Abstract
This study independently reconciles proposals and countersign drawings for air-shaft manipulators rated at 300 kg and 500 kg. The 300 kg project specifies rolls of 100–180 kg; these are design inputs rather than weighing records. The historical 500 kg proposal specifies a 500 kg roll design condition, whereas the latest available V3 drawing dated 25 October 2026 removes the flip mechanism. Consequently, results above zero degrees for that project are extension cases only. A continuous horizontal-to-downward-vertical model separates axial slip demand, transverse bearing load, root bending, contact reactions and flip actuator demand. Chamber pressure is converted to contact pressure only through explicitly assumed effective actuation area, transmission efficiency and contact area. For a 180 kg roll, a 0.65 m centre-of-mass lever and a vertical load factor of 1.3, the horizontal transverse load is 2.295 kN, root bending is 1.492 kN m and vertical axial demand is 2.295 kN. The 500 kg comparison gives 6.374 kN, 4.143 kN m and 6.374 kN, respectively. A 10,800-point parameter sweep and independent endpoint calculations show why axial friction ratios alone do not establish contact feasibility or structural adequacy. All unmeasured inputs remain explicit assumptions. The work supports model calibration and test planning, not equipment certification.
Keywords: air shaft; roll retention; axial slip; contact pressure; cantilever bending; 90-degree flip
Key findings
- For m=180 kg, d=0.65 m, h=0 and k=1.3, the transverse load at 0° is 2.295 kN and the root bending moment is 1.492 kN·m; the axial outward-slip demand at 90° is 2.295 kN.
- For a design mass of 500 kg, the corresponding demands are 6.374 kN and 4.143 kN·m. The 500 kg V3 configuration is horizontal only; the 90° results are extension comparisons only.
- With the explicit assumptions p_g=0.60 MPa, η=0.70, effective actuation width 0.060 m and μ=0.25, the friction-capacity/demand ratios at 90° are 1.235 for A180 and 0.593 for B500. These ratios are not measured safety factors.
- The equal-preload, eight-pad model for A180 produces a negative normal force at 0°, invalidating that contact-distribution assumption. An axial capacity ratio greater than 1 alone does not verify retention throughout the flip.
- Under the assumption that equivalent effective area grows linearly with L, increasing L raises friction capacity and shortens the lever arm, while mean contact pressure remains independent of L. Supply pressure and contact pressure must not be treated as interchangeable.
Scope and limitations
- The study considers an air shaft inserted from one end into a closed-section core. The roll and core are treated as a rigid body with no relative slip. Loose film layers, core-layer debonding, external pulling, collisions and simultaneous rotation about multiple axes are excluded.
- The 300 kg value is the equipment rated working load; 100–180 kg is the workpiece mass range specified in the proposal. No measured weighing records are available. A 300 kg workpiece is treated separately as an extension to the rated specification, outside the stated production workpiece range.
- The historical proposal uses 500 kg both as the equipment rating and as the film-roll design mass. The latest available V3 drawing removes the flip mechanism. Results for θ>0° in that project represent the historical configuration or an extension study; they do not authorize flipping with the current equipment.
- Complete measurements or manufacturer data are unavailable for effective insertion length, centre of mass, contact area, transmission efficiency, coefficient of friction, shaft cross-section, allowable core contact pressure and flip-cylinder dimensions. This study provides parametric load demands and conditional capacities, not a finding of equipment compliance.
- The quasi-static load factor k is evaluated separately from explicit angular velocity and acceleration. Mathematical verification and physical testing are reported separately. No lifting, crushing, air-loss or destructive tests were conducted.
1 Research question and applicability
Once the air shaft enters the core, the roll weight passes through the expanding pads and shaft to the root flange, then to the end-effector bracket or flip mechanism. In the horizontal position, transverse load and cantilever bending dominate; with the shaft pointing downwards, gravity mainly drives the core to slide off axially. Intermediate orientations combine both effects. Simply dividing the entire weight by the coefficient of friction yields only a normal-preload requirement for one direction. It does not describe the support couple required with short insertion, or the flip-actuator load throughout the stroke.
The study separately checks the 300 kg equipment proposal and countersign drawing dated 13 October 2026 [1,2], and the 500 kg historical proposal, original drawing and V3 countersign drawing dated 25 October 2026 [3–5]. The former specifies film rolls of 100–180 kg, 500–700 mm outside diameter and 800–1300 mm length, with a 6-inch air shaft and a 90° flip. The latter historical proposal specifies a 500 kg film roll as a design input, whereas V3 retains only a horizontal air shaft. Documented ratings are not certificates of axial frictional retention, and blank countersign fields are not evidence of testing or signing.
Version applicability: The parameter table and technical requirement 1 on page 1 of the 500 kg V3 drawing explicitly specify no flip mechanism. The B500 horizontal case in this report studies the corresponding load demand; its 45° and 90° cases are comparisons with the historical configuration or extension cases only. This report does not change the current equipment configuration or recommend motions for which it is not equipped.
Here, “minimum holding force” first means the axial reaction A needed to prevent outward axial slip. If retention relies on friction, the required normal preload N must be calculated separately. The transverse component T is carried primarily by radial contact between the closed-section core and shaft; it cannot simply be written as μN without contact analysis. Transverse loss of the load generally involves core rupture, excessive shaft deflection, pad failure or loss of overlap after axial withdrawal. Both contact and structural conditions are therefore retained in the study.
