Technical research

Mobile Manipulator Stability, Levelling and Support Transfer

This study examines foot-supported operation, unloaded caster travel and support transfer for an 80 kg rated mobile pneumatic manipulator.

AUREK-RC-AR-048V1.02026-10-25

Mobile Manipulator Stability, Levelling and Support TransferTechnical research
Figures and results

The full article on this page is in English. The downloadable PDF and DOCX reports are in Chinese and include an English abstract.

Abstract

Using the proposal and configuration for an 80 kg mobile vacuum pneumatic assist manipulator as the basis for its structure and operating limits, this study develops a quasistatic external-moment model for three modes: foot-supported operation, unloaded travel on casters, and support transfer. It distinguishes the 80 kg rated working load from the study workpiece mass, vacuum-tool mass and machine mass. Chassis dimensions, component masses, centres of gravity and caster offset not specified in the source documents are treated explicitly as parametric inputs. The assessment combines the convex hull of active contacts, the resultant reaction point and edge moments. Arm azimuth, slope direction and horizontal operating-force direction are scanned independently, and support transfer is checked for feasible normal reactions. The reference case assumes a foot span of 1.70 m × 1.40 m, an unloaded mass of 525 kg, an 80 kg workpiece, an end-centre radius of 2.00 m, a workpiece centre-of-gravity offset of 0.25 m and a horizontal force of 200 N. At study slopes of 0°, 2° and 5°, the minimum edge margins over all azimuths are 131.9, 107.0 and 69.4 mm respectively, with the arm extended towards the rear ballast controlling in each case. At 5°, an additional composite centre-of-gravity shift of 69.2 mm reaches zero margin. With the machine unloaded and stowed, the corresponding margins of the conservative four-caster support core are 366.1, 345.4 and 314.2 mm. However, three-point support caused by loss of an adverse corner during transfer gives a negative margin of -136.7 mm even on level ground. Braking, levelling, resistance to overturning and continuity of contact during transfer therefore require separate assessments. Neither the study slopes nor the critical values are permissible machine limits. These findings do not replace physical validation or authorise loaded travel.

Keywords: mobile manipulator; support polygon; rear ballast; casters; support transfer; stability

Key findings

  • The 80 kg rated load, workpiece mass, vacuum-tool mass and total machine mass are explicitly distinguished; travel remains unloaded.
  • In the assumed reference case, minimum foot-support margins at 0°/2°/5° are 131.9/107.0/69.4 mm, with rearward arm extension controlling.
  • A positive margin in the unloaded four-caster end state does not establish stability during support transfer; three-point support with a missing corner can be unstable.
  • Resistance to overturning, resistance to sliding, braking and levelling are assessed separately; calculation scripts and validation records accompany the study.

Study boundaries

  • The structure and operating rules are based on the 80 kg mobile-machine proposal; numerical geometry and physical properties are explicit study assumptions.
  • The modes are foot-supported operation, unloaded travel on casters with the arm stowed, and transfer between wheels and feet. Loaded travel is not authorised.
  • The model assumes a quasistatic rigid body and coplanar point contacts. The 0/2/5° slopes are study values, not permissible limits.
  • The study does not replace structural, floor, friction, braking, vacuum-gripping or prototype dynamic validation.

Research question and scope

A mobile base provides both support and repositioning, and its stability changes with contact state. The support area available when all four corner feet are on the floor cannot be applied directly to caster travel. Nor does the presence of a support component at each corner prove that all four corners are carrying compressive load. This study addresses three modes of the same equipment system through a continuous assessment: where the support boundary lies, where the resultant external-load reaction acts, and which contacts remain active.

The original proposal and configuration explicitly require unloaded travel, a stowed arm, and support and levelling on all four feet after positioning. They also prohibit moving the machine while holding a box by vacuum and prohibit substituting caster brakes for the support feet.[1][2] Accordingly, the caster calculations in this study include only zero workpiece mass. The 80 kg workpiece represents the upper study condition for foot-supported operation and does not establish a loaded-travel condition.

ISO 12100:2010 provides a framework for risk assessment and risk reduction.[3] HSE L113, second edition (2014, amended 2018), identifies the ground, slope, combined external forces and effective stabilising devices as factors in stability.[4] These references define the study method; crane or mobile elevating work platform rating ratios, permissible slopes and statutory inspection conclusions are not transferred to this machine.

Nature of the study: This is a parametric mechanics study grounded in documented structural arrangements. Geometry, masses, centres of gravity, operating forces and caster offsets in the numerical examples are not presented as measured properties of the machine. A positive margin means only that the model retains resistance to overturning under the specified contact conditions.

