PDF・Wordの本文は中国語で、英語の要旨を含みます。
要旨
本研究では、資料で確認した設計条件とパラメトリック解析の仮定を区別しています。計算結果は実機検証に代わるものではありません。以下の英語要旨に結果と適用限界を示します。
A reproducible CAD review workflow is developed for fixture mass, solid interference, nominal contact and sampled motion. Six candidates were screened. The selected inputs are a fixed vacuum frame (A), a cylindrical-gripper assembly snapshot (B), and an existing conceptual side-clamping/tilting design (C), containing 467 valid solids in total. Versioned STEP copies, hashes, units and assembly occurrences are retained. B-representation volume integration and Boolean common operations identify 154, 8 and 85 positive-volume overlap pairs at a reporting threshold of 0.001 mm³. These counts include simplified mating representations and are not defect counts. In C, a 180 mm opening adds 12 overlap pairs relative to the 152.4 mm baseline; at 90° tilt, six cross-motion-group overlaps occur, with a maximum pair volume of 74,592 mm³. Four planar pads give 960 mm² of nominal CAD contact. Tangent curved interfaces in A and B demonstrate that zero gap does not imply finite load-bearing contact area. The 29.200 kg estimate for C covers fabricated geometry only under the original density assumptions. Analytical checks, tetrahedral mesh integration and archived endpoint comparisons support the numerical findings. The results do not establish structural capacity, grip retention or safety certification.
Keywords: fixture; CAD; mass and centroid; solid interference; nominal contact; motion collision
中国語の全文
PDF・Wordの本文は中国語で、英語の要旨を含みます。