- The study considers an air shaft inserted from one end into a closed-section core. The roll and core are treated as a rigid body with no relative slip. Loose film layers, core-layer debonding, external pulling, collisions and simultaneous rotation about multiple axes are excluded.
- The 300 kg value is the equipment rated working load; 100–180 kg is the workpiece mass range specified in the proposal. No measured weighing records are available. A 300 kg workpiece is treated separately as an extension to the rated specification, outside the stated production workpiece range.
- The historical proposal uses 500 kg both as the equipment rating and as the film-roll design mass. The latest available V3 drawing removes the flip mechanism. Results for θ>0° in that project represent the historical configuration or an extension study; they do not authorize flipping with the current equipment.
- Complete measurements or manufacturer data are unavailable for effective insertion length, centre of mass, contact area, transmission efficiency, coefficient of friction, shaft cross-section, allowable core contact pressure and flip-cylinder dimensions. This study provides parametric load demands and conditional capacities, not a finding of equipment compliance.
- The quasi-static load factor k is evaluated separately from explicit angular velocity and acceleration. Mathematical verification and physical testing are reported separately. No lifting, crushing, air-loss or destructive tests were conducted.
All figures were drawn from the mechanics model and use anonymized case codes A and B. Public manufacturer information is used only to check structural principles and selection factors; it does not replace the product rating data for either equipment configuration. [9,10]
2 Inputs and research method
| Parameter | A: 300 kg equipment | B: 500 kg equipment | Use in this study |
|---|---|---|---|
| Equipment rated working load | 300 kg | 500 kg | Design specifications, not weighing results |
| Workpiece mass | 100–180 kg | 500 kg design case in the historical proposal | No measured weighing records for either project |
| Core inside diameter | 152 mm (nominal 6 inches) | 76/152 mm (nominal 3/6 inches) | Documented values retained; exact inch conversions do not replace the original nominal dimensions |
| Roll/core axial length | Film roll: 800–1300 mm | Core: 1300 mm | For B, a roll occupying the full length is assumed when locating its centre of mass |
| Film-roll outside diameter | 500–700 mm | Not specified | The 0.7 m example for B is an assumption for inertia comparison only |
| Shaft projection/length | Projecting working length: 450 mm | Both shafts: 600 mm in the historical proposal | Neither value can be equated directly with effective insertion L |
| Orientation | Horizontal to vertically downward, 90° | V3: horizontal, no flip mechanism | The historical proposal and original drawing included a 90° flip |
| Shaft cross-section and rated retention capacity | Values unavailable | Values unavailable | Demand model retained; no conclusion on structural adequacy |
| Actual support stations and centre-of-mass coordinates | Values unavailable | Values unavailable | Uniform-roll and two-station research models used |
| Fixture/equipment self-weight | Values unavailable | Values unavailable | The example 40 kg is an assumed moving fixture mass only; total equipment self-weight is excluded from the end-effector model |
Sources: [1–5]. Word documents are located by section and table number; drawings by the page 1 parameter table and technical requirements.
The wording in §1 of the 500 kg proposal differs from the physical definitions in its Tables 6 and 11: Table 6 explicitly places 500 kg in the film-roll parameter row, while Table 11 gives 500 kg as the equipment rated working load. Both definitions are retained here, but neither value is described as a measured mass. The 300 kg equipment has an explicit workpiece range of 100–180 kg, so 300 kg cannot be substituted directly into results labelled as actual film-roll cases.
Effective insertion length L is the axial overlap that actually transfers load through contact. The 450 mm value for A is a projecting working length and may include non-contact end regions, pad spacing or a flange transition. The 600 mm value for B comes from the historical proposal; V3 does not restate that length. Using these values as upper limits for L is a research assumption. The baseline assumes a uniform roll and uses the long-roll value W=1.3 m. At full insertion, the centre of mass is therefore 0.65 m from the root, not L/2.
| Symbol/item | Baseline or range | Evidence and purpose |
|---|---|---|
| g | 9.80665 m/s² | Standard acceleration of gravity [6] |
| k | 1.0/1.3/1.6; baseline 1.3 | Vertical load factors selected for the study, not prescribed safety factors |
| L | A: 0.25–0.45 m; B main grid: 0.25–0.60 m | Effective-overlap sweep; B includes a 0.25 m low-insertion stress-test case |
| W, d, h | Baseline W=1.3 m; d=l_s−L+W/2; h=0 | Uniform axial mass distribution and no additional gap at the near end |
| p_g | 0.30–0.80 MPa(g); baseline 0.60 | Expansion-chamber gauge pressure; low-pressure points examine pressure loss |
| μ | 0.10/0.20/0.25/0.35/0.50 | Sensitivity range; no coefficient is assigned to the actual contact materials |
| A_eff/L, η | 0.03/0.06/0.09 m; 0.50/0.70/0.90 | Baseline 0.060 m and 0.70; effective force-transmission parameters require calibration |
| φ, F_r | 0.15/0.30/0.50; baseline F_r=0 N | φ is the contact coverage fraction; neglecting return force overestimates capacity |
| Offset from C to O, (a,b) | (0.10,0.05) m | Illustrative flip geometry, not measured from drawings |
| Moving fixture | 40 kg; centre of mass (0.25,0.02) m; I_G=1 kg·m² | Independent study assumption: an equivalent body including the shaft and components rotating with it |
| Twin-cylinder geometry | B=(0.10,0.45) m; rocker-arm radius 0.20 m | Initial pin position (−0.20,0), efficiency 0.85; no actual bore specified |
| Explicit motion | 4 s/90°; acceleration and deceleration each 1 s | Fixed flip axis; k=1; not a measured equipment cycle time |
The proposal's 0.5–0.8 MPa range provides equipment inlet-supply context only. The calculation pressure p_g is a separately assumed expansion-chamber pressure; actual preload is not inferred from the default configuration.
