Application cases · Power supply packing and handling

Power Supply Packing and Handling Application

A mobile-base pneumatic industrial manipulator with custom tooling and a dedicated cart assists with gripping, lifting and packaging transfer of power supply products. It reduces repetitive carrying and allows different packaging areas to share the equipment at different times.

Equipment arrangement
Mobile-base pneumatic industrial manipulator
Tooling
Custom tooling
On-site power supply packing and handling applicationPower supply packing and handling

Application overview

Packing power supply products requires repeated pickup, transfer and placement. Fixed equipment can have difficulty serving tasks across dispersed areas. A mobile-base pneumatic industrial manipulator with custom tooling uses a dedicated cart to change areas while unloaded and operates after the base is positioned. The manipulator assists with carrying the handling load while the operator guides products into the packaging position, reducing repetitive carrying and manual lifting.

System configuration

System configuration
WorkpiecePower supply products and packaging materials
Equipment arrangementMobile-base pneumatic industrial manipulator
ToolingCustom tooling
Supporting structureDedicated mobile cart
Main motionsGripping, lifting, transfer within the workstation, positioning and packing assistance
OperationOperation after the mobile base is positioned; unloaded repositioning

Configuration features

  • The mobile manipulator and dedicated cart change areas while unloaded and operate in position, allowing dispersed packaging stations to share the equipment at different times.
  • Custom tooling engages the product's contact areas and works with the manipulator for repetitive gripping and transfer, reducing direct manual carrying.
  • The operator guides the workpiece toward the packaging position, connecting lifting, movement and placement to reduce the effort of handling during packing.

Operating sequence

  1. Move the unloaded equipment to the packaging station, position the base and engage its brake or supports, then guide the tooling toward the product to be packed.
  2. Align the tooling with the product's gripping positions, grip and confirm its status, then lift the product clear of its original support.
  3. Keep the base in position and guide the manipulator toward the packaging location, gradually adjusting the product orientation and placement position.
  4. Lower the product slowly. Release and withdraw the tooling after it is supported. Unload the equipment before changing areas.

Selection and configuration

  • Dedicated tooling can be selected for differences in product shape and permitted contact areas, matching the pickup method to each type of packaged item.
  • Different manipulator arrangements and working ranges can be selected for packaging-table layouts so that the system covers the relevant pick-and-place positions.
  • A suitable mobile-cart structure can be selected for aisle and workstation space, accounting for unloaded repositioning and operation in position.

Frequently asked questions

Which packing tasks does the manipulator perform?

The manipulator assists with gripping, lifting, transferring and placing the product while the operator guides it into the packaging position. Carton sealing, labeling and other packing processes can follow after placement.

How can several packaging areas share the equipment?

Finish handling the current product and unload the equipment before moving the cart to another operating area. Operate after the mobile base is positioned, using the manipulator for handling within that workstation.

Submit your requirements, get a technical proposal

Share the workpiece name, weight per workpiece, dimensions and pick-and-place motions, and an engineer will recommend a manipulator arrangement, working range and end tooling. Drawings and site photographs can be sent by email or WeChat.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.