Maintenance and Troubleshooting · Downloadable

Daily Inspection Checklist for Pneumatic Industrial Manipulators

Use this form for pre-shift checks, periodic inspections and abnormality records. Enter inspection results and follow-up actions item by item to support shift handover and maintenance tracking.

AUREK-RC-MT-001VersionV1.0Updated2026-09-07

Maintenance and troubleshooting
Illustrative image of the topic; it does not show specific equipment or a customer site
← Back to resource catalog

Use this form for pre-start checks and abnormality records. Print it and keep it near the equipment, or include it in the team's inspection files. Link inspection results and abnormalities to the corresponding follow-up actions.

⚠ Safety notice:Before inspection, confirm that the workpiece is securely placed or unloaded. If you find unusual noise, loose structures, cracks, brake failure, tooling that will not release, or equipment rising or descending without a command, stop using the equipment immediately and contact the site supervisor or manufacturer. Unqualified personnel must not dismantle or modify pneumatic circuits, load-bearing structures or safety devices.

01Equipment and inspection information

01 Equipment and inspection information — data table
ItemDetails
Customer/Factory(fill in)
Equipment namePneumatic industrial manipulator / Pneumatic balancing hoist
Equipment number(fill in)
Installation station(fill in)
Inspection date___ year ___ month ___ day
Shift□ Morning □ Afternoon □ Night
Inspector(fill in)
Site supervisor(fill in)
Equipment status□ Normal □ Shut down □ Awaiting repair
Air-Supply Pressure___ MPa
Rated load___ kg
Tooling Type□ Jaws □ Vacuum □ Hook □ Internal-expansion tooling □ Other

02Pre-shift inspection items

Check each item before the first operation of every shift and record the results on the printed form.

02 Daily pre-start inspection list — data table
No.Inspection pointInspection detailsAcceptance criteriaResultAbnormalities / Corrective actions
01On-site environmentCheck whether there are people, obstacles, oil on the ground or debris within the working radius.The working area is clean, the passages are clear, and there is no obvious interference.□Passed □Abnormal □N/A
02Equipment appearanceInspect the column, main arm, secondary arm, brackets and covers for deformation, impact damage or abnormal wear.No obvious deformation, cracks, impact marks or abnormal wear.□Passed □Abnormal □N/A
03Base / Anchor fixingsCheck the base fit, anchor bolts, embedded parts or mobile base locking status.The base is stable; the bolts are not loose; the mobile base is locked reliably.□Passed □Abnormal □N/A
04Load-Bearing ConnectionsCheck the main load-bearing bolts, pins, circlips, cotter pins and connecting flanges.All connections are complete, with no looseness, missing parts or obvious wear.□Passed □Abnormal □N/A
05Rotary jointsPush the manipulator gently and check the rotation status of the main joint, middle joint, and front joint.Smooth rotation without binding, unusual noise, excessive movement or clearance.□Passed □Abnormal □N/A
06Joint brakesCheck that each joint brake and its button or knob function correctly.The braking response is normal and there is no obvious drift after locking.□Passed □Abnormal □N/A
07Lifting balanceTest lifting and lowering without a load, observing any uncommanded upward or downward movement or vibration.Stable unloaded balance and smooth lifting/lowering, with no abnormal sinking.□Passed □Abnormal □N/A
08Air-Supply PressureCheck the air-preparation assembly and pressure gauge for supply pressure and fluctuations.The pressure is stable and usually not lower than the equipment requirements; there are no abnormal fluctuations.□Passed □Abnormal □N/A
09Filter-regulatorCheck the filter cup for water accumulation, oil stains, cracks and drainage status.There is no excess water accumulation in the filter cup; there is no damage; drainage is completed when necessary.□Passed □Abnormal □N/A
10Air Tubing and FittingsInspect air hoses in moving areas for kinks, wear, bulging, leakage or disconnection.Hoses are intact, fittings are secure and no hose is pulled taut during movement.□Passed □Abnormal □N/A
11Control HandleCheck buttons, handles, knobs, markings and hose/tube retention.Buttons return normally, labels are clear and the operating handles are secure.□Passed □Abnormal □N/A
12Tooling connectionInspect the tooling connection flange, quick-change mechanism, lifting points, locating pins and fasteners.Tooling connections are secure, lifting points have no cracks and quick-change locking is reliable.□Passed □Abnormal □N/A
13Clamping / Vacuum / ReleaseTest gripping and release without a load. For vacuum tooling, inspect the suction cups, vacuum gauge and filter.Gripping and release complete correctly; cups are undamaged; vacuum builds and releases normally.□Passed □Abnormal □N/A
14Travel limits / Protection / Trial operationInspect travel limits, collision stops and retention structures, then complete an unloaded or low-load trial run.The limit is effective; there is no interference in the path; the action is stable and the operating position is safe.□Passed □Abnormal □N/A

