Site Survey and Photography Checklist

Record workpieces, handling paths, foundations, utility interfaces and environmental conditions consistently. Link photographs, measurements and engineering files through matching references for application assessment.

AUREK-RC-SV-001VersionV1.0Updated2026-09-07

Installation and acceptance
Illustrative image of the topic; it does not show specific equipment or a customer site
← Back to resource catalog
Key points
  • Customer site representatives and AUREK engineering or sales personnel complete the checklist together, using consistent measurement datums, units and file references.
  • Use one reference system for photographs, videos, sketches, 2D/3D files and forms so that entries can be cross-checked and missing information added later.
  • The survey records conditions visible on the survey date and information supplied at that time. Technical agreements and approved drawings govern subsequent design and implementation.

01Purpose

Use this checklist during handling-project site surveys to record permitted workpiece loads, handling paths, available space, foundations, utility interfaces, environmental safety and access restrictions. Number photographs, engineering files and outstanding items separately and link them to measurements for design assessment and later verification.

02Intended users

  • Customer site representatives and process, facilities and safety personnel involved in new installations, retrofits, replacements or capacity expansion.
  • Engineering and sales personnel surveying applications for pneumatic industrial manipulators, vacuum handling, tooling or workstation lifting.
  • Project teams organizing photographs, videos, layouts, foundation information, air and electrical supplies, and control interfaces.

03Survey and data preparation

StepTasks
1. Establish reference datumsRecord the project, workstation, date, participants, coordinate or height datum, units and photography restrictions.
2. Check the workpieceMeasure weight, dimensions, center of gravity and temperature, and inspect the surface. Mark permitted and prohibited contact areas and load limits.
3. Record the motion sequenceFrom the operator's viewpoint, break down pickup, lifting, translation, rotation or turnover, positioning, release and return paths.
4. Measure the siteInclude surrounding and overhead clearances, obstructions, access routes, foundations, lifting access, maintenance space and escape routes.
5. Check interfacesRecord dynamic air pressure and connections, electrical supply, grounding, PLC/I/O, safety circuits and energy-isolation points.
6. Create an image indexNumber photographs consistently from P01, covering the access route, views from all four corners, pick-and-place points, handling paths, obstructions, foundations and interfaces.
7. Close information gapsList required drawings, models, photographs, risk information and responsible persons. Complete review before issuing the survey findings.

04Survey coverage

AreaTypical information
Workpiece and loadingOrientation, center of gravity, permitted gripping directions, datum surfaces, vulnerable features, and allowable force, contact pressure and deformation.
Paths and spacePick-and-place points, highest and lowest positions, swept envelope, exclusion zones, adjacent equipment, and intersections between personnel and material flow.
Foundations and accessConcrete or steel structure, thickness and elevation, load-bearing information, doors and turning clearances, forklift and overhead-crane access, and construction windows.
Engineering dataDimensioned 2D drawings, 3D models, layout coordinates, interface drawings, process cycle times, risk assessments and construction requirements.

05Survey record requirements

Important:This checklist collects site information. Technical agreements, approved drawings and project documents define final parameters, interfaces, responsibilities and safety requirements. State units and measurement datums, and explain exclusions. Confirm confidentiality and photography authorization before taking photographs. The thematic images on this page must not be presented as customer-site photographs or evidence of project delivery.
After the survey:Submit the form, photograph index, videos, layout, foundation and interface information as one coordinated revision. Assign a responsible person and due date to each remaining item.
Submit survey information

Related resources

Open resource center
Installation and acceptance

AUREK-RC-IN-001Downloadable

Pre-installation Site Confirmation Checklist

Check installation information for the workpiece, motions, foundation, utilities and safety conditions, with supporting site photographs and responsible-person records for design assessment and installation preparation.

Installation and acceptanceVersion V1.0Updated 2026-09-07

Need documents or a proposal tailored to your operating conditions?

For documents, drawings or a selection proposal specific to your workpiece and site conditions, share the workpiece and workstation details and an engineer will contact you directly.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.