Orientation is sampled continuously from 0–90° in 0.25° increments, giving 1,805 rows for five mass/core combinations. For each of A180 and B500, the main parameter grid combines 8 values of L, 5 pressures, 5 friction coefficients, 3 values of k, 3 equivalent actuation widths and 3 efficiencies, for 10,800 combinations in total. Main-grid pressures are 0.30, 0.40, 0.50, 0.60 and 0.80 MPa; the heat maps additionally sample continuously to show boundaries over 0.30–0.80 MPa. A separate mass sweep covers 100–500 kg in 20 kg steps. B's 0.25 m point is solely a low-insertion sensitivity case and does not imply acceptable overlap.
The study follows the sequence: source definitions → rigid-body loads → contact feasibility → structural demand → actuator demand. A, T and M are first calculated independently of friction materials; capacity is then discussed using explicit effective-area and force-transmission relationships. Calculations use SI units, with plots and tables converted to kN, kN·m and MPa. Angle inputs are in degrees and are converted to radians for trigonometric functions. Standard gravity is taken from the NIST listing. [6]
3 Mechanics model and derivation
The global x-axis points right, z points up, and the flip axis lies along y. Positive θ is downward rotation from the horizontal. The air-shaft axial unit vector e points towards the free end; n is the upward normal perpendicular to e in the flip plane. The local coordinates from root O to workpiece centre of mass G are (d,h), and those from flip axis C to O are (a,b). Here h is the workpiece centre-of-mass offset from the shaft axis, whereas b is the normal offset between the flip axis and air shaft. They are distinct quantities.
e and n are dimensionless unit vectors; d and h are in m; θ is evaluated in rad.
3.1 Axial and transverse demand. The quasi-static amplification method writes the equivalent weight as W*=kmg, for preliminary screening with a single factor representing equivalent vertical inertia. The factor k does not simultaneously represent angular acceleration, impact and safety reserve. Projecting W* onto the axial and transverse directions gives the components below; the axial retaining reaction acts opposite to A.
m is workpiece mass in kg; g is in m/s²; k is dimensionless; A and T are in N. The transverse load vector is −T n.
Clockwise is positive; units are N·m. The bending-moment magnitude is the absolute value. Only the workpiece is included, excluding shaft and other fixture self-weight.
Equation (3) follows from the y-component of the moment vector r×W. For h=0, A increases with θ, while T and M_O decrease; maximum bending occurs horizontally. If h is nonzero, the vertical position retains a moment W*h. For positive d and h, the peak occurs at θ=atan(h/d), not necessarily at 0°. The study does not substitute a zero-vertical-moment assumption for checking actual eccentricity.
l_s is the root-to-tip length and W is the roll axial length, both in m. Changing L moves the near end of the roll towards the root; it does not merely lengthen the pads.
3.2 Short insertion and the support couple. For h=0 and an axial friction resultant passing through the core centre, radial contact is represented by two stations x1 and x2. Taking reactions on the roll in the +n direction as positive, force and moment equilibrium about the root give R1+R2=T and R1x1+R2x2=Td.
R1 and R2 are in N. Negative R1 means that the opposite inner wall must provide a reverse reaction at the near station; it does not mean that the core can sustain tensile contact.
When the centre of mass lies beyond the far station, the far-station reaction exceeds T and the near station must provide the opposing part of the couple. Distributing the total transverse load equally among the pads would lose the contact distribution required by cantilever bending. The two-station model determines only net reactions, not a unique pressure for each pad. Actual axial distribution, radial stiffness, clearances and core ovalization remain part of the contact solution.
3.3 From chamber pressure to contact pressure. Primary manufacturer information explains that an inflated internal bladder transmits outward force through expanding pads, with shaft and pad type, core material, dimensions and operating conditions all relevant to selection. [9,10] Pressure p_g acts on an effective actuation area A_eff; it is not a uniform pressure applied directly to the entire inner surface of the core. The following is an equivalent preload model requiring calibration, not a physical identity determined by core diameter alone.
N0 is the scalar sum of the pad normal forces, in N, not their vector resultant. p_g and q are in Pa; η and φ are dimensionless; a_e is in m; A_eff and A_c are in m²; F_r is the equivalent return-force loss in N.
One calibratable quasi-static compatibility model: k_i is the equivalent contact stiffness in N/m, c_i the clearance in m and s the generalized actuation displacement in m. The right-hand equation expresses virtual-work equilibrium; an actual bladder may require multiple degrees of freedom.
