PDF와 Word 보고서의 본문은 중국어이며 영문 초록이 포함됩니다.
초록
본 연구는 자료로 확인된 설계 조건과 매개변수 해석의 가정을 구분합니다. 계산 결과는 해당 장비의 실물 검증을 대신하지 않습니다. 아래 영문 초록에 결과와 적용 한계를 제시합니다.
This study uses a dual-swing-jaw barrel clamp proposal with a rated working load of 310 kg and a stated diameter range of 310–620 mm as a structural reference. It derives the complete load path from cylinder chamber pressures to hinge moment, per-side closing resultant, contact-normal forces and vertical holding capacity. The source drawings establish the topology but do not establish cylinder size, production pivot coordinates, liner properties or allowable barrel-wall pressure. Numerical results therefore belong to an explicitly defined parametric model. For a 160 mm bore, a nominal chamber pressure of 0.625 MPa, cylinder force factor 0.90, linkage efficiency 0.95, workpiece mass 310 kg, upward acceleration 0.25g and friction coefficient 0.40, the flat-contact model produces 6.638–7.597 kN total scalar normal force and friction margins of 0.699–0.800. An ideal self-aligning 90-degree V model produces 9.884–12.463 kN and margins of 1.040–1.312. The 400 and 500 mm cases are research interpolation points between the documented endpoints. Pressure and friction scans reveal coupled slip and wall-pressure limits. Bottom support is evaluated through support reactions, eccentric bending and engagement, rather than a friction safety factor. Its illustrative toe-bending margin is 1.263; complete structural capacity remains unverified. The report supplies reproducible calculations and an original-part verification procedure without claiming equipment certification.
Keywords: barrel clamp; cylinder transmission; contact normal force; frictional holding; barrel-wall pressure; bottom support
중국어 전문
PDF와 Word 보고서의 본문은 중국어이며 영문 초록이 포함됩니다.