Table 1 — Three modes and definitions of active support
ModeWorkpiece and armSupport includedStudy conditions
Foot-supported operationWorkpiece 0–80 kg; scan extended configurationsFour corner foot contacts confirmed to carry compressionCasters carry no operating reaction; unconfirmed foot contacts are excluded
Unloaded caster travelWorkpiece 0 kg; vacuum tool remains fitted; arm stowedActual wheel–floor contacts, plus a conservative inscribed rectangleSlow pushing and equivalent disturbances only; braking capacity checked separately
Support transferWorkpiece 0 kg; arm remains stowedJoint convex hull of feet and wheels actually in contact at that instantCheck each state; the envelope of all parts does not replace the active contact set
Loaded travelOutside the original operating limitsNo permissible condition establishedPositive static calculations do not authorise loaded travel

The scope is a rigid chassis with coplanar point contacts and slow movements, without impacts or significant elastic oscillation. Individual-foot capacity, screw buckling, outrigger welds, caster bearings, caster-fork strength, local floor failure and vacuum-gripping reliability require separate checks; overall stability does not establish these capacities.

Input parameters and research method

The study inputs distinguish documented design values, documented configuration and operating rules, research parameters, and physical machine properties unavailable from the existing information. The technical entries in the two documents agree: 80 kg is the rated working load, 2000 mm is the maximum horizontal distance from the column rotation centre to the end rotation centre, and 1500 mm is the lifting stroke. The proposal cover is dated 10 October 2026, whereas the configuration cover states 15 August 2026. This source discrepancy is retained; the configuration publication date is not inferred from the project number.

Table 2 — Source inputs and physical definitions
ItemSource value or informationSource locationModel treatment
Rated working load80 kg[1] p. 6; [2] p. 5Separate from actual workpiece mass; study workpiece 0–80 kg
Maximum end-centre radius2.00 m[1] pp. 6, 9; [2] p. 5Add end offset e to obtain the workpiece centre-of-gravity radius
Lifting stroke1.50 m[1] pp. 6, 9Not an absolute height of the workpiece or machine centre of gravity
Box dimensionsLength 0.60–1.20 m, width 0.40–0.80 m, height 0.40–1.00 m[1] p. 6; [2] p. 5Indicates an offset scale; does not establish vacuum-tool mounting offset
BaseSteel chassis, casters, four corner screw outriggers, rear ballast box and towing handle[1] p. 4; [2] p. 4Use this arrangement; dimensions, wheel count and physical properties remain study inputs
Operating conditionsUnloaded travel with arm stowed; level, hard-surfaced floor and step-free routes[1] pp. 7–9; [2] pp. 6–7Study slopes do not change the original operating limits
Chassis dimensions, ballast mass, caster braking force and foot travelNo quantitative values specifiedFull text and illustrations of both documentsUse a parametric design space; do not infer capacities from photographs

Photographs and structural schematics support qualitative observations such as the front-to-rear layout, rear ballast and four corner outriggers. Without a scale, bill of materials or weighing evidence, they are not used to infer chassis mass or caster load ratings. The working air pressure of 0.5–0.8 MPa is background information from the proposal; it does not determine overall resistance to overturning. The pneumatic balance cylinder and internal joint forces are internal to the whole-machine free body used here and cannot be added as further stabilising forces from the ground.

Table 3 — Reference case and parametric ranges
VariableReference valueScan or variantsPurpose
Chassis + column mass and centre of gravity180 kg; (0,0,0.65) m120/180/240 kgCount the fixed structure separately; explore a wide range
Ballast mass and centre of gravity240 kg; (-0.45,0,0.25) m120/240/360 kg; position -0.60 to 0 mEvaluate directional effects of rear ballast
Equivalent arm mass / height80 kg; radius 0.45R; z=1.80 m50/80/110 kg; height factors 0.8/1/1.2Represent configuration-dependent centre of gravity; not a three-dimensional linkage solution
Vacuum-tool mass / height25 kg; radius R; z=1.60 m15/25/40 kg; the same height factorsKeep separate from workpiece mass and rated load
Workpiece mass / offset / height80 kg; e=0.25 m; z=1.20 m0/20/40/60/80 kg; e=0/0.25/0.60 m0.60 m is half the maximum box length, used as a sensitivity scale
Four-foot half-spans a,b0.85 m, 0.70 ma=0.65/0.85/1.05; b=0.50/0.70/0.90 mCompare compact and wider support layouts
Four-wheel mounting-axis half-spans and offset0.65 m, 0.50 m; t=0.08 mt=0/0.04/0.08/0.12 mConservative contact region with unknown wheel orientation
Extended / stowed radiusExtended R=2 m; stowed R=0.35 mExtended 1/1.5/2 m; azimuth grid 5°Stowed dimensions and full-azimuth reachability are study assumptions
Horizontal operating force and height200 N; operation 1.20 m, travel 1.00 m0/100/200/300 N; direction grid 15°External disturbance, not a permissible human operating force
Slope / centre-of-gravity error0°, 2°, 5°; error 0Planar centre-of-gravity error 0/0.05/0.10 mInclination sensitivity and geometric-error reserve

All numerical values not established by the sources are parametric analysis inputs. The exploratory ranges are chosen to cover both stable and unstable outcomes; they are not confidence intervals for the machine, production tolerances or typical industry values.