Equation (7) shows that even at the same p_g and D_i, different actuation areas, pad strokes, transmission ratios, return elasticity or core stiffness can produce different N_i and q_i. In practice, η can vary with pressure, clearance and structural state. Holding it constant here is a reproducible simplification. The value φ=0.30 defines only mean contact area; it cannot predict edge pressure peaks at the pads. Thin core walls, laminated construction and local crushing require separate tests or contact analysis.
3.4 Axial friction and contact feasibility. The Coulomb model expresses the local static-friction constraint as |f_i|≤μ_iN_i, with the coefficient depending on the contact surfaces and their condition. [8] For a force-level screen alone, a uniform μ gives C_ax=μN0 and H=C_ax/A. When A=0, the ratio is undefined; this study reports the capacity margin instead of claiming infinite safety.
C_ax and A are in N. This is an upper-bound screen for axial capacity; it cannot by itself establish simultaneous moment equilibrium.
To examine radial constraints, the study constructs two support stations, each with four equivalent pads in orthogonal radial directions. Each of the eight pads initially has normal force N0/8 and area A_c/8. At each station, the pair along n gains and loses R_i/2 respectively; the other pair retains its preload. This construction closes the resultant-force and moment balance, but does not assert that the original shaft has exactly eight pads.
The stations are i=1,2, with 8 equivalent contact pads in total. Every N must be ≥0. A negative value invalidates this equal-preload distribution model.
These are the no-unloading condition and maximum individual-pad mean pressure for this eight-pad construction. They are not the actual microscopic peak pressure or a necessary condition for every air shaft.
Simply distributing axial friction in proportion to each N_i can introduce an additional bending moment through asymmetric tractions at the core radius. To preserve the central axial resultant assumed in Equation (5), each opposing pair can carry equal axial friction, limited by the smaller normal force in that pair. This gives a conservative capacity construction that satisfies local friction limits and introduces no additional bending moment:
Equation (11) applies only when Equation (10) holds and the contact areas and directions of each pair follow this model. It represents the capacity of a feasible distribution, not a claimed optimal capacity for the actual shaft.
If Equation (10) fails, negative normal forces must not simply be clipped to zero while retaining the original equilibrium solution. Partial contact and stiffness compatibility must be solved again. If shaft-axis torque, external packaging tension or friction in several directions is required, each contact must also satisfy a friction-circle or friction-cone constraint; the same friction capacity cannot be counted repeatedly.
3.5 Loads at the root and flip mechanism. The workpiece bending moment at air-shaft root O differs from the total load at flip axis C. The roll centre of mass is at (d+a,h+b) relative to C, and the shaft, rocker and other components rotating with the flip must also be included. The following equation treats the moving fixture's equivalent mass m_f and centre of mass (d_f,h_f) as separate terms.
Units: N·m. Fixture mass is a separate term. Equipment rated load must not replace workpiece mass or fixture self-weight.
Transverse moment of inertia for a uniform annular-cylinder approximation, followed by the combined parallel-axis transformation [7], in kg·m². B's outside diameter and fixture inertia are study assumptions.
A torque envelope shared equally between two cylinders when the direction is unknown. h_c is the perpendicular moment arm in m and η_c is efficiency. Here M_loss=0, so actual friction losses are excluded. k envelopes only vertical effects; α separately envelopes rotation.
B and P are the fixed-end and rocker-pin coordinates in the flip plane, in m. h_c varies with angle. Actual cylinder desynchronization or unequal loading requires separate models for the two cylinders.
A flip cylinder requires more than pA=F. Extension and retraction have different effective areas; exhaust back pressure, mechanical efficiency and cylinder-end friction all affect net force. As h_c approaches zero, force rises near the dead-centre position. The example B=(0.10,0.45) m and r=0.20 m are reproducible illustrative geometry, not actual pivot coordinates reverse-engineered from drawing pixels.
D_c is cylinder bore and d_r is rod diameter, in m; pressures are the corresponding chamber gauge pressures in Pa. The pressure-loaded areas exchange roles during retraction. Net force must meet the demand in the actual direction.
3.6 Explicit dynamics. Let d_c=d+a and h_cg=h+b. The local translational acceleration of the fixed or moving flip axis is (a_Ce,a_Cn). Angular velocity ω and angular acceleration α are positive for downward flipping. Rigid-body kinematics gives the centre-of-mass acceleration; the equivalent force transmitted by the workpiece to the air shaft is m(g−a_G). Here k=1 avoids counting motion inertia twice. [7]
Units: m/s². ω is in rad/s and α in rad/s². The model describes rigid planar flipping and excludes independent roll rotation about its own axis.
F_e>0 acts in the outward-slip direction; F_e<0 is a reverse axial demand, whose magnitude must still be covered by friction. M_O includes the pure couple due to workpiece rotational inertia.
Clockwise actuator torque. M_C,g is the gravitational moment with k=1; j includes the workpiece and moving fixture. For fixed C the translation term is 0. A negative value requires reverse drive torque or braking.
