Planning Manipulator Installation Positions: Key Checks to Avoid Interference

Plan the installation around pickup and placement points and the complete motion path. Check the dynamic space needed by the manipulator, tooling, workpiece, operators and nearby equipment, and reserve parking and maintenance positions.

AUREK-RC-AR-009VersionV1.0Updated2026-09-07Read about 8 minutes

Installation and acceptance
Illustrative image of the topic; it does not show specific equipment or a customer site
← Back to resource catalog
Key points of this article
  • Installation planning should consider workpiece arrival, gripping, transfer, placement, operator access and equipment maintenance together.
  • Core elements: pick-up/placement points, working radius, lifting stroke, rotation range, fixture size, personnel positions, passages and maintenance space.
  • Draw the complete motion path before choosing the fixing point. Include equipment outlines, door-opening envelopes, access routes and service space in the clearance requirements.
  • Determine installation dimensions from site measurements and design drawings.

Installation position affects the working envelope and operating posture for pneumatic industrial manipulators, pneumatic balancing hoists, vacuum lifters and their tooling. Use site measurements and design drawings to check equipment placement together with the complete handling sequence.

01How location affects operation and clearance

An excessively distant pickup point may cause overreaching; a placement point too close to the equipment may restrict slewing; proximity to equipment doors or aisles may obstruct maintenance or access. Check reachability, operating posture and clearance at every motion position. Include the overall dimensions, gripping orientation and parking envelope of custom tooling.

02Installation planning inputs

Pickup and placement points

Mark pickup locations such as bins, pallets, conveyors, material carts or equipment outlets, and placement locations such as fixtures, machine tools, assembly benches or the next workstation. Record the height, direction, changes in centre of gravity and orientation requirements at each point, and check that the equipment can perform the actual motions.

Working radius

The working radius must cover the required pickup and placement points and intermediate orientation-adjustment areas. Insufficient radius restricts movement, while excessive radius may increase footprint and interference. Select it against the complete path.

Lifting stroke

Lifting stroke must cover the heights needed to clear bins, pass over fixtures, enter equipment and place the workpiece. Include tooling height, lifting-point position, turning space and operator sightlines as well as workpiece height. For machine loading, also check the opening and internal clearances.

Rotation range

Simulate slewing through pickup, movement, obstacle clearance, placement and return, checking machine enclosures, control cabinets, fences, racks, utility lines and operator positions. Check the actual swept envelope, rather than recording only the maximum slewing angle.

Tooling dimensions and orientation

Include the outlines of suction cups, jaws, wrap-around clamps or turning mechanisms in the layout. Check the space required during approach, gripping, orientation changes and parking separately. Determine the tooling parking position together with the equipment fixing point.

Operator position

The operating position should allow a natural stance, a clear view of the workpiece and convenient handle control. If the main motions require detours, sideways posture, stepping over utility lines or frequent backward steps, adjust the fixing point or pickup/placement layout.

Access routes and maintenance space

Keep pedestrian and material-flow routes clear during movement, equipment parking, tooling storage and temporary load holding. Reserve access to air lines, control valves, travel limits, bearings, column fixings and tooling for maintenance.

03Dynamic interference checks

  • Draw the motion path before selecting the fixing point: check the manipulator, tooling and workpiece envelopes segment by segment through lifting, translation, rotation, lowering, positioning and return.
  • Equipment clearances: keep the motion path clear of enclosures, open doors, service openings, emergency-stop controls, electrical cabinets and material inlets/outlets.
  • Plan tooling parking: mark the parked position and check whether the tooling occupies space above an access route or obstructs bin replacement or equipment inspection.
  • Service lines and headroom: avoid tension, entanglement and crushing of air hoses, vacuum lines and cables. For suspended or rail-mounted systems, check overhead beams, lighting, ducts and cable trays.
  • Allow room for adjustment: check positional margins against known workstation changes and avoid placing routine operations at the limits of the equipment's reach.

04Installation location checklist

04 Installation location checklist — data table
Inspection ItemRequired checksCommon risksRecommended practices
Pickup pointBin, pallet, conveyor or equipment-outlet locationExcessive reach and operating effortConfirm the coverage based on the actual picking action
Placement pointFixture, machine, assembly bench or next stationInaccurate placement and difficult positioningPlan the path based on the workpiece posture and placement height
Working radiusCoverage of pickup, placement and intermediate movementsInsufficient radius or excessive range causes interferenceDetermine the reasonable radius based on the actual movement path
Lifting strokeWorkpiece, fixture and equipment height relationshipsWorkpieces cannot pass over tooling or enter equipmentVerify site measurements against design drawings
Rotation rangeClearance throughout rotationCollision with equipment, guards, racks or peopleDo dynamic range simulations and set limits if necessary
Tooling dimensionsCustom-tooling outline, gripping method and orientationFixture collides with workpiece, equipment or tableIncorporate fixture dimensions into overall workstation layout
Operator positionsOperator standing, observation and control positionAwkward posture or entry into hazardous areasEnsure that personnel have a natural and safe operating space
Aisle safetyClearance of pedestrian, material-flow and maintenance routesAffecting traffic or material turnoverReserve safe passages and equipment parking areas
Equipment interferenceRelationship with equipment doors, control cabinets, and inspection openingsAffecting door opening, maintenance or equipment operationUse equipment envelopes as mandatory layout constraints
Maintenance accessAccess to tooling, circuits, controls and mounting pointsDifficult to maintain and inconvenient to adjustReserve space for maintenance and replacement
Planning an installation location? Share a site plan, workpiece dimensions and weight, pickup and placement locations, and aisle widths. AUREK can assess the position and interference.
View selection guide

Common questions

Can a manipulator be installed directly beside a machine?

Use measured equipment envelopes, door movements, handling paths, operator positions and access routes to select the location. Visual estimates alone may miss interference.

Is a larger working radius always better?

No. Select sufficient reach for the complete handling path. Excessive radius increases the swept area, occupies more space and may create new interference.

Is lifting stroke determined only by workpiece height?

Include tooling height, lifting-point location, machine-opening height, receiving-fixture height and orientation changes as well as workpiece height. Check each site measurement against the design drawings.

Does installation location affect operator efficiency?

Yes. An unsuitable position can force detours, sideways operation, excessive reaching or repeated orientation adjustments. Plan the main movements around a natural operating stance.

Can a manipulator be added to an established line?

Assess existing equipment, aisles, workpiece flow, foundations, air supply and maintenance access to determine whether a manipulator or another handling system fits the line.

Related resources

Open resource center

Need documents or a proposal tailored to your operating conditions?

For documents, drawings or a selection proposal specific to your workpiece and site conditions, share the workpiece and workstation details and an engineer will contact you directly.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.