The reference unloaded mass is 180+240+80+25=525 kg, increasing to 605 kg with the 80 kg workpiece. The unloaded condition still includes the 25 kg vacuum tool. The source documents do not define whether the 80 kg rating requires a deduction for separately added end tooling. This study therefore explicitly includes both an 80 kg workpiece and a 25 kg vacuum tool in the gravitational loading of the example. This mass combination is not a machine load chart.

Composite centre-of-gravity error is represented by a 0–100 mm translation along the outward normal of the edge being checked, distinct from the workpiece offset e relative to the end centre. The e=0.60 m value is based on half the maximum box length. However, the distance from the end rotation axis to the vacuum-tool contact centre is unknown, so 0.60 m is not a guaranteed upper bound on the actual total offset. The assumptions can be replaced in the accompanying input tables and scripts.

Plan view of outrigger feet and inset wheel support; side view of masses, gravity and horizontal force. All numerical geometry is a study input.
Figure 1 — Parametric base, support points and external force paths

Plan view of outrigger feet and inset wheel support; side view of masses, gravity and horizontal force. All numerical geometry is a study input. Select the figure to open it at full size.

The calculation first searches independent direction grids, then constructs an edge-normal envelope using the structure of rectangular supports, radially concentrated masses and bounded forces. It covers 1620 operating parameter combinations, 729 mass/height combinations, 27 support-span combinations and 72 transfer contact states. Directional verification includes a further 504576 combinations. Continuous-direction optimisation checks whether the grid misses the reference worst cases; the results and tolerances are recorded separately.

Mechanical model and derivation

The coordinate system lies in the contact plane. Its origin is the column projection, +x points nominally forwards, the ballast lies towards -x, and +z is normal to the contact plane. Arm azimuth φ, downhill direction β and geographical horizontal operating-force azimuth α are measured counterclockwise from +x. The support-plane inclination is θ. All point coordinates and heights are given in this system. Non-coplanar wheel and foot contacts after actual levelling require a separate measured three-dimensional contact model.

M=∑imi,rG=∑imiriM(1)

m_i is measured in kg and r_i in m. The mass terms represent the chassis/column, ballast, arm, vacuum tool and workpiece.

ra,xy=0.45Ruϕ,rt,xy=Ruϕ,rp,xy=(R+e)uϕ(2)

uφ=(cosφ,sinφ). The factor 0.45 is the assumed equivalent centre-of-mass ratio; e is the radial workpiece offset relative to the end centre.

Gravity has both a normal component and a downslope component. To avoid treating a horizontal force as a force along the slope, the calculation resolves the true geographical horizontal force H into the contact-plane coordinate system. It generally has an upward normal component in the inclined frame, so the total reaction also changes. The force application point is the operating end (Ruφ,1.20 m) during work and the front of the chassis (0.65 m,0,1.00 m) during unloaded pushing.

fg,i=mig[sinθdβ−cosθ],dβ=(cosβ,sinβ)(3)

g=9.81 m/s². The first two components form the in-plane vector; the final component is normal to the contact plane.

Hxy=H[cos(α−β)cosθdβ+sin(α−β)sβ],Hz=Hcos(α−β)sinθ(4)

sβ=(-sinβ,cosβ). H is measured in N. Angles are converted from degrees to radians before evaluation of trigonometric functions.

F=∑ifg,i+H,τ=∑iri×fg,i+rH×H,N=−Fz(5)

F and N are measured in N, and τ in N·m. N must be positive; tangential forces also require equilibrium through ground friction or locking mechanisms.

The resultant reaction point q in the contact plane follows from pitch and roll moment equilibrium. It is not simply the geometric projection of the centre of gravity without external operating forces. With no operating force, the expression reduces to the centre-of-gravity projection plus height multiplied by the tangent of the inclination. On level ground, θ=0 and H=0 give q=rG,xy, providing the most basic limiting-case check.

qx=τyN,qy=−τxN,(H=0): q=rG,xy+zGtanθdβ(6)

q is measured in m. Under the coplanar-support and quasistatic assumptions, it represents the required centre of pressure.

Active contact points define the convex hull P. Its jth edge is written using the outward normal as nj·r≤bj. The signed edge distance dj and corresponding moment reserve ΔMj are then defined. A positive dj indicates geometric reserve at that edge; dj=0 is the limit, and dj<0 means that non-negative normal contact reactions cannot support the state. Neither dj nor a simple restoring-to-overturning ratio is described here as a rated safety factor.