Finally, shaft bending strength cannot be inferred from a 6-inch core bore. The net section modulus Z after holes and slots, material allowable stress, stress concentrations, joints and fatigue each need their own basis. For demand reporting alone, Z_req=|M_O|/σ_d gives a target section modulus; this equation does not verify the shaft, flange or pins. [11]
4 Worked cases and calculation results
4.1 Effect of the mass definition. Table 3 calculates 100 kg, 180 kg, 300 kg and 500 kg separately. Every row uses d=0.65 m and h=0 to isolate the effect of workpiece mass. The A300 extension does not replace the stated 100–180 kg film-roll range for the 300 kg equipment. B500 is the historical proposal's design mass, not a weighed value.
| Case | m / kg | mg / kN | M_O(0°), k=1 / kN·m | M_O(0°), k=1.3 / kN·m |
|---|---|---|---|---|
| A100 | 100 | 0.981 | 0.637 | 0.829 |
| A180 | 180 | 1.765 | 1.147 | 1.492 |
| A300 extension | 300 | 2.942 | 1.912 | 2.486 |
| B500 extension | 500 | 4.903 | 3.187 | 4.143 |
Workpiece loads only; actual shaft self-weight is excluded.
| Case | θ / ° | A / kN | T / kN | M_O / kN·m | M_C,g* / kN·m |
|---|---|---|---|---|---|
| A180 | 0 | 0.000 | 2.295 | 1.492 | 1.849 |
| A180 | 45 | 1.623 | 1.623 | 1.055 | 1.395 |
| A180 | 90 | 2.295 | 0.000 | 0.000 | 0.125 |
| B500 extension | 0 | 0.000 | 6.374 | 4.143 | 4.908 |
| B500 extension | 45 | 4.507 | 4.507 | 2.930 | 3.703 |
| B500 extension | 90 | 6.374 | 0.000 | 0.000 | 0.329 |
M_C,g* includes the assumed 40 kg moving fixture and offsets in Table 2. The B500 cases at 45° and 90° are extension studies.
For A180 in the horizontal position, the 2.295 kN transverse load produces a root bending moment of 1.492 kN·m. At 45°, the axial and transverse components are each 1.623 kN and root bending is 1.055 kN·m. Vertically downward, axial demand reaches 2.295 kN and the workpiece root moment is zero under the h=0 assumption. The flip axis nevertheless carries 0.125 kN·m of gravitational moment because of b and fixture eccentricity. The 500 kg comparison similarly gives 6.374 kN, 4.143 kN·m and a vertical flip-axis moment of 0.329 kN·m. That vertical value does not represent actual V3 operation.
4.2 Reactions with short insertion. For A180 at full insertion L=0.45 m, x1=0.045 m, x2=0.405 m and d=0.65 m. Horizontally, R1=−1.562 kN and R2=3.856 kN; the far-station reaction is 1.681 times the net transverse load. For B500 with the assumed historical length of 0.60 m, x1=0.060 m, x2=0.540 m, R1=−1.461 kN and R2=7.835 kN. The negative near-station reaction must come from the opposite inner wall. If the actual pads do not cover that direction, the assumed contact model is inapplicable.
Reducing A180 insertion from L=0.45 m to 0.25 m increases d from 0.65 m to 0.85 m and root bending from 1.492 to 1.951 kN·m, a 30.8% rise; the far-station reaction rises to 7.171 kN. For B500 at L=0.30 m, d=0.95 m and root bending is 6.056 kN·m. At the lower-insertion study point L=0.25 m, d=1.00 m and the moment is 6.374 kN·m. Insertion length affects the lever arm, support span and effective pneumatic area together; none can be considered in isolation.
| Case | A_eff / m² | N0 / kN | Mean q0 / MPa | H(90°) | p_crit,ax / MPa |
|---|---|---|---|---|---|
| A180 | 0.027 | 11.340 | 0.176 | 1.235 | 0.486 |
| B500 extension | 0.036 | 15.120 | 0.176 | 0.593 | 1.012 |
p_g=0.60 MPa, η=0.70, a_e=0.060 m, μ=0.25, φ=0.30, F_r=0. The value p_crit is only the friction-equality boundary, with no safety reserve; it is not a recommended pressure setting.
4.3 Contact-model screening. Baseline A180 has N0=11.340 kN, axial friction capacity of 2.835 kN at 90° and H=1.235. B500 has 15.120 kN, 3.780 kN and H=0.593, respectively. A ratio above 1 for A does not establish retention throughout the flip: at 0°, its eight-pad model has a minimum normal force of −0.511 kN, making the equal-preload distribution incompatible with full contact. The model's no-unloading angular boundary is 42.682° for A and 61.155° for B. These angles mark only where the particular contact assumption starts to be feasible; they are not actual safe operating ranges for the equipment.
At 45° for A180, the eight-pad model retains a minimum normal force of 54.0 N and a maximum individual-pad mean pressure of 0.345 MPa. Symmetric axial-friction distribution between opposing pads gives C_sym=1.877 kN, exceeding the 1.623 kN demand. At 90°, this construction returns C_sym=2.835 kN. For B500 at 45°, even the force-level upper bound of 3.780 kN is below the 4.507 kN demand; at 90° its upper-bound ratio remains only 0.593. The selected illustrative pneumatic parameters therefore do not support a conclusion that B500 can retain the roll during flipping. Neither case has allowable core-pressure data, so these calculated pressures cannot establish that the core remains undamaged.
