Résumé
Cette synthèse distingue les paramètres documentés du projet des hypothèses paramétriques. Les calculs ne remplacent pas la validation de la machine concernée. Le résumé anglais présente les résultats et leurs limites.
This study evaluates a column-mounted manipulator with a rated working load of 500 kg at the existing 2.5 m end-joint radius and a hypothetical 3.5 m extension. Drawing geometry for eight M24 L-shaped cast-in anchors is separated from resistance evidence. A complete load path includes the payload, fixture, arm, counterweight and fixed column. Tension-only anchor springs and compression-only contact are solved with exact polygon integration. Unverified masses, centres of gravity and accelerations are explicit research inputs. Under the representative combined case, overturning moments are 25.39 and 34.83 kN m, and peak individual anchor tensions are 9.65 and 14.11 kN. For the suggested 1.5 by 1.5 by 0.8 m footing, peak soil pressures are 113.4 and 214.7 kPa, with contact fractions of 66.2% and 34.0%. The 3.5 m pressure maximum occurs near 24 degrees rather than necessarily along an edge or diagonal. Steel, plate bending, concrete anchorage, footing structure and ground bearing are assessed separately. Thirty-four numerical verification checks support the calculation implementation. The conditional results do not certify the actual equipment, anchorage or foundation, and do not authorize extending the existing machine to 3.5 m.
Keywords: column-mounted manipulator; overturning moment; anchor group; unilateral contact; eccentric footing pressure; parametric study
Texte intégral en chinois
Les rapports PDF et Word sont en chinois et contiennent un résumé en anglais.