P=conv{pk:active contact},dj=bj−nj·q,dmin=minjdj,ΔMj=Ndj(7)

nj is a unit outward normal; bj and dj are measured in m, and ΔMj in N·m. The model uses contact centre points and does not include finite footpad area.

∑kNk=N,∑kxkNk=Nqx,∑kykNk=Nqy,Nk≥0(8)

Nk is the normal reaction at each foot or wheel. Four contacts provide only three overall equilibrium equations, so the distribution is not unique. Dividing total mass by 4 does not establish the actual load on each wheel.

A q inside the convex hull establishes only that a non-negative reaction combination exists. It does not prove that all four feet are firmly loaded or that no foot is overloaded. Tyre compliance, chassis torsion, floor unevenness and screw adjustment affect the actual distribution. Linear programming checks the existence of reactions, and an equal-stiffness example is provided separately. These reactions do not replace measured contact stiffness or weighing data. Other mobile-manipulator research also emphasises normal wheel loads and loss of contact.[7]

If the mounting axes of four swivel casters are at (±ac,±bc), and each wheel–floor contact varies within offset radius t, the actual support boundary must follow wheel orientation. To avoid assuming those orientations, this study uses (|x|≤ac−t, |y|≤bc−t) as a conservative core. In any direction, the support function is at least the mounting-rectangle support function minus t, while the core has a smaller support function. It is therefore contained in the convex hull for every wheel orientation when all four wheels are active contacts. This result does not apply when a wheel is missing or carries no reaction.

Pc,core={(x,y):|x|≤ac−t, |y|≤bc−t},ac>t, bc>t(9)

The reference values ac=0.65 m, bc=0.50 m and t=0.08 m give a core span of 1.14 m × 0.84 m. This is a conservative construction, not a set of coordinates simultaneously occupied by all wheels.

For the case where the arm, downhill direction and horizontal force all point along an edge outward normal n, let si=n·ri,xy and sH=n·rH,xy. The edge moment can be found directly by summing each load multiplied by its moment arm about the tipping axis. This scalar expression is used for the independent recalculation. Ballast inside the edge still contributes a positive restoring term. However, when the arm turns rearwards, rear ballast has a shorter effective moment arm than centrally located ballast; the forward-facing illustration in which ballast always opposes the load no longer describes the situation.

ΔM=g∑imi[(b−si)cosθ−zisinθ]−H[hcosθ+(b−sH)sinθ](10)

ΔM=0 defines zero margin for the given parameter combination. The independent recalculation does not call the vector cross-product function.

Hcrit=g∑imi[(b−si)cosθ−zisinθ]hcosθ+(b−sH)sinθ(11)

This expression applies only when the denominator is positive and the associated edge controls. The final threshold is the first reached among all edges. Hcrit is not a permissible operating force.

Δdj=−MgcosθNδj,δj,crit=NdjMgcosθ(12)

δj is the shift of the composite mass point along the outward normal to the edge; the force application point remains fixed. Because the horizontal external force affects the normal reaction, the relation cannot simply be written as Δd=−δ.

Preventing overturning and preventing sliding are separate constraints. The available tangential holding forces at all contacts must balance the resultant external tangential force. Whether parking wheel locks supply sufficient holding force also depends on tyre/floor friction, wheel loading and the actual mechanism ratings. Wheel-rotation locking, swivel locking and braking for deceleration are distinct functions.[6] None of them enlarges the support convex hull.

Treq=‖Fxy‖,μreq=TreqN,∑kmin(Bk,μkNk)≥Treq(13)

Bk is the available tangential braking force at each controlled contact; N is measured in N and μ is dimensionless. This summed condition is only necessary for overall tangential equilibrium. Yaw-moment equilibrium and individual-wheel constraints still require checks.

Numerical examples and results

In the reference operating case, the worst azimuth is φ=180°, with the arm extended towards the rear ballast. Total mass is 605 kg, and the composite centre of gravity is xG=−0.677686 m, yG≈0, zG=0.755372 m. The rear edge of the four-foot support lies at x=−0.85 m. A maximum-forward-reach illustration therefore does not cover all risks: the load, arm and fixed rear mass together approach the rear edge.

Table 4 — Reference foot-supported operating results
Study slopeWorst φ/β/αEdge margin (mm)Moment reserve (N·m)Total normal reaction (N)Required holding force (N)
0°180°/180°/180°131.9782.695935.05200.00
2°180°/180°/180°107.0633.785924.45407.01
5°180°/180°/180°69.4409.035895.03716.51

Fixed study conditions: R=2.00 m, workpiece mass 80 kg, e=0.25 m, H=200 N, and a four-foot span of 1.70 m × 1.40 m.

