration

  • Cup quantity, distribution and contact materials can be selected for panel area, stiffness and surface condition, matching the available gripping areas.
  • The vacuum source and grip-status monitoring can be selected for panel-surface flatness and permeability to suit the actual pickup conditions.
  • Manipulator mounting and working range can be selected for the workstation layout, accounting for horizontal or vertical pick-and-place heights and turning space.

Frequently asked questions

What orientation changes can this panel-handling system perform?

The vacuum turning tooling turns through 90° to connect horizontal and vertical panel orientations. The manipulator provides lifting assistance while the operator uses the handles to guide transfer and placement.

How is the vacuum tooling adjusted for different panel areas?

Cup quantity and distribution can be adjusted for panel dimensions, stiffness and available gripping areas, with suitable contact materials. Adjustable or dedicated vacuum-tooling configurations can be used for different panel families.

Submit your requirements, get a technical proposal

Share the workpiece name, weight per workpiece, dimensions and pick-and-place motions, and an engineer will recommend a manipulator arrangement, working range and end tooling. Drawings and site photographs can be sent by email or WeChat.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.