Selection and Solutions · Downloadable

AUREK Product Overview and Quick Selection Handbook

Explore ARK-series pneumatic industrial manipulators, custom tooling, vacuum handling and workstation lifting. The handbook relates product combinations and selection factors to the workpiece, motion and site conditions.

AUREK-PB-ARK-001VersionV1.0Updated2026-09-07

Selection and solutions
Illustrative image of the topic; it does not show specific equipment or a customer site
← Back to resource catalog
Key points
  • Gather workpiece, motion, pick-and-place, cycle-time, site-space, utility, environmental and safety requirements before comparing structural arrangements.
  • ARK-S, ARK-M and ARK-O provide starting points for fixed workstations, shared use across workstations and overhead arrangements respectively. Project conditions determine the configuration.
  • Design and check the tooling, complete machine, pneumatic circuit, operating handles and safety logic for the same application.

01Purpose

This handbook introduces AUREK's product combinations to purchasing, engineering and operating teams. Begin with the workpiece and workstation, then consider the mechanical arrangement, end tooling and safety requirements. Assemble load, arm-length and site information for the enquiry.

02Intended users

  • Manufacturers assessing heavy-load handling, machine loading and unloading, turnover, assembly positioning or short-distance transfer.
  • Project personnel responsible for workstation planning, equipment purchasing, production processes, EHS or facility conditions.
  • Engineers comparing column-mounted, mobile and overhead arrangements, together with vacuum, clamping, hook or internal-expansion tooling.

03Using the selection guide

StepInformation to check
1. Describe the workpieceMaximum actual weight, dimensions, center of gravity, material, surface, temperature, permitted contact areas and vulnerable features.
2. Define the motion sequenceThe complete path for pickup, lifting, translation, rotation, turnover, positioning, release and return.
3. Shortlist the arrangementConsider ARK-S for fixed workstations, ARK-M for shared use across workstations, and ARK-O where floor space is limited or overhead coverage is required.
4. Match the toolingSelect the tooling approach using the available suction surfaces, load-bearing points, eccentric loads, surface protection, orientation changes and release conditions.
5. Review the engineeringCheck the combined load, operating envelope, installation conditions, air or electrical supply, abnormal states and acceptance methods together.

04Selection priorities

AreaMain considerations
pneumatic industrial manipulatorCombined workpiece and tooling weight, center of gravity and eccentric load, lowest and highest pick-and-place points, horizontal coverage and operator positions.
End toolingReliable retention, workpiece protection, turnover or rotation, pressure-loss states, unintended-release prevention and supported-placement confirmation.
Vacuum handlingFlatness, porosity, roughness, contamination, effective suction area, leakage and vacuum retention.
Site installationFloor or overhead load-bearing capacity, clearances, obstructions, access routes, utility interfaces, and intersections between personnel and material flow.

05Selection conditions

Important:This public overview supports preliminary selection; it is not a quotation, technical agreement, operating manual, acceptance standard or safety guarantee. Structural options and common air-supply ranges do not define fixed specifications or maximum capacity. Final load, radius, stroke, tooling, control and safety arrangements must follow measured workpiece data, risk assessment and mutually approved controlled documents. Reassess the configuration when operating conditions change.
Ready for an application review?Provide workpiece photographs or drawings, the complete motion sequence, cycle time, site layout, utilities and safety requirements.
Submit application details

Related resources

Open resource center
Selection and solutions

AUREK-RC-SL-001Downloadable

Pneumatic Industrial Manipulator Selection Guide

Selection methods for total load, working envelope, lifting stroke, tooling and installation, with application information and design-comparison points organized around representative workpieces.

Selection and solutionsVersion V1.0Updated 2026-09-07

Need documents or a proposal tailored to your operating conditions?

For documents, drawings or a selection proposal specific to your workpiece and site conditions, share the workpiece and workstation details and an engineer will contact you directly.

AUREK WeChat QR code
WeChatScan to contact an engineer and send drawings, photos or videos of your worksite. You can also email sales@aurek.cn.