At 0°, gravity provides an edge restoring-moment reserve of 1022.6925 N·m. The 200 N operating force at a height of 1.20 m produces an adverse moment of 240 N·m, leaving a net reserve of 782.6925 N·m. Division by 5935.05 N gives 131.876 mm. At 5°, both the downslope moments due to component heights and the normal component of the geographical horizontal force must be included. Moving the level-ground centre-of-gravity projection downslope while retaining the original total reaction is insufficient.

Slope and horizontal-force directions are searched independently at every arm azimuth. Rearward extension at 180 degrees controls the reference case.
Figure 2 — Arm azimuth and worst-case stability margin

Slope and horizontal-force directions are searched independently at every arm azimuth. Rearward extension at 180 degrees controls the reference case. Select the figure to open it at full size.

Panels show study slopes of 0, 2 and 5 degrees. Black lines indicate zero margin; the 2 m and 80 kg dotted lines do not redefine rated capacity.
Figure 3 — Workpiece mass, end-centre radius and zero-margin curves

Panels show study slopes of 0, 2 and 5 degrees. Black lines indicate zero margin; the 2 m and 80 kg dotted lines do not redefine rated capacity. Select the figure to open it at full size.

To show the boundary shape, Figure 3 extends the mathematical plotting range to R=0.50–2.80 m and workpiece mass 0–140 kg, using 27000 data points. In Figure 6, the ballast curves extend to 0–500 kg and the centre-of-gravity error curves to 0–150 mm. These extensions serve only to illustrate zero-margin boundaries and sensitivity. They are outside the original 80 kg, 2 m operating range and do not establish that these mechanism configurations are reachable.

Table 5 — Critical conditions for the reference foot-supported case
Study slopeHcrit (N)Critical workpiece mass (kg)Rcrit (m)Critical CG error (mm)Critical minimum ballast (kg)
0°852.2137.02.566131.9101.4
2°746.8124.82.461106.9121.4
5°573.5107.82.30169.2152.4

Each column varies only the stated variable, holding the others at their reference values and taking the worst direction. Zero margin is not a design target. Critical masses or radii above the original 80 kg/2 m limits do not permit an extension of the operating range. The ballast threshold applies only to the assumed base and component masses.

At a study slope of 5°, the reference case has only 69.2 mm of composite centre-of-gravity error reserve. An adverse error of 100 mm crosses zero margin. Statements such as “equipped with a ballast box” or “rated at 80 kg” therefore cannot replace missing data. Increasing the workpiece offset from the end axis, raising the centre of gravity or narrowing the foot span consumes the same reserve.

The unloaded-travel case fixes workpiece mass at 0 kg and stows the arm at R=0.35 m and φ=0°. Assumed arm and vacuum-tool heights fall to 1.20 m and 0.80 m respectively, while total unloaded mass remains 525 kg. The composite centre of gravity is (−0.165048,0,0.558095) m. The four caster mounting axes span 1.30 m × 1.00 m; allowing an 80 mm offset gives a conservative support core of 1.14 m × 0.84 m.

Table 6 — Unloaded, stowed caster-mode results
Study slopeEdge margin (mm)Required holding force (N)μreqHcrit (N)
0°366.1200.00.0392085.6
2°345.4379.60.0741904.1
5°314.2648.10.1271657.2

H=200 N, applied at a height of 1.00 m. Required holding force is the total demand under the corresponding static or equivalent disturbance condition, not measured parking capacity.

The left panel varies horizontal force and the right panel varies caster offset. Both assume four active wheel contacts and a stowed arm.
Figure 4 — Unloaded-travel sensitivity to horizontal force and swivel-caster offset

The left panel varies horizontal force and the right panel varies caster offset. Both assume four active wheel contacts and a stowed arm. Select the figure to open it at full size.

The unloaded 5° case has a geometric margin of 314.2 mm but requires a total tangential holding force of 648.1 N and an equivalent friction ratio of 0.127. With μ=0.10 as a sensitivity case, the tangential condition is already unsatisfied even though the geometric resistance to overturning remains positive. Braking and stability therefore cannot be combined into a single “safe” judgement. Values of μ=0.20 or 0.40 improve only the assumed friction capacity; they still do not establish the actual brake rating.

To illustrate unloaded deceleration, adverse equivalent in-plane inertial disturbances corresponding to 0, 0.3 and 0.6 m/s² are applied at the total centre of gravity. At 5° and H=200 N, the margin decreases from 314.2 mm to 279.8 mm. This example includes rigid-body translation only. It excludes threshold impacts, arm swing, lateral acceleration during turning and caster-fork elasticity, and cannot establish travel speed or braking distance.

