PDF・Wordの本文は中国語で、英語の要旨を含みます。
要旨
本研究では、資料で確認した設計条件とパラメトリック解析の仮定を区別しています。計算結果は実機検証に代わるものではありません。以下の英語要旨に結果と適用限界を示します。
This study uses a dual-swing-jaw barrel clamp proposal with a rated working load of 310 kg and a stated diameter range of 310–620 mm as a structural reference. It derives the complete load path from cylinder chamber pressures to hinge moment, per-side closing resultant, contact-normal forces and vertical holding capacity. The source drawings establish the topology but do not establish cylinder size, production pivot coordinates, liner properties or allowable barrel-wall pressure. Numerical results therefore belong to an explicitly defined parametric model. For a 160 mm bore, a nominal chamber pressure of 0.625 MPa, cylinder force factor 0.90, linkage efficiency 0.95, workpiece mass 310 kg, upward acceleration 0.25g and friction coefficient 0.40, the flat-contact model produces 6.638–7.597 kN total scalar normal force and friction margins of 0.699–0.800. An ideal self-aligning 90-degree V model produces 9.884–12.463 kN and margins of 1.040–1.312. The 400 and 500 mm cases are research interpolation points between the documented endpoints. Pressure and friction scans reveal coupled slip and wall-pressure limits. Bottom support is evaluated through support reactions, eccentric bending and engagement, rather than a friction safety factor. Its illustrative toe-bending margin is 1.263; complete structural capacity remains unverified. The report supplies reproducible calculations and an original-part verification procedure without claiming equipment certification.
Keywords: barrel clamp; cylinder transmission; contact normal force; frictional holding; barrel-wall pressure; bottom support
中国語の全文
PDF・Wordの本文は中国語で、英語の要旨を含みます。