03Weekly and monthly inspection items

The maintenance team or equipment supervisor should organize periodic inspections.

03 Weekly/monthly inspection recommendations — data table
IntervalInspection itemsInspection DetailsRecommended Action
WeeklyLoad-bearing bolts and welded areasInspect the main supports, arms, base and tooling connections for looseness, cracks or weld separation.If looseness is found, stop the equipment immediately and tighten the connection. If cracks or weld separation are found, stop using the equipment and contact the manufacturer.
WeeklyRotary joints and bearings/bushingsCheck whether the rotation is smooth and whether there is any abnormal noise, enlarged gap or eccentric wear.Record abnormal locations; arrange maintenance, adjustment or replacement of worn parts if necessary.
WeeklyAir hoses, cable carriers and moving cable bundlesCheck for tension, rubbing or kinking along the motion path, and for loose retaining clips.Secure the lines again with sufficient movement allowance. Replace damaged hoses or protective sleeves.
WeeklyTooling wear partsCheck whether the jaw pads, suction cups, hooks, positioning blocks, and anti-scratch pads are worn or aged.Replace the component when wear compromises gripping safety; never operate it in a degraded condition.
MonthlyBrakes and travel limitsCheck joint brakes, mechanical travel limits, collision stops, retaining pins and safety-function operation.Adjust or replace failed parts and confirm that locking and limiting are reliable.
MonthlyOverall balance and working envelopeCheck unloaded/loaded balance, working radius, lifting stroke and path interference.Reassess the design and tooling after workpiece or workstation changes.
MonthlyNameplates and warning signsCheck whether the rated load, operating instructions, and safety warnings are clear and complete.Replace missing or illegible labels to prevent operating errors.

04Abnormality handling and sign-off

Record any abnormality found, track the outcome of corrective action and obtain the responsible person's signature.

04 Exception records and signatures — data table
Date/ShiftAffected locationDescription of abnormalityTemporary measuresShutdown required?Performed by / Verified by
Inspection conclusion: □ Fit for normal use □ Use subject to observation □ Stopped pending corrective action □ Manufacturer / maintenance personnel notified
Inspector signature: ____ Team leader confirmation: ____ Maintenance confirmation: _____ Date: ____

Related resources

Open resource center
Maintenance and troubleshooting

AUREK-RC-ME-001Downloadable

Common Mechanical Faults and Corrective Actions

Match mechanical fault symptoms to checks of the arms, joints, brakes, base and tooling connections. Follow the investigation sequence and maintenance items, and identify conditions requiring manufacturer support.

Maintenance and troubleshootingVersion V1.0Updated 2026-09-07

Maintenance and troubleshooting

AUREK-RC-PN-001Downloadable

Common Pneumatic Faults and Corrective Actions

Use the symptom-to-check references for the air supply, piping, valves, cylinders and vacuum system, with pre-maintenance safety requirements and conditions requiring manufacturer support.

Maintenance and troubleshootingVersion V1.0Updated 2026-09-07

Operation and training

AUREK-RC-UM-001Downloadable

Pneumatic Industrial Manipulator Operating Manual

Operating requirements organized by equipment structure, installation and commissioning, operation, maintenance and troubleshooting, retaining project parameters and safety requirements for training and site reference.

Operation and trainingVersion V1.1Updated 2026-09-07

Need documents or a proposal tailored to your operating conditions?

For documents, drawings or a selection proposal specific to your workpiece and site conditions, share the workpiece and workstation details and an engineer will contact you directly.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.