Support transfer is represented by substituting wheels for feet at the four corners, enumerating 16 corner combinations. A further 8 states cover loss of one effective foot or wheel contact. Each state is evaluated at 0°, 2° and 5°. When all four corners remain load-bearing, all 16 mixed convex hulls contain at least the conservative four-caster core. The practical risk arises when a corner has not yet contacted the floor, is lifted prematurely, sinks into the floor or loses contact through excessive adjustment, leaving triangular support.

Table 7 — Minimum margins during support transfer
Study slopeAll four corners active / 16 states (mm)One foot absent / 4 states (mm)One caster absent / 4 states (mm)
0°366.1-143.8-136.7
2°345.4-164.0-157.0
5°314.2-194.6-187.5

All cases are unloaded and stowed, with H=200 N. Missing-corner models represent adverse study states, not permissible machine transfer steps.

At left, the unloaded centre of gravity with H=0 crosses the diagonal edge when a rear corner is absent. At right, the worst transfer states are compared at H=200 N.
Figure 5 — Contact-state transfer and instability with three-point support

At left, the unloaded centre of gravity with H=0 crosses the diagonal edge when a rear corner is absent. At right, the worst transfer states are compared at H=200 N. Select the figure to open it at full size.

On level ground, the worst margin with an adverse caster corner missing is already -136.7 mm. Adding ballast does not automatically resolve this geometric problem: rear ballast moves the unloaded centre of gravity rearwards and can place it outside the remaining three-point convex hull. If only two diagonal contacts remain, the hull degenerates to a line segment with no positive two-dimensional margin; this model rejects it as a stable support for operation.

Parameter sensitivity and engineering discussion

With the reference base, masses and heights fixed, the 1620 operating scans give minimum margins ranging from -96.0 to 528.1 mm. Negative values show that the structural description in the original proposal is insufficient to determine a unique overturning result. The 729 mass/height combinations range from -215.9 to 257.4 mm. These ranges cannot be interpreted as machine reliability or failure rates because the inputs have no assigned probability distributions.

Arm azimuth, ballast position and foot span must be designed together. For fixed rear ballast, adding mass generally increases restoring moments at all edges, but its moment arm per unit mass about the rear edge is only b−0.45 m. Moving the same ballast towards the centre improves the worst direction over the full azimuth range, but may reduce its benefit for dedicated forward-facing operation. If operation is restricted to a validated sector, optimisation can address that sector. The full-azimuth search here identifies risks; it does not claim that the machine has full-circle rotation capability.

The left panel compares minimum margins over all azimuths for different ballast positions. The right panel shows adverse centre-of-gravity error consuming the remaining reserve.
Figure 6 — Effects of ballast position and composite centre-of-gravity error

The left panel compares minimum margins over all azimuths for different ballast positions. The right panel shows adverse centre-of-gravity error consuming the remaining reserve. Select the figure to open it at full size.

Individual wheel or foot loading cannot be assessed solely by averaging the total weight. The Blickle manufacturer guide starts caster selection by dividing equipment mass plus additional load by the effective number of load-bearing wheels, then applying an application factor.[5] For an eccentric mobile manipulator, this is only a starting point. Load distribution, effective wheel count, speed, surface and impact conditions still require checks. For the study unloaded mass of 525 kg, the four-wheel average is 131.25 kg per wheel; with only three effective wheels it is already 175 kg per wheel. The actual maximum wheel load is also governed by moments.

Table 8 — Feasible reaction ranges and equal-stiffness examples at 5°
Mode / contactFeasible normal force (N)Equal-stiffness example (N)
Foot P12706.9–2947.52827.2
Foot P20.0–240.6120.3
Foot P30.0–240.6120.3
Foot P42706.9–2947.52827.2
Caster core P11147.3–2556.61851.9
Caster core P20.0–1409.3704.7
Caster core P30.0–1409.3704.7
Caster core P41147.3–2556.61851.9

Contact points are ordered as (-a,-b), (+a,-b), (+a,+b), (-a,+b). The ranges follow from equilibrium and Nk≥0. Individual upper and lower bounds cannot be combined arbitrarily. Caster values are comparisons from the conservative-core model; caster selection must use actual contacts and stiffnesses.

A reaction range that includes zero reflects the static indeterminacy of four-point support; it does not permit a contact to be ignored during operation. Equal-stiffness results illustrate load concentration and are not measured distributions for an unknown chassis. The actual structure also requires checks of footpad/floor contact pressure, maximum screw extension and buckling, outrigger bending moments, chassis torsion and caster-fork fasteners. Floor failure or settlement of one foot changes the convex hull and invalidates the model boundary conditions.

The foot-length difference needed for levelling depends on floor slope and the horizontal projected span. For horizontal half-spans a and b of the working foot layout and ground-slope direction βg, the maximum height difference among the four feet is 2tanθg(a|cosβg|+b|sinβg|). The maximum over all slope directions is 2√(a²+b²)tanθg. Here θg is the ground slope, distinct from the residual inclination θ of the earlier unlevelled coplanar model.

