Handling Requirements Collection Form

Use standardized fields to collect workpiece, motion, cycle-time, installation, utility, environmental and tooling requirements for quotation preparation and initial engineering assessment. Record multiple workpieces and pick-and-place positions separately.

AUREK-RC-RFQ-001VersionV1.0Updated2026-09-07

Selection and solutions
Illustrative image of the topic; it does not show specific equipment or a customer site
← Back to resource catalog
Key points
  • Enter actual conditions in the yellow fields. Mark unverified information as To Be Confirmed, and distinguish measured values from estimates.
  • For multiple workpieces, pick-and-place points or motion sequences, enter each application on a separate row in the workpiece and motion details sheet.
  • The form status checks whether key fields are complete. Engineering review and design release are separate activities.

01Purpose

This form organizes application information from emails, photographs and site discussions into one record for preliminary assessment of pneumatic industrial manipulators or handling systems. Use it to identify missing data, establish operating conditions and review the structure, tooling and workstation concept.

02Intended users

  • Customers, purchasing staff and process engineers preparing a handling-equipment enquiry or project request.
  • Project leads responsible for workpiece, site, cycle-time, utility and safety information.
  • Sales and engineering personnel assessing the initial feasibility of multiple workpieces or representative motion sequences.

03Completion and submission

StepCompletion and submission requirements
1. Basic informationEnter the customer, project, contact, location, project stage, delivery expectations and customer project number.
2. Workpiece conditionsRecord the maximum actual weight of one workpiece, dimensions, center of gravity, material, surface, temperature, permitted gripping areas and incoming orientation.
3. Motion and cycle timeDescribe pick-and-place positions, lifting and horizontal coverage, rotation or turnover, shift patterns, frequency, target cycle time and the current manual operation.
4. Site and utilitiesRecord the installation area, foundation or steel structure, clearances, access routes, obstructions, air and electrical supplies, and environment category.
5. Safety and supporting dataDescribe load retention, unintended-release prevention, surface protection, intersections between personnel and material flow, applicable requirements, and the availability of drawings, 3D files, photographs and videos.
6. Additional applicationsUse one row for each workpiece and representative motion combination. Include overview photographs, pick-and-place positions, obstructions, access routes and workpiece photographs.

04Priority information

Information groupRequired details
WorkpieceMaximum actual weight, overall dimensions, center of gravity and eccentricity, temperature, surface condition and prohibited contact areas.
MotionComplete pick-and-place sequence, orientation changes, stroke, coverage, positioning and prohibited movements.
SiteInstallation space, load-bearing conditions, clearances, interference, material-flow routes and operator positions.
SafetyRetention after air or power loss, unintended-release prevention, surface protection, customer plant standards and acceptance requirements.

05Data-entry requirements

Important:This form supplies design inputs; it is not a commitment to fixed parameters, a final selection or a technical agreement. Form status only checks completion of key fields and does not replace engineering review. Enter the maximum actual weight of a single workpiece. Measure dimensions and positions on site where possible and state the units. Specify high-temperature, dusty, damp, corrosive, cleanroom or explosion-protection conditions; explosion-protection requirements must identify the applicable zone or classification basis.
Before submission:Mark uncertain information as To Be Confirmed. Attach site overviews, pick-and-place positions, access obstructions, workpiece photographs and dimensioned drawings.
Submit by email

Related resources

Open resource center
Selection and solutions

AUREK-RC-SL-001Downloadable

Pneumatic Industrial Manipulator Selection Guide

Selection methods for total load, working envelope, lifting stroke, tooling and installation, with application information and design-comparison points organized around representative workpieces.

Selection and solutionsVersion V1.0Updated 2026-09-07

Need documents or a proposal tailored to your operating conditions?

For documents, drawings or a selection proposal specific to your workpiece and site conditions, share the workpiece and workstation details and an engineer will contact you directly.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.