4.4 Flip mechanism. Table 6 calculates twin-cylinder loads using the same illustrative pivot geometry, including a rotational-inertia envelope of |α|=0.5 rad/s². The cylinder moment arm is 0.166 m horizontally, 0.199 m at 45° and 0.074 m vertically; end-of-stroke positions do not imply a constant moment arm. A180 requires 6.775 kN per cylinder horizontally and 1.529 kN vertically. The corresponding B500 extension values are 18.008 kN and 4.080 kN. These results cannot establish adequate drive capacity when the actual bore is unknown.
| Case | θ / ° | h_c / m | Torque envelope / kN·m | Demand per cylinder / kN |
|---|---|---|---|---|
| A180 | 0 | 0.166 | 1.917 | 6.775 |
| A180 | 45 | 0.199 | 1.464 | 4.337 |
| A180 | 90 | 0.074 | 0.193 | 1.529 |
| B500 extension | 0 | 0.166 | 5.094 | 18.008 |
| B500 extension | 45 | 0.199 | 3.889 | 11.525 |
| B500 extension | 90 | 0.074 | 0.515 | 4.080 |
k=1.3 envelopes only vertical effects; |α|=0.5 rad/s² separately envelopes rotation. η_c=0.85; mechanical losses are neglected.
4.5 Explicit motion example. A180 completes a 90° downward flip in 4 s, with 1 s each for acceleration and deceleration, a fixed flip axis and k=1. Here ω_max=0.524 rad/s and |α|=0.524 rad/s². Across 801 time points, peak outward axial demand is 1.776 kN, peak clockwise root load is 1.107 kN·m and actuator torque ranges from −1.398 to −0.096 kN·m. The negative sign means that gravity assists downward flipping and the drive must supply an opposing control torque. The quasi-static |M|+I|α| expression is a bidirectional envelope, not the signed torque along this specific time history.
Forces and moments can jump at the idealized acceleration switches at 1 s and 3 s; data at the switching instants uses the right-hand piecewise value. Actual speed control and cushioning should produce smooth acceleration, with measured end-effector translation included. The static two-station contact diagram does not automatically apply to this dynamic trajectory. Dynamic contact must be rebalanced using the resultant force and pure couple in Equation (18).
5 Parameter sensitivity and engineering discussion
5.1 Mass and dynamic factor. At the same orientation, lever arm and geometry, A, T and M_O are proportional to both m and k. At k=1, 1.3 and 1.6, A180 demand at 90° is 1.765, 2.295 and 2.824 kN, respectively. The baseline friction capacity of 2.835 kN gives H≈1.606, 1.235 and 1.004. At k=1.6, the force-level margin is only about 11 N, far too small to absorb uncertainty in friction and pressure. A ratio just above 1 must therefore not be described as ample reserve. Actual mass, worst-case centre of mass, translational acceleration and angular deceleration during braking should be measured separately.
5.2 Two ways of changing insertion. Equation (4) represents deeper insertion on the same shaft: the roll's near end approaches the root, so d decreases as L increases. If the roll position is held fixed and only the pads are lengthened, d stays constant and root bending does not decrease with L. Whether area increases continuously with L also depends on pad layout. It may increase in steps as insertion reaches successive pad rows, a detail outside the continuous linear model.
These relationships neglect F_r and use this study's linear area and displacement assumptions. The first does not apply to modifications that only add pad length while keeping the workpiece position fixed.
5.3 Pressure, friction and effective area. At baseline μ and effective area, the 90° force-level critical chamber pressure is 0.486 MPa for A180 and 1.012 MPa for the B500 extension. The latter exceeds the upper end of the documented inlet-pressure range. This is not a basis for raising pressure without authorization; verified effective area, contact design or load conditions should instead be adjusted. Even at 0.50 MPa, A has only H=1.030. Reaching that chamber pressure does not establish adequate retention for the actual bladder, core and contact state throughout the motion.
Friction-equality boundaries for 90° only, with no additional axial force and F_r=0. Any design reserve must be specified separately, and the upper pressure limit must also be checked.
At p_g=0.60 MPa, μ_crit is 0.202 for A180 and 0.422 for B500; the corresponding critical effective areas are 0.021855 m² and 0.060708 m². These are conditional targets for measurement and selection, not estimates of existing pad dimensions. Reducing η from 0.70 to 0.50 lowers capacity by 28.6%; reducing μ from 0.25 to 0.10 lowers it by 60%. Both changes directly affect the capacity/demand ratio. Increasing k cannot replace knowledge of the contact parameters.
5.4 Pressure window and core. In this model with independently defined areas, φ affects mean contact pressure but does not change N0. Reducing φ from 0.30 to 0.15 raises mean pressure from 0.176 to 0.352 MPa; φ=0.50 lowers it to 0.106 MPa. In a mathematical comparison that holds a_e, η and L fixed and changes only core inside diameter from 152 to 76 mm, mean pressure doubles to 0.352 MPa while axial capacity is unchanged. This does not imply that the two actual shafts have equal effective areas or load capacities. A180 already reaches an individual-pad mean pressure of 0.345 MPa at 45°, demonstrating that a whole-area average does not represent the most heavily loaded local pad.
Only the retention lower bound and local mean-pressure upper bound for this contact model are given. Without q_allow, the existence of a usable pressure window cannot be determined. Partial contact requires a new model.