Δℓreq=2tanθg(a|cosβg|+b|sinβg|),maxβgΔℓreq=2a2+b2tanθg(14)

a and b are the horizontal projected half-spans of the feet after levelling. Δℓ is the maximum foot-length difference. Wheel clearance, local floor unevenness and installation-height differences must also be allowed for.

Table 9 — Differential foot travel required for parametric levelling
Study floor slopeAcross 1.70 m (mm)Across 1.40 m (mm)Worst slope direction (mm)
0°0.00.00.0
2°59.448.976.9
5°148.7122.5192.7

These values are not the actual foot adjustment range. The source documents do not specify effective screw travel, minimum thread engagement, footpad articulation or load capacity at maximum extension.

The 2° and 5° values are study floor inclinations only. Actual foot length and load-capacity validation determine whether levelling is possible.
Figure 7 — Geometric demand for differential levelling travel

The 2° and 5° values are study floor inclinations only. Actual foot length and load-capacity validation determine whether levelling is possible. Select the figure to open it at full size.

Even adequate differential travel addresses only chassis attitude. Footpads must still conform to the floor, all four feet must develop verifiable reactions, and support continuity must be maintained during wheel/foot transfer. Excessively extending one low-side foot to obtain a level appearance cannot justify neglecting screw buckling, thread engagement or lateral loading. A caster lock does not establish deceleration-braking capability. Controlled stopping on an incline cannot be inferred from the words “fitted with brakes”.

Table 10 — Engineering operating limits and model implications
StageApplicable original operating limitsChecks identified by the study
OperationSupport and level on all four feet; handle within the rated loadActual support span, four loaded corners, workpiece CG offset, worst arm configuration and floor capacity
Preparation for travelSet the box down securely and release it; stow the armActual stowed CG and height, tool restraint, air-line connection/disconnection state and continuous contact during transfer
Feet to castersRetract feet only when unloadedEstablish effective four-wheel support before removing the corresponding foot reactions; no unsupported-corner path
Pushing and turningLevel, step-free route; hold the towing handleChanging wheel orientation, actual maximum wheel load, starting force, deceleration capability and floor friction; do not derive speed from the example
Casters to feetRe-establish support and levelling after positioningTransfer load gradually to the feet; avoid excessive adjustment lifting another corner; extend the arm and take a load only after stability is confirmed
Multiple workstationsRe-establish support conditions at every positionEvaluate each floor and space separately; a satisfactory support state at one station does not establish suitability at the next
Loaded travelThe original proposal prohibits travel while holding a box by vacuumAny change of use requires separately defined design capacity, a load chart, and dynamic and braking tests; this study gives no authorisation

Conclusions and validation methods

  1. The original proposal establishes foot-supported operation and unloaded travel with the arm stowed. An 80 kg rating, a 2 m working radius and a ballast box do not uniquely determine base stability. Masses, centres of gravity and active contact coordinates must enter the calculation separately.
  2. The reference foot-supported case gives minimum geometric margins of 131.9, 107.0 and 69.4 mm at study slopes of 0°, 2° and 5°. Rearward arm extension controls, showing that rear ballast must be assessed with the entire operating-azimuth envelope.
  3. At 5°, the critical composite centre-of-gravity error is 69.2 mm. Uncertainty in the original inputs can change the sign of the result. A critical value denotes zero margin, not an authorised operating condition.
  4. The unloaded, stowed four-wheel model retains a geometric margin of 314.2 mm at 5°, but requires a total holding force of 648.1 N. Braking, resistance to sliding and resistance to overturning must each be satisfied and cannot substitute for one another.
  5. Support transfer is a separate hazardous state: loss of an adverse caster corner already gives a negative margin of -136.7 mm on level ground. Positive results at the operating and travel end states do not establish stability through the transfer.
  6. Required differential levelling travel, individual-foot capacity and structural capacity at extension must be checked together. The study values of 2° and 5° do not increase the machine’s permissible slope, and the calculations do not authorise loaded travel.

The study completed vector external-moment and independent scalar-moment recalculations, gravity-projection limiting-case checks at 0/2/5°, sign checks on both sides of critical-force roots, continuous-direction optimisation, linear-programming contact-feasibility checks for 72 transfer states, and conservative-core containment checks for 1000 random wheel-orientation sets. These are completed computational validations. No prototype inclination, push/pull, braking or support-transfer tests were performed.

Physical validation should follow the evidence chain below. Suitably qualified engineers must design the test loads, controls and stopping criteria. This report does not instruct the user to tip the machine over. Loading must stop when contact reactions approach the preset threshold or when lift-off, sliding or chassis deformation occurs.

