AUREK · Engineering resources

Technical Documentation Center

Selection methods, installation requirements, operating procedures and maintenance points for pneumatic industrial manipulators. Common forms can be downloaded and filled in; engineering studies describe design and verification methods.

Popular searches:tooling selectionvacuum leakageinstallation acceptanceinspection

Technical documents
62 documents
Categories
5
Downloadable files
62 documents

Frequently used documents

The four most-used documents for selection, quotation, operation and inspection. Read them online, or download to print and fill in.

Selection and solutions

AUREK-RC-SL-001Downloadable

Pneumatic Industrial Manipulator Selection Guide

Selection methods for total load, working envelope, lifting stroke, tooling and installation, with application information and design-comparison points organized around representative workpieces.

Selection and solutionsVersion V1.0Updated 2026-09-07

Operation and training

AUREK-RC-UM-001Downloadable

Pneumatic Industrial Manipulator Operating Manual

Operating requirements organized by equipment structure, installation and commissioning, operation, maintenance and troubleshooting, retaining project parameters and safety requirements for training and site reference.

Operation and trainingVersion V1.1Updated 2026-09-07

Maintenance and troubleshooting

AUREK-RC-MT-001Downloadable

Daily Inspection Checklist for Pneumatic Industrial Manipulators

Pre-start and periodic inspection items with records of abnormalities, corrective actions and responsible-person signatures. The form can be printed for team checks, shift handover and maintenance filing.

Maintenance and troubleshootingVersion V1.0Updated 2026-09-07

Resource catalog

Filter by category and file format, or enter keywords; separate multiple keywords with spaces.

62 resources

Cover images are illustrative of each topic and do not show AUREK equipment or customer sites.

Can't find the document you need?

Tell us about the workpiece and operating conditions, and an engineer can provide a matching technical proposal, installation interface notes or a dedicated document. Drawings and site photographs can be sent by email or WeChat.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.