5.5 Root, flange and shaft cross-section. Table 7 converts workpiece bending moment into required section modulus. The stress parameters 80, 120 and 160 MPa are deliberately selected study values, not verified allowable stresses for any material or code. Actual cross-sections contain pad slots, air passages, flanges and connection transitions. Stress concentrations, bolt groups, pins, welds, deformation or fatigue may govern. These results cannot establish the adequacy of a 3-inch or 6-inch shaft.
| Case | M_O / kN·m | Z_req@80 MPa / mm³ | @120 MPa / mm³ | @160 MPa / mm³ |
|---|---|---|---|---|
| A180 | 1.492 | 18645 | 12430 | 9322 |
| B500 horizontal | 4.143 | 51791 | 34528 | 25896 |
k=1.3, d=0.65 m; workpiece only. Stress concentrations, self-weight and fatigue are excluded; σ_d is a parametric stress limit.
5.6 Standards and air-loss limits. The official entry for ISO 4414:2010, edition 3, is used to check the subject, version and scope of the pneumatic-system safety rules. [12] This study did not obtain and review the complete standard clause by clause, and did not perform conformity certification. Air-loss brakes, an air reservoir and pressure-retaining circuits in the proposal have distinct functions. A rotary brake does not automatically replace axial retention by the air shaft. Reservoir hold time cannot be inferred without leakage-rate, volume and minimum-pressure data. A check-valve circuit does not prove retention after every possible hose rupture.
If chamber pressure falls, measured p_g(t) should be applied to a calibrated N0(p_g) relationship and local contact model to determine the first crossing of an allowable boundary. This study only samples reduced-pressure points; it gives no pressure-retention time or remaining number of operations. The rigid-body friction model cannot guarantee retention after core rupture, bladder rupture, severe contact contamination or slip between the film layers and core.
6 Conclusions and verification methods
- For m=180 kg, d=0.65 m, h=0 and k=1.3, the transverse load at 0° is 2.295 kN and the root bending moment is 1.492 kN·m; the axial outward-slip demand at 90° is 2.295 kN.
- For a design mass of 500 kg, the corresponding demands are 6.374 kN and 4.143 kN·m. The 500 kg V3 configuration is horizontal only; the 90° results are extension comparisons only.
- With the explicit assumptions p_g=0.60 MPa, η=0.70, effective actuation width 0.060 m and μ=0.25, the friction-capacity/demand ratios at 90° are 1.235 for A180 and 0.593 for B500. These ratios are not measured safety factors.
- The equal-preload, eight-pad model for A180 produces a negative normal force at 0°, invalidating that contact-distribution assumption. An axial capacity ratio greater than 1 alone does not verify retention throughout the flip.
- Under the assumption that equivalent effective area grows linearly with L, increasing L raises friction capacity and shortens the lever arm, while mean contact pressure remains independent of L. Supply pressure and contact pressure must not be treated as interchangeable.
Numerical checks were performed with an independent script that did not use the main model's formulas to generate expected endpoint values. High-precision Decimal arithmetic and 1/√2 were used at 0°, 45° and 90° for 45 mass/factor/angle combinations. The maximum absolute numerical difference in A, T and M was 9.10×10⁻¹³, in N or N·m as appropriate. Other angles were checked by Cartesian projection and cross products, and support stations by resultant-force and moment balance. Comparing the flip-cylinder moment arm with the numerical derivative of cylinder length with respect to angle gave a maximum error of 1.08×10⁻¹¹ m.
Explicit-dynamics acceleration was independently recalculated using second differences of world-coordinate positions. Excluding acceleration-switching points, the maximum difference was 4.24×10⁻⁸ m/s². An independent cross-product calculation of the root moment differed by at most 4.96×10⁻⁶ N·m. Further checks covered linear pressure scaling, mass scaling, independence of mean pressure from L under proportional-area assumptions, and vertical eccentric bending. In the nonnegative region, the eight-pad construction was checked for normal-force balance, symmetric friction capacity and local Coulomb constraints; invalid regions were not reported as feasible contact. These are independent-algorithm checks by the same research author, not a third-party engineering review.
| Verification subject | Method and records | Inputs needed for evaluation | Status in this study |
|---|---|---|---|
| Workpiece mass and centre of mass | Weigh each specification; use controlled support-point weighing or a model with verified material assignments | Mass range, worst-case centre of mass and core position | No physical measurements performed |
| N0(p_g,L) | Measure pad radial forces or calibrate against known constraints; record increasing- and decreasing-pressure loops | Actual effective area, return losses, contact stiffness and hysteresis | Parametric only |
| Axial retention | Apply axial tension slowly in a controlled load frame with a fall-arrest restraint; record the first relative displacement | Surface condition, L, chamber pressure, displacement criterion and measurement uncertainty | No tests performed |
| Transverse loading and local contact pressure | Apply transverse loads and couples in stages; record contact distribution, indentation, ovalization and permanent deformation | Core material, wall thickness, local allowable values and failure criteria | No tests performed |
| Root structure | Check the net section, flange, pins and connection details; compare strain and deflection | Materials and dimensions, notches, connection preload and load combinations | Demand reported only |
| Flip dynamics | Measure unloaded motion first, then load in stages under protective conditions; acquire angle, acceleration, chamber pressure and cylinder force synchronously | Actual pivots, bore/rod diameter, back pressure, speed and cushioning | Illustrative trajectory only |
| Retention after air loss | Controlled air-loss and leakage tests; record pressure decay and displacement | Circuit, volume, leakage, brake location and minimum retention pressure | No tests performed |
Physical tests must follow the equipment risk assessment and an approved test plan. This table describes methods and does not claim that they have been performed.
For engineering use, first verify that inputs match the specific equipment version, then replace contact and motion parameters with measurements or manufacturer data. A complete evaluation requires axial retention, radial-contact feasibility, core contact pressure, shaft/connection strength, flip-drive capability and the air-loss state each to satisfy their own conditions. The current 500 kg version can be evaluated only in the horizontal condition for which it is actually configured. The model identifies what to measure, why it matters and how measured values re-enter the calculations; it does not turn missing physical evidence into verified conclusions.
References
- Project A design records. Technical Proposal for a 300 kg Pneumatic Assist Manipulator with Air Shaft and 90° Flip. 2026-10-05, §1.1, §2.4–2.5 and §3. Controlled internal material; anonymized citation in the public edition.
- Project A design records. Countersign Confirmation Drawing for a 300 kg Pneumatic Assist Manipulator with Air Shaft and 90° Flip. 2026-10-13, sheet 1 parameter table and technical requirements. Anonymized citation in the public edition.
- Project B historical design records. Technical Proposal for a 500 kg Pneumatic Assist Manipulator with Air Shaft and 90° Flip. 2026-10-05, §1.1 Table 6, §2.4 Table 9, §2.5 and §3 Table 11. Basis for the historical operating case.
- Project B historical design records. Countersign Confirmation Drawing for a 500 kg Pneumatic Assist Manipulator with Air Shaft and 90° Flip. 2026-10-13, sheet 1. Basis for the historical flip configuration.
- Project B design records. Countersign Confirmation Drawing for a 500 kg Pneumatic Assist Manipulator with Air Shaft. V3, 2026-10-25, sheet 1 parameter table and technical requirement 1. Horizontal position; no flip mechanism.
- NIST. Guide to the SI, Special Publication 811, Appendix B.9. Standard acceleration of free fall conversion entry. Online edition. Source
- MIT OpenCourseWare. 8.09 Classical Mechanics III, Fall 2014. Chapter 2: Rigid Body Dynamics. Parallel-axis relationship and rotational torque equations, PDF pp. 11–16. Source
- Feynman R. P., Leighton R. B., Sands M. The Feynman Lectures on Physics, Vol. I, Chapter 12, §12-2 Friction. Caltech online edition. Source
- Double E Group. Metal Expanding Lug Shafts / DG-2000. Manufacturer product information, Summary and How It Works. Online, undated. Source
- Antech Converting. Air Shaft Technical Information. Lug Type / Leaf Type / Strip Type sections. Manufacturer technical information, online, undated. Source
- MIT. Engineering Mechanics for Structures, Chapter 8: Deflections due to Bending, §8.1 Moment/Curvature Relation. Online course text, PDF pp. 1–3. Source
- ISO. ISO 4414:2010, Pneumatic fluid power — General rules and safety requirements for systems and their components. Edition 3, 2010-11. Official catalog scope and version entry only. Source
Appendix A. Symbols, reproducibility and data definitions
| Symbol | Physical meaning | Unit |
|---|---|---|
| m / m_f | Roll mass / moving fixture mass | kg |
| W / l_s / L | Roll axial length / root-to-tip length / effective contact-overlap length | m |
| d,h / a,b | (e,n) coordinates from O to G / from C to O | m |
| D_i / R_i / R_o | Core inside diameter / annular-cylinder inner radius / annular-cylinder outer radius | m |
| R1,R2 | Net radial reactions on the roll at the two axial stations; distinct from inner radius R_i | N |
| A,T / N0 | Axial and transverse demand / scalar sum of normal preload forces | N |
| p_g / q | Expansion-chamber gauge pressure / contact pressure | Pa |
| a_e / φ / η / μ | Effective actuation width / coverage fraction / transmission efficiency / coefficient of friction | m / 1 / 1 / 1 |
| M_O / M_C / τ_C | Workpiece root bending moment / total flip-axis moment / signed actuator torque | N·m |
| ω / α / I | Angular velocity / angular acceleration / moment of inertia | rad/s / rad/s² / kg·m² |
To avoid ambiguity, equivalent weight at force level is written W*, while axial length is written W.
In the research package, inputs.json stores the input tables, source locations and study assumptions; scripts in calculations use it as their numerical input. The file angle_curves.csv stores continuous cases at 0.25° increments; endpoints.csv stores the three verification angles; independent_endpoints.csv stores independent high-precision results; parameter_scan.csv stores the 10,800 grid combinations; and dynamic_history.csv stores 801 time points. Blank values mean that a ratio is undefined or the contact model is invalid, not zero load or a pass.
The reproduction order is prepare_inputs.py, calculate.py, validate.py and write_report.py. Commands and dependencies are documented in the research package's BUILD.md. The model calculates in m, N, Pa and rad; kN, kN·m and MPa in the output tables are display conversions. Figure sources are supplied in both PNG and SVG. Independent verification checks model calculations only; it does not establish unmeasured material or contact parameters.
Editable mathematical source for every equation accompanies the research data. Source numbers link original design records to calculation inputs. Model recalculation and physical calibration should be recorded separately so that version, input and result changes remain traceable.
Download the report
Full English text is available on this page. PDF and DOCX downloads are the Chinese reports, including an English abstract.