  1. Use valid assembly drawings to establish chassis, foot and wheel–floor contact coordinates. Record swivel offsets and locking types, and check travel, minimum thread engagement and extended-load capacity for all four feet.
  2. Weigh the machine and each addition, maintaining separate definitions for workpiece, tooling and ballast. Install calibrated weighing devices at the feet and infer the planar centre of gravity from level-ground reactions over actual working configurations. Determine centre-of-gravity height from controlled small-angle attitude changes or a three-dimensional model with verified masses.
  3. Replace the study values with actual box masses and centre-of-gravity offsets. Check minimum reaction, floor pressure and structural capacity point by point within the working radius and approved operating sector. Specify a suitable engineering reserve for geometric edge margin.
  4. With the machine unloaded and the arm restrained, record wheel and foot reactions at each transfer stage. Confirm that no corner is unloaded before its replacement contact is established. Include routes, doorways, turns and floor joints in the contact-state assessment.
  5. Measure starting, rolling, stopping and parking holding forces separately. Distinguish wheel locks, swivel locks and deceleration braking, and check braking and sliding resistance for actual wheel orientations and floor conditions.
  6. After documented physical validation, define the permitted configurations, loads, floor conditions and travel conditions for the specific machine. The parametric thresholds in this study must not be used directly as equipment labels.

Unresolved physical-machine limitations: The available information does not provide the chassis/contact-point dimension chain, component masses and centres of gravity, caster models and braking forces, effective foot travel and capacity, or floor and dynamic tests. The calculation package provides reproducible research, not engineering release or certification of the machine.

References

  1. 80 kg Mobile Vacuum Pneumatic Assist Manipulator for Large Packaging Boxes — Technical Proposal. AUREK-XT-20261010-01; 2026-10-10. Relevant pages: 4,6–9. (Chinese source.)
  2. 80 kg Mobile Vacuum Pneumatic Assist Manipulator for Large Packaging Boxes — Configuration Document. AUREK-XT-20261010-01; cover 2026-08-15. Relevant pages: 4–7. (Chinese source.)
  3. ISO 12100:2010, Safety of machinery — General principles for design — Risk assessment and risk reduction. Edition 1, November 2010; confirmed 2022. Source
  4. HSE. Safe use of lifting equipment. L113. Second edition 2014, amendments 2018. Relevant pages: 23–25, paragraphs 93–107. Source
  5. Blickle. A few steps to the optimal product. Manufacturer online guide, no stated publication date. Source
  6. Blickle. Versions / options — Wheel and swivel head brake. Manufacturer online guide, no stated publication date. Source
  7. Petrović, G. R.; Mattila, J. Analytic Solutions for Wheeled Mobile Manipulator Supporting Forces. IEEE Access, 10 (2022), 43235-43255; author version v2 dated 21 April 2022. DOI: 10.1109/ACCESS.2022.3169766. The publicly available author version was used to check the method and scope. Source

Appendix A — Reproduction and data index

The research package uses Python, NumPy, SciPy and Matplotlib. Run make_inputs.py, run_analysis.py, validate.py and build_report.py in that order to establish the input register, run parameter scans and generate figures, perform independent recalculations, and generate the full text. Scripts locate the research root relative to their own paths; the public text does not depend on machine-specific absolute paths. The source-verification script extract_sources.py reads the original files only; their paths are kept separately in the internal evidence register.

Table 11 — Reproducible data files
FileContents
inputs.json23 study inputs, evidence categories, mass definitions and applicable conditions
results/baseline.json24 reference mode/slope/horizontal-force cases and directional-grid differences
results/operating_scan.csv1620 radius, workpiece-mass, offset, horizontal-force, slope and CG-error combinations
results/mass_height_scan.csv729 component-mass and height variations
results/support_geometry_scan.csv27 support-span variations
results/transition_states.json72 active-contact states
results/critical_conditions.jsonZero-margin critical values for individual variables
results/ballast_scan.csv204 ballast-mass and position combinations
results/caster_trail_scan.csv12 caster-offset and slope combinations
results/reactions.jsonNormal-reaction ranges and equal-stiffness examples
results/inertial_sensitivity.json9 unloaded translational-inertia disturbances
validation.jsonCompleted calculation checks, errors and checks not performed

All figures are generated with standard plotting software and supplied as PNG and SVG. Coordinates, curves, tables and abstracts use the same result files. Equations are stored as LaTeX in the report JSON for conversion to native editable equations during consistent document layout.

Downloads

The full article on this page is in English. The downloadable PDF and DOCX reports are in Chinese and include an English abstract.

Read the complete Chinese web article

Need documents or a proposal tailored to your operating conditions?

For documents, drawings or a selection proposal specific to your workpiece and site conditions, share the workpiece and workstation details and an engineer will